Purpose-Unplanned changes in construction projects are common and lead to disruptive effects such as project delays, cost overruns and quality deviations. Rework due to unplanned changes can cost 10-15 per cent of contract value. By managing these changes more effectively, these disruptive effects can be minimised. Previous research has approached this problem from an information-processing view. In this knowledge age, the purpose of this paper is to argue that effective change management can be brought about by better understanding the significant role of knowledge during change situations. Design/methodology/approach - Within this knowledge-based context, the question of how construction project teams manage knowledge during unplanned change in the construction phase within collaborative team settings is investigated through a selected case study sample within the UK construction industry. Findings- Case study findings conclude that different forms of knowledge are created and shared between project team members during change events which is very much socially constructed and centred on tacit knowledge and experience of project personnel. Originality/value- Building on the case study findings the paper finally offers a model that represents the role of knowledge during managing project change.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In 'Tales from Ovid' and 'War Music' respectively, Ted Hughes and Christopher Logue turned to classical epic as source material and a model for contemporary poetry. In this essay I consider the different ways in which they work with the original epic poems and how they rework them both textually and generically. In the process, I suggest, Hughes gives his readers an Ovid modeled on his own, vatic conception of Homer, while Logue reworks Homer in a manner that is essentially Ovidian.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In today's global economic conditions, improving the productivity of the construction industry is becoming more pressing than ever. Several factors impact the efficiency of construction operatives, but motivation is among the most important. Since low productivity is one of the significant challenges facing the construction industry in the State of Kuwait, the objective of this case study is to identify, explore, and rank the relative importance of the factors perceived to impact the motivational level of master craftsmen involved in primary construction trades. To achieve this objective, a structured questionnaire survey comprising 23 factors, which were shortlisted based on relevant previous research on motivation, the input of local industry experts, and numerous interviews with skilled operatives, was distributed to a large number of master craftsmen. Using the “Relative Importance Index” technique, the following prominent factors are identified: (1) payment delay; (2) rework; (3) lack of a financial incentive scheme; (4) the extent of change orders during execution; (5) incompetent supervisors; (6) delays in responding to Requests For Information (RFI); (7) overcrowding and operatives interface; (8) unrealistic scheduling and performance expectation; (9) shortage of materials on site; and (10) drawings quality level. The findings can be used to provide industry practitioners with guidance for focusing, acting upon, and controlling the critical factors influencing the performance of master craftsmen, hence, assist in achieving an efficient utilization of the workforce, and a reasonable level of competitiveness and cost effective operation.