7 resultados para Relative construction

em CentAUR: Central Archive University of Reading - UK


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Theoretical understanding of the implementation and use of innovations within construction contexts is discussed and developed. It is argued that both the rhetoric of the 'improvement agenda' within construction and theories of innovation fail to account for the complex contexts and disparate perspectives which characterize construction work. To address this, the concept of relative boundedness is offered. Relatively unbounded innovation is characterized by a lack of a coherent central driving force or mediator with the ability to reconcile potential conflicts and overcome resistance to implementation. This is a situation not exclusive to, but certainly indicative of, much construction project work. Drawing on empirical material from the implementation of new design and coordination technologies on a large construction project, the concept is developed, concentrating on the negotiations and translations implementation mobilized. An actor-network theory (ANT) approach is adopted, which emphasizes the roles that both human actors and non-human agents play in the performance and outcomes of these interactions. Three aspects of how relative boundedness is constituted and affected are described; through the robustness of existing practices and expectations, through the delegation of interests on to technological artefacts and through the mobilization of actors and artefacts to constrain and limit the scope of negotiations over new technology implementation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Firms form consortia in order to win contracts. Once a project has been awarded to a consortium each member then concentrates on his or her own contract with the client. Therefore, consortia are marketing devices, which present the impression of teamworking, but the production process is just as fragmented as under conventional procurement methods. In this way, the consortium forms a barrier between the client and the actual construction production process. Firms form consortia, not as a simple development of normal ways of working, but because the circumstances for specific projects make it a necessary vehicle. These circumstances include projects that are too large or too complex to undertake alone or projects that require on-going services which cannot be provided by the individual firms inhouse. It is not a preferred way of working, because participants carry extra risk in the form of liability for the actions of their partners in the consortium. The behaviour of members of consortia is determined by their relative power, based on several factors, including financial commitment and ease of replacement. The level of supply chain visibility to the public sector client and to the industry is reduced by the existence of a consortium because the consortium forms an additional obstacle between the client and the firms undertaking the actual construction work. Supply chain visibility matters to the client who otherwise loses control over the process of construction or service provision, while remaining accountable for cost overruns. To overcome this separation there is a convincing argument in favour of adopting the approach put forward in the Project Partnering Contract 2000 (PPC2000) Agreement. Members of consortia do not necessarily go on to work in the same consortia again because members need to respond flexibly to opportunities as and when they arise. Decision-making processes within consortia tend to be on an ad hoc basis. Construction risk is taken by the contractor and the construction supply chain but the reputational risk is carried by all the firms associated with a consortium. There is a wide variation in the manner that consortia are formed, determined by the individual circumstances of each project; its requirements, size and complexity, and the attitude of individual project leaders. However, there are a number of close working relationships based on generic models of consortia-like arrangements for the purpose of building production, such as the Housing Corporation Guidance Notes and the PPC2000.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Anticipating the future is increasingly being seen as a useful way to align, direct and improve current organizational strategy. Several such 'future studies' have been produced which envision various construction industry scenarios which result from technological and socio-economic trends and influences. Thirteen construction-related future studies are critically reviewed. Most studies fail to address the complexities and uncertainties of both the present and the future, and fail to explore the connections between global, local, construction-specific and more widespread factors. The methodological approaches used in these studies do not generate any significantly different advice or recommendations for the industry than those emerging from the much larger canon of non-future oriented construction research. As such, these reports are less about the future than the present. If future studies are to make a worthwhile contribution to construction, it is critical that they develop our appreciation of the practical ability of stakeholders to influence some aspects of the future and not others, and an awareness of the competing agendas and the relative benefits and disadvantages of specific futures within the construction sector. Only then can future studies provide insights and help in preparing for the opportunities and threats the future may bring.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The commercial process in construction projects is an expensive and highly variable overhead. Collaborative working practices carry many benefits, which are widely disseminated, but little information is available about their costs. Transaction Cost Economics is a theoretical framework that seeks explanations for why there are firms and how the boundaries of firms are defined through the “make-or-buy” decision. However, it is not a framework that offers explanations for the relative costs of procuring construction projects in different ways. The idea that different methods of procurement will have characteristically different costs is tested by way of a survey. The relevance of transaction cost economics to the study of commercial costs in procurement is doubtful. The survey shows that collaborative working methods cost neither more nor less than traditional methods. But the benefits of collaboration mean that there is a great deal of enthusiasm for collaboration rather than competition.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Individuals with Williams syndrome (WS) display poor visuo-spatial cognition relative to verbal abilities. Furthermore, whilst perceptual abilities are delayed, visuo-spatial construction abilities are comparatively even weaker, and are characterised by a local bias. We investigated whether his differentiation in visuo-spatial abilities can be explained by a deficit in coding spatial location in WS. This can be measured by assessing participants' understanding of the spatial relations between objects within a visual scene. Coordinate and categorical spatial relations were investigated independently in four participant groups: 21 individuals with WS; 21 typically developing (TD) children matched for non-verbal ability; 20 typically developing controls of a lower non-verbal ability; and 21 adults. A third task measured understanding of visual colour relations. Results indicated first, that the comprehension of categorical and coordinate spatial relations is equally poor in WS. Second, that the comprehension of visual relations is also at an equivalent level to spatial relational understanding in this population. These results can explain the difference in performance on visuo-spatial perception and construction tasks in WS. In addition, both the WS and control groups displayed response biases in the spatial tasks. However, the direction of bias differed across the groups. This finding is explored in relation to current theories of spatial location coding. (c) 2005 Elsevier Inc. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper re-examines the relative importance of sector and regional effects in determining property returns. Using the largest property database currently available in the world, we decompose the returns on individual properties into a national effect, common to all properties, and a number of sector and regional factors. However, unlike previous studies, we categorise the individual property data into an ever-increasing number of property-types and regions, from a simple 3-by-3 classification, up to a 10 by 63 sector/region classification. In this way we can test the impact that a finer classification has on the sector and regional effects. We confirm the earlier findings of previous studies that sector-specific effects have a greater influence on property returns than regional effects. We also find that the impact of the sector effect is robust across different classifications of sectors and regions. Nonetheless, the more refined sector and regional partitions uncover some interesting sector and regional differences, which were obscured in previous studies. All of which has important implications for property portfolio construction and analysis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In today's global economic conditions, improving the productivity of the construction industry is becoming more pressing than ever. Several factors impact the efficiency of construction operatives, but motivation is among the most important. Since low productivity is one of the significant challenges facing the construction industry in the State of Kuwait, the objective of this case study is to identify, explore, and rank the relative importance of the factors perceived to impact the motivational level of master craftsmen involved in primary construction trades. To achieve this objective, a structured questionnaire survey comprising 23 factors, which were shortlisted based on relevant previous research on motivation, the input of local industry experts, and numerous interviews with skilled operatives, was distributed to a large number of master craftsmen. Using the “Relative Importance Index” technique, the following prominent factors are identified: (1) payment delay; (2) rework; (3) lack of a financial incentive scheme; (4) the extent of change orders during execution; (5) incompetent supervisors; (6) delays in responding to Requests For Information (RFI); (7) overcrowding and operatives interface; (8) unrealistic scheduling and performance expectation; (9) shortage of materials on site; and (10) drawings quality level. The findings can be used to provide industry practitioners with guidance for focusing, acting upon, and controlling the critical factors influencing the performance of master craftsmen, hence, assist in achieving an efficient utilization of the workforce, and a reasonable level of competitiveness and cost effective operation.