3 resultados para Rear Lighting Systems.

em CentAUR: Central Archive University of Reading - UK


Relevância:

90.00% 90.00%

Publicador:

Resumo:

An extended research project, funded by the Thomas Pocklington Trust, and carried out by the Research Group for Inclusive Environments (RGIE) at The University of Reading, has examined the lighting found in the homes of people who are visually impaired (VIP). This paper will summarise the results of this substantive study. All the surveyed homes have been occupied by people with sight loss, some of the dwellings were shared with sighted partners. There are several safety issues concerning domestic lighting where inadequate provision may contribute to the incidence of personal injuries occurring in the home. Qualitative and quantitative data from questionnaires, photometric surveys and faceto- face interviews have been obtained from 57 homes. The nature and extent of the visual impairment of each study participant has been identified. This paper will identify important findings from the study, including: a range of areas and tasks within the home that visually impaired people find inadequately lit; the variability of illuminance provided for task lighting and general lighting; and how effective visually impaired people find a selection different lighting systems to those that they commonly use. The research team are able to offer preliminary design guidance for lighting the homes of people who are visually impaired. These will be summarised in the paper.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building services are worth about 2% GDP and are essential for the effective and efficient operations of the building. It is increasingly recognised that the value of a building is related to the way it supports the client organisation’s ongoing business operations. Building services are central to the functional performance of buildings and provide the necessary conditions for health, well-being, safety and security of the occupants. They frequently comprise several technologically distinct sub-systems and their design and construction requires the involvement of numerous disciplines and trades. Designers and contractors working on the same project are frequently employed by different companies. Materials and equipment is supplied by a diverse range of manufacturers. Facilities managers are responsible for operation of the building service in use. The coordination between these participants is crucially important to achieve optimum performance, but too often is neglected. This leaves room for serious faults. The need for effective integration is important. Modern technology offers increasing opportunities for integrated personal-control systems for lighting, ventilation and security as well as interoperability between systems. Opportunities for a new mode of systems integration are provided by the emergence of PFI/PPP procurements frameworks. This paper attempts to establish how systems integration can be achieved in the process of designing, constructing and operating building services. The essence of the paper therefore is to envisage the emergent organisational responses to the realisation of building services as an interactive systems network.