41 resultados para Real Options Theory
em CentAUR: Central Archive University of Reading - UK
Resumo:
This paper contributes to a fast growing literature which introduces game theory in the analysis of real option investments in a competitive setting. Specifically, in this paper we focus on the issue of multiple equilibria and on the implications that different equilibrium selections may have for the pricing of real options and for subsequent strategic decisions. We present some theoretical results of the necessary conditions to have multiple equilibria and we show under which conditions different tie-breaking rules result in different economic decisions. We then present a numerical exercise using the in formation set obtained on a real estate development in South London. We find that risk aversion reduces option value and this reduction decreases marginally as negative externalities decrease.
Resumo:
While search is normally modelled by economists purely in terms of decisions over making observations, this paper models it as a process in which information is gained through feedback from innovatory product launches. The information gained can then be used to decide whether to exercise real options. In the model the initial decisions involve a product design and the scale of production capacity. There are then real options to change these factors based on what is learned. The case of launching product variants in parallel is also considered. Under ‘true’ uncertainty, the model can be seen in terms of heuristic decision-making based on subjective beliefs with limited foresight. Search costs, the values of the real options, beliefs, and the cost of capital are all shown to be significant in determining the search path.
Resumo:
The application of real options theory to commercial real estate has developed rapidly during the last 15 Years. In particular, several pricing models have been applied to value real options embedded in development projects. In this study we use a case study of a mixed use development scheme and identify the major implied and explicit real options available to the developer. We offer the perspective of a real market application by exploring different binomial models and the associated methods of estimating the crucial parameter of volatility. We include simple binomial lattices, quadranomial lattices and demonstrate the sensitivity of the results to the choice of inputs and method.
Resumo:
Volatility, or the variability of the underlying asset, is one of the key fundamental components of property derivative pricing and in the application of real option models in development analysis. There has been relatively little work on volatility in real terms of its application to property derivatives and the real options analysis. Most research on volatility stems from investment performance (Nathakumaran & Newell (1995), Brown & Matysiak 2000, Booth & Matysiak 2001). Historic standard deviation is often used as a proxy for volatility and there has been a reliance on indices, which are subject to valuation smoothing effects. Transaction prices are considered to be more volatile than the traditional standard deviations of appraisal based indices. This could lead, arguably, to inefficiencies and mis-pricing, particularly if it is also accepted that changes evolve randomly over time and where future volatility and not an ex-post measure is the key (Sing 1998). If history does not repeat, or provides an unreliable measure, then estimating model based (implied) volatility is an alternative approach (Patel & Sing 2000). This paper is the first of two that employ alternative approaches to calculating and capturing volatility in UK real estate for the purposes of applying the measure to derivative pricing and real option models. It draws on a uniquely constructed IPD/Gerald Eve transactions database, containing over 21,000 properties over the period 1983-2005. In this first paper the magnitude of historic amplification associated with asset returns by sector and geographic spread is looked at. In the subsequent paper the focus will be upon model based (implied) volatility.
Resumo:
Real estate development appraisal is a quantification of future expectations. The appraisal model relies upon the valuer/developer having an understanding of the future in terms of the future marketability of the completed development and the future cost of development. In some cases the developer has some degree of control over the possible variation in the variables, as with the cost of construction through the choice of specification. However, other variables, such as the sale price of the final product, are totally dependent upon the vagaries of the market at the completion date. To try to address the risk of a different outcome to the one expected (modelled) the developer will often carry out a sensitivity analysis on the development. However, traditional sensitivity analysis has generally only looked at the best and worst scenarios and has focused on the anticipated or expected outcomes. This does not take into account uncertainty and the range of outcomes that can happen. A fuller analysis should include examination of the uncertainties in each of the components of the appraisal and account for the appropriate distributions of the variables. Similarly, as many of the variables in the model are not independent, the variables need to be correlated. This requires a standardised approach and we suggest that the use of a generic forecasting software package, in this case Crystal Ball, allows the analyst to work with an existing development appraisal model set up in Excel (or other spreadsheet) and to work with a predetermined set of probability distributions. Without a full knowledge of risk, developers are unable to determine the anticipated level of return that should be sought to compensate for the risk. This model allows the user a better understanding of the possible outcomes for the development. Ultimately the final decision will be made relative to current expectations and current business constraints, but by assessing the upside and downside risks more appropriately, the decision maker should be better placed to make a more informed and “better”.
Resumo:
Firms are faced with a wider set of choices when they identify a need for new office space. They can build or purchase accommodation, lease space for long or short periods with or without the inclusion of services, or they can use “instant office” solutions provided by serviced office operators. But how do they evaluate these alternatives and are they able to make rational choices? The research found that the shortening of business horizons lead to the desire for more office space on short-term contracts often with the inclusion of at least some facilities management and business support services. The need for greater flexibility, particularly in financial terms, was highlighted as an important criteria when selecting new office accommodation. The current office portfolios held were perceived not to meet these requirements. However, there was often a lack of good quality data available within occupiers which could be used to help them analyse the range of choices in the market. Additionally, there were other organisational constraints to making decisions about inclusive real estate products. These included fragmentation of decisions-making, internal politics and the lack of assessment of business risk alongside real estate risk. Overall therefore, corporate occupiers themselves act as an interial force to the development of new and innovative real estate products.
Resumo:
Formal and analytical models that contractors can use to assess and price project risk at the tender stage have proliferated in recent years. However, they are rarely used in practice. Introducing more models would, therefore, not necessarily help. A better understanding is needed of how contractors arrive at a bid price in practice, and how, and in what circumstances, risk apportionment actually influences pricing levels. More than 60 proposed risk models for contractors that are published in journals were examined and classified. Then exploratory interviews with five UK contractors and documentary analyses on how contractors price work generally and risk specifically were carried out to help in comparing the propositions from the literature to what contractors actually do. No comprehensive literature on the real bidding processes used in practice was found, and there is no evidence that pricing is systematic. Hence, systematic risk and pricing models for contractors may have no justifiable basis. Contractors process their bids through certain tendering gateways. They acknowledge the risk that they should price. However, the final settlement depends on a set of complex, micro-economic factors. Hence, risk accountability may be smaller than its true cost to the contractor. Risk apportionment occurs at three stages of the whole bid-pricing process. However, analytical approaches tend not to incorporate this, although they could.
Resumo:
In a previous paper (J. of Differential Equations, Vol. 249 (2010), 3081-3098) we examined a family of periodic Sturm-Liouville problems with boundary and interior singularities which are highly non-self-adjoint but have only real eigenvalues. We now establish Schatten class properties of the associated resolvent operator.
Resumo:
Another Proof of the Preceding Theory was produced as part of a residency run by Artists in Archeology in conjunction with the Stonehenge Riverside project. The film explores the relationship between science, work and ritual, imagining archaeology as a future cult. As two robed disciples stray off from the dig, they are drawn to the drone of the stones and proceed to play the henge like a gigantic Theremin. Just as a Theremin is played with the hand interfering in an electric circuit and producing sound without contact, so the stones respond to the choreographed bodily proximity. Finally, one of the two continues alone to the avenue at Avebury, where the magnetic pull of the stones reaches its climax. Shot on VHS, the film features a score by Zuzushi Monkey, with percussion and theremin sounds mirroring the action. The performers are mostly artists and archeologists from the art and archaeology teams. The archeologists were encouraged to perform their normal work in the robes, in an attempt to explore the meeting points of science and ritual and interrogate our relationship to an ultimately unknowable prehistoric past where activities we do not understand are relegated to the realm of religion. Stonehenge has unique acoustic properties, it’s large sarsen stones are finely worked on the inside, left rough on the outside, intensifying sound waves within the inner horseshoe, but since their real use, having been built over centuries, remains ambiguous, the film proposes that our attempts to decode them may themselves become encoded in their cumulative meaning for future researchers.