61 resultados para Project 2006-036-A : Multi-Outcome Construction Policies
em CentAUR: Central Archive University of Reading - UK
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an engineering factory and offices. A multi-disciplinary professional practice was used to manage and design the project. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of buildings provision can be viewed as systems and sub-systems which are differentiated form each other at decision points. Further to this, the sub-systematic analysis of the relationship between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. There was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's proposition. However, the project was subject to string environmental forces which the project organization was not capable of entirely overcoming.
Resumo:
Currently, multi-attribute auctions are becoming widespread awarding mechanisms for contracts in construction, and in these auctions, criteria other than price are taken into account for ranking bidder proposals. Therefore, being the lowest-price bidder is no longer a guarantee of being awarded, thus increasing the importance of measuring any bidder’s performance when not only the first position (lowest price) matters. Modeling position performance allows a tender manager to calculate the probability curves related to the more likely positions to be occupied by any bidder who enters a competitive auction irrespective of the actual number of future participating bidders. This paper details a practical methodology based on simple statistical calculations for modeling the performance of a single bidder or a group of bidders, constituting a useful resource for analyzing one’s own success while benchmarking potential bidding competitors.
Resumo:
The UK construction industry is in the process of trying to adopt a new culture based on the large-scale take up of innovative practices. Through the Demonstration Project process many organizations are implementing changed practices and learning from the experiences of others. This is probably the largest experiment in innovation in any industry in recent times. The long-term success will be measured by the effectiveness of embedding the new practices in the organization. As yet there is no recognized approach to measuring the receptivity of the organization to the innovation process as an indication of the likelihood of long-term development. The development of an appropriate approach is described here. Existing approaches to the measurement of the take up of innovation were reviewed and where appropriate used as the base for the development of a questionnaire. The questionnaire could be applicable to multi-organizational construction project situations such that the output could determine an individual organization's innovative practices via an innovation scorecard, a project team's approach or it could be used to survey a wide cross-section of the industry.
Resumo:
Project management (PM) is a globally recognized discipline and has been widely adopted within the construction industry. Despite advancements in the PM discipline, the ineffective traditional management system, typical of the non-executive PM structure, is still widely used in the Nigerian construction industry. The aim of this paper is thus to explore the challenges facing the adoption of the executive PM structure in Nigeria. The paper first assesses the level of growth of PM in Nigeria using UK best practices as a benchmark and identifies the key PM characteristics in the two countries. Focus group interviews were used to collect the primary data for the study and content analysis was used to present the results in a thematic format. The study revealed the key barriers to the adoption of an executive PM structure in Nigeria as a lack of proper awareness, unfavorable policies, skill shortages, the traditional culture of stakeholders and the absence of a regulatory body. It is recommended that the government, as a major player/client in the Nigerian construction industry, should lead the campaign to change the traditional industry approach to project management. This is necessary if construction stakeholders in Nigeria are to be educated and encouraged towards adopting and putting into practice effective PM.
Resumo:
The Bahrain International Circuit (BIC) is considered its one of the best international racing car track in terms of technical aspects and architectural quality. Two Formula 1 races have been hosted in the Kingdom of Bahrain, in 2004 and 2005, at BIC. The BIC had recently won the award of the best international racing car circuit. This paper highlights on the elements that contributed to the success of such project starting from the architectural aspects, construction, challenges, tendering process, risk management, the workforce, speed of the construction method, and future prospects for harnessing solar and wind energy for sustainable electrification and production of water for the circuit, i.e. making BIC green and environment-friendly international circuit.
Resumo:
In financial decision-making processes, the adopted weights of the objective functions have significant impacts on the final decision outcome. However, conventional rating and weighting methods exhibit difficulty in deriving appropriate weights for complex decision-making problems with imprecise information. Entropy is a quantitative measure of uncertainty and has been useful in exploring weights of attributes in decision making. A fuzzy and entropy-based mathematical approach is employed to solve the weighting problem of the objective functions in an overall cash-flow model. The multiproject being undertaken by a medium-size construction firm in Hong Kong was used as a real case study to demonstrate the application of entropy. Its application in multiproject cash flow situations is demonstrated. The results indicate that the overall before-tax profit was HK$ 0.11 millions lower after the introduction of appropriate weights. In addition, the best time to invest in new projects arising from positive cash flow was identified to be two working months earlier than the nonweight system.
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private development consisting of an extension to an existing building to provide a wholesale butchery facility. The project used a conventionally organized management process. The organization structure adopted on the project is analysed using concepts from the systems theory, which are included in Walkers theoretical model of the structure of building project organizations. This model proposes that the process of building provision can be viewed as systems and sub-systems that are differentiated from each other at decision points. Further to this, the sub-systems can be viewed as the interaction of managing system and operating system. Using Walkers model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. The project's organization structure diverged from the models propositions resulting in delay to the project's completion and cost overrun but the client was satisfied with the project functionally.
Resumo:
The basic premise of transaction-cost theory is that the decision to outsource, rather than to undertake work in-house, is determined by the relative costs incurred in each of these forms of economic organization. In construction the "make or buy" decision invariably leads to a contract. Reducing the costs of entering into a contractual relationship (transaction costs) raises the value of production and is therefore desirable. Commonly applied methods of contractor selection may not minimise the costs of contracting. Research evidence suggests that although competitive tendering typically results in the lowest bidder winning the contract this may not represent the lowest project cost after completion. Multi-parameter and quantitative models for contractor selection have been developed to identify the best (or least risky) among bidders. A major area in which research is still needed is in investigating the impact of different methods of contractor selection on the costs of entering into a contract and the decision to outsource.
Resumo:
This thesis is aimed to initiate implementing sustainable building construction in the kingdom of Bahrain, i.e. Building-Integration PhotoVoltaic (BIPV) or Wind Energy (BIWE). It highlights the main constrains that discourage such modern concept in building and construction. Three groups have been questioned using a questionnaire. These are the policy and decision makers, the leading consultants and the contractors. The main constrains of the dissemination of BIVP and BIWE, according to the policy and decision makers, are: lack of knowledge and awareness of the public in sustainable technology, low cost of electricity, low cost of gas and oil and difficulty in applying local environmental taxes. The consultants had attributed the constrains to ignorance of life cycle cost of PV and Wind turbines systems, lack of education and knowledge in sustainable design, political system, shortage of markets importing sustainable technologies and client worries in profitability and pay-back period. The contractors are found to be very enthusiastic and ready to take over any sustainable building project and prefer to have a construction manger to coordinate between the design and contracting team. Design and Build is found the favorable procurement method in Bahrain for conducting BIPV or BIWE projects.