31 resultados para Process Management, Maturity Model, CMM, Delphi Study
em CentAUR: Central Archive University of Reading - UK
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an extension to existing buildings to provide a warehouse, services block and packing line. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of building provision can be viewed as systems and subsystems which are differentiated from each other at decision points. Further to this, the subsystems can be viewed as the interaction of managing system and operating system. Using Walker's model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficacy of the organizational structure used. The causes of the client's dissatisfaction with the outcome of the project were lack of integration and complexity of the managing system. However, there was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's propositions.
Resumo:
The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports by Latham (1994, Constructing the Team, HMSO, London) and Egan (1998, Rethinking Construction, HMSO, London). A major problem for construction companies is the lack of project predictability. One method of increasing predictability and delivering increased customer value is through the systematic management of construction processes. However, the industry has no methodological mechanism to assess process capability and prioritise process improvements. Standardized Process Improvement for Construction Enterprises (SPICE) is a research project that is attempting to develop a stepwise process improvement framework for the construction industry, utilizing experience from the software industry, and in particular the Capability Maturity Model (CMM), which has resulted in significant productivity improvements in the software industry. This paper introduces SPICE concepts and presents the results from two case studies conducted on design and build projects. These studies have provided further in-sight into the relevance and accuracy of the framework, as well as its value for the construction sector.
Resumo:
This paper investigates and evaluates the process of knowledge transfer in construction projects. Due to the highly competitive nature of business environments, knowledge transfer between organisations has become increasingly popular in recent years. However, although organisations can realise remarkable benefits by transferring knowledge from one unit to another, successful knowledge transfer can be difficult to achieve. The discussions presented in the paper are mainly based on findings of two case studies. The two cases were selected from Private Finance Initiative (PFI) projects in the UK. According to the case study findings, different stages of a knowledge transfer process can be overlapped, omitted, repeated as well as intermitted and then restarted. One of the significant findings of the case studies was the role of the "knowledge mediator". In selected case studies, there were external consultants and expert staff in the form of knowledge mediators. The importance of their roles was frequently highlighted by the interview participants. They were not only facilitating the close liaison between the knowledge source and the receiver, but also their role was strongly associated with practices of translation and interpretation. This combined role of mediator/translator, therefore, appears to be particularly significant for inter-organisational knowledge transfer in PFI projects.
Resumo:
Introduction. Feature usage is a pre-requisite to realising the benefits of investments in feature rich systems. We propose that conceptualising the dependent variable 'system use' as 'level of use' and specifying it as a formative construct has greater value for measuring the post-adoption use of feature rich systems. We then validate the content of the construct as a first step in developing a research instrument to measure it. The context of our study is the post-adoption use of electronic medical records (EMR) by primary care physicians. Method. Initially, a literature review of the empirical context defines the scope based on prior studies. Having identified core features from the literature, they are further refined with the help of experts in a consensus seeking process that follows the Delphi technique. Results.The methodology was successfully applied to EMRs, which were selected as an example of feature rich systems. A review of EMR usage and regulatory standards provided the feature input for the first round of the Delphi process. A panel of experts then reached consensus after four rounds, identifying ten task-based features that would be indicators of level of use. Conclusions. To study why some users deploy more advanced features than others, theories of post-adoption require a rich formative dependent variable that measures level of use. We have demonstrated that a context sensitive literature review followed by refinement through a consensus seeking process is a suitable methodology to validate the content of this dependent variable. This is the first step of instrument development prior to statistical confirmation with a larger sample.
Resumo:
The work reported in this paper is motivated towards the development of a mathematical model for swarm systems based on macroscopic primitives. A pattern formation and transformation model is proposed. The pattern transformation model comprises two general methods for pattern transformation, namely a macroscopic transformation method and a mathematical transformation method. The problem of transformation is formally expressed and four special cases of transformation are considered. Simulations to confirm the feasibility of the proposed models and transformation methods are presented. Comparison between the two transformation methods is also reported.
Resumo:
In this study a gridded hourly 1-km precipitation dataset for a meso-scale catchment (4,062 km2) of the Upper Severn River, UK was constructed using rainfall radar data to disaggregate a daily precipitation (rain gauge) dataset. The dataset was compared to an hourly precipitation dataset created entirely from rainfall radar data. Results found that when assessed against gauge readings and as input to the Lisflood-RR hydrological model, the rain gauge/radar disaggregated dataset performed the best suggesting that this simple method of combining rainfall radar data with rain gauge readings can provide temporally detailed precipitation datasets for calibrating hydrological models.
Resumo:
Changes to client requirements are inevitable during construction. Industry discourse is concerned with minimizing and controlling changes. However, accounts of practices involved in making changes are rare. In response to calls for more research into working practices, an ethnographic study of a live hospital project was undertaken to explore how changes are made. A vignette of a meeting exploring the investigation of changes illustrates the issues. This represents an example from the ethnographic fieldwork, which produced many observations. There was a strong emphasis on using change management procedures contained within the contract to investigate changes, even when it was known that the change was not required. For the practitioners, this was a way of demonstrating best practice, transparent and accountable decision-making regarding changes. Hence, concerns for following procedures sometimes overshadowed considerations about whether or not a change was required to improve the functionality of the building. However, the procedures acted as boundary objects between the communities of practice involved on the project by coordinating the work of managing changes. Insights suggest how contract procedures facilitate and impede the making of changes, which can inform policy guidance and contract drafting.
Resumo:
Foundation construction process has been an important key point in a successful construction engineering. The frequency of using diaphragm wall construction method among many deep excavation construction methods in Taiwan is the highest in the world. The traditional view of managing diaphragm wall unit in the sequencing of construction activities is to establish each phase of the sequencing of construction activities by heuristics. However, it conflicts final phase of engineering construction with unit construction and effects planning construction time. In order to avoid this kind of situation, we use management of science in the study of diaphragm wall unit construction to formulate multi-objective combinational optimization problem. Because the characteristic (belong to NP-Complete problem) of problem mathematic model is multi-objective and combining explosive, it is advised that using the 2-type Self-Learning Neural Network (SLNN) to solve the N=12, 24, 36 of diaphragm wall unit in the sequencing of construction activities program problem. In order to compare the liability of the results, this study will use random researching method in comparison with the SLNN. It is found that the testing result of SLNN is superior to random researching method in whether solution-quality or Solving-efficiency.
Resumo:
The formulation of a new process-based crop model, the general large-area model (GLAM) for annual crops is presented. The model has been designed to operate on spatial scales commensurate with those of global and regional climate models. It aims to simulate the impact of climate on crop yield. Procedures for model parameter determination and optimisation are described, and demonstrated for the prediction of groundnut (i.e. peanut; Arachis hypogaea L.) yields across India for the period 1966-1989. Optimal parameters (e.g. extinction coefficient, transpiration efficiency, rate of change of harvest index) were stable over space and time, provided the estimate of the yield technology trend was based on the full 24-year period. The model has two location-specific parameters, the planting date, and the yield gap parameter. The latter varies spatially and is determined by calibration. The optimal value varies slightly when different input data are used. The model was tested using a historical data set on a 2.5degrees x 2.5degrees grid to simulate yields. Three sites are examined in detail-grid cells from Gujarat in the west, Andhra Pradesh towards the south, and Uttar Pradesh in the north. Agreement between observed and modelled yield was variable, with correlation coefficients of 0.74, 0.42 and 0, respectively. Skill was highest where the climate signal was greatest, and correlations were comparable to or greater than correlations with seasonal mean rainfall. Yields from all 35 cells were aggregated to simulate all-India yield. The correlation coefficient between observed and simulated yields was 0.76, and the root mean square error was 8.4% of the mean yield. The model can be easily extended to any annual crop for the investigation of the impacts of climate variability (or change) on crop yield over large areas. (C) 2004 Elsevier B.V. All rights reserved.
Resumo:
Purpose – At the heart of knowledge management (KM) are the people – an organisation's important knowledge asset. Although this is widely acknowledged, businesses seldom understand this axiom in terms of the communities through which individuals develop and share the capacity to create and use knowledge. It is the collective learning that takes place within the social systems, i.e. communities of practice (CoP) that are of particular significance to an organisation from a KM perspective. This paper aims to review, critique, and raise some pertinent questions on the role of CoPs; and with the help of case studies shed light on the “goings-on” in construction practices. Design/methodology/approach – After critically reviewing the literature on CoPs and querying some underlying assertions, this research investigates how these issues are addressed in practice. A case study approach is adopted. Three organisations operating in the construction sector are interviewed for the purpose of this paper. Findings – Case study findings highlight the potential challenges and benefits of CoPs to a construction organisation, the role they play in generating and delivering value to the organisation and their contribution towards the collective organisational intelligence. From the findings, it is clear that the question is not whether communities exist within organisations, but how they deliver value to the organisation. From an organisational perspective, the key challenge is to provide an environment that is conducive to developing and nurturing such communities as opposed to merely creating them. Practical implications – Challenges and benefits demonstrated through the case studies should be taken in context. The findings are not intended to be prescriptive in nature, but are intentionally descriptive to provide contextual data that allow readers to draw their own inferences in the context of their organisations. They should be applied taking into account an organisation's unique characteristics and differentiators, the dynamics of the environment in which it operates and the culture it harbours within. Originality/value – Investigating the role of CoPs in the context of case study construction organisations forms the prime focus of this paper.