Design management research usually deals with the processes within the professional design team and yet, in the UK, the volume of the total project information produced by the specialist trade contractors equals or exceeds that produced by the design team. There is a need to understand the scale of this production task and to plan and manage it accordingly. The model of the process on which the plan is to be based, while generic, must be sufficiently robust to cover the majority of instances. An approach using design elements, in sufficient depth to possibly develop tools for a predictive model of the process, is described. The starting point is that each construction element and its components have a generic sequence of design activities. Specific requirements tailor the element's application to the building. Then there are the constraints produced due to the interaction with other elements. Therefore, the selection of a component within the element may impose a set of constraints that will affect the choice of other design elements. Thus, a design decision can be seen as an interrelated element-constraint-element (ECE) sub-net. To illustrate this approach, an example of the process within precast concrete cladding has been used.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Design management research usually deals with the processes within the professional design team and yet, in the UK, the volume of the total project information produced by the specialist trade contractors equals or exceeds that produced by the design team. There is a need to understand the scale of this production task and to plan and manage it accordingly. The model of the process on which the plan is to be based, while generic, must be sufficiently robust to cover the majority of instances. An approach using design elements, in sufficient depth to possibly develop tools for a predictive model of the process, is described. The starting point is that each construction element and its components have a generic sequence of design activities. Specific requirements tailor the element's application to the building. Then there are the constraints produced due to the interaction with other elements. Therefore, the selection of a component within the element may impose a set of constraints that will affect the choice of other design elements. Thus, a design decision can be seen as an interrelated element-constraint-element (ECE) sub-net. To illustrate this approach, an example of the process within precast concrete cladding has been used.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Delayed ettringite formation (DEF) in cementitious materials is widely considered as a harmful chemical reaction that causes extensive damages in hardened concrete. However, preventative measures and possible improvements in general are not extensively studied and require further attention. In this study was presented an investigation into a type of controlled DEF in places of finely dispersed crystallisation nuclei and provide evidence that the process may improve compressive strength of cementitious materials. The Alkali-Silica Reaction (ASR) in hydrated concrete was achieved with the addition of fly ash and was further accelerated with the Duggan’s test. Achieved strengths and monitoring of microstructure development conducted with electronic microscopy revealed that growth of ettringite crystals in the nuclei led to harmless internal compressive stresses, expansion of hydrated concrete and overall strengthening of the concrete matrix.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The successful implementation of just-in-time (JIT) purchasing policy in many industries has prompted many companies that still use the economic order quantity (EOQ) purchasing policy to ponder if they should switch to the JIT purchasing policy. Despite existing studies that directly compare the costs between the EOQ and JIT purchasing systems, this decision is, however, still difficult to be made, especially when price discount has to be considered. JIT purchasing may not always be successful even though plants that adopted JIT operations have experienced or can take advantage of physical space reduction. Hence, the objective of this study is to expand on a classical EOQ with a price discount model to derive the EOQ–JIT cost indifference point. The objective was tested and achieved through a survey and case study conducted in the ready-mixed concrete industry in Singapore.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A model for comparing the inventory costs of purchasing under the economic order quantity (EOQ) system and the just-in-time (JIT) order purchasing system in existing literature concluded that JIT purchasing was virtually always the preferable inventory ordering system especially at high level of annual demand. By expanding the classical EOQ model, this paper shows that it is possible for the EOQ system to be more cost effective than the JIT system once the inventory demand approaches the EOQ-JIT cost indifference point. The case study conducted in the ready-mixed concrete industry in Singapore supported this proposition.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Delayed ettringite formation (DEF) is a chemical reaction with proven damaging effects on hydrated concrete. Ettringite crystals can cause cracks and their widening due to pressure on cracked walls caused by the positive volume difference in the reaction. Concrete may show improvements in strength at early ages but further growth of cracks causes widening and spreading through the concrete structure. In this study, finely dispersed crystallization nuclei achieved by adding air-entraining agent (AEA) and short vibration of specimens is presented as the main prerequisite for reducing DEF-induced deterioration of hydrated concrete. The study presents the method and mechanism for obtaining the required nucleation. Controlling long-term DEF by providing AEA-induced crystallisation nuclei, prevented excessive and rapid initial strength improvements, and resulted in a slight increase of compressive strength of fine grained concrete with only marginally lower density.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Concrete Gown for Immaterial Flows was a sculptural installation and performance commissioned by the Hayward Gallery as part of the Mirrorcity exhibition (14 October 2014 - 4 January 2015). In an age of increasingly abstract power, ideology is disavowed as a twentieth century relic. We are instead told we are governed by pragmatic decisions based on charts and figures. Responding to this notion, Concrete Gown for Immaterial Flows is comprised of a concrete materialisation of abstract financial charts. It forms a stage upon which a series of live music performances take place. Musicians were commissioned to produce new interpretations of Nathan Alterman's "Morning Song", an old Zionist love song to the state, promising to clothe it in concrete and cement. Thus, the immateriality of financial transactions is made physical and given the monumental language it lacks in a patriotic offering for our times.