7 resultados para Post office
em CentAUR: Central Archive University of Reading - UK
Resumo:
Existing buildings contribute greatly to global energy use and greenhouse gas emissions. In the UK, about 18% of carbon emissions are generated by non-domestic buildings; sustainable building refurbishment can play an important role in reducing carbon emissions. This paper looks at the performance of a recently refurbished 5-storey office building in London, in terms of energy consumption as well as occupants’ satisfaction. Pre- and post-occupancy evaluation studies were conducted using online questionnaire surveys and energy consumption evaluation. Results from pre-occupancy and post-occupancy evaluation studies showed that employees, in general, were more satisfied with their work environment at the refurbished building than with that of their previous office. Employees’ self-reported productivity improved after the move to Elms House. These surveys showed a positive relationship between employees’ satisfaction with their work environment and their self-reported productivity, well-being and enjoyment at work. The factor that contributed to increasing employee satisfaction the most was: better use of interior space. Although the refurbishment was a success in terms of reducing energy consumption per m2, the performance gap was almost 3 times greater than that estimated. Unregulated loads, problems with building control, ineffective use of space and occupants’ behaviour are argued to be reasons for this gap.
Resumo:
It is generally accepted that the physical workplace environment affects employees’ satisfaction and, consequently, their perceived productivity and well-being. This study investigated whether employee “satisfaction” variables can predict perceived productivity, well-being and enjoyment at work, and if so, to what extent. The study also explored whether limiting employees’ control over their environment could save energy without compromising employees’ satisfaction and perceived productivity. Preoccupancy and post-occupancy evaluation studies were conducted, in terms of both energy consumption and employee perceptions, to make comparisons between a company’s old and current headquarters buildings, both located in the same area of London. The results showed that employees were more satisfied with their work environment at their new HQ, in general, than with that of their previous office. Also, employees’ self-reported productivity, well-being and enjoyment at work improved after the move. It was revealed that the combination of employees’ level of satisfaction with “interior use of space” and “physical conditions” was the best predictor of their perceived productivity, while satisfaction with “indoor facilities” was not a good predictor. In terms of energy performance, although the new HQ’s energy consumption per m2 was significantly less than that of the previous building, there was still a gap between the refurbishment design target and the actual performance of the building. The findings suggest that this gap could be due to a number of factors, including an ineffective use of interior space, and occupants’ behaviour.
Resumo:
Written evidence, and minutes of evidence, to the House of Commons Select Committee on Environment, Food and Rural Affairs enquiry into The Common Agricultural Policy after 2013
Resumo:
The optimal utilisation of hyper-spectral satellite observations in numerical weather prediction is often inhibited by incorrectly assuming independent interchannel observation errors. However, in order to represent these observation-error covariance structures, an accurate knowledge of the true variances and correlations is needed. This structure is likely to vary with observation type and assimilation system. The work in this article presents the initial results for the estimation of IASI interchannel observation-error correlations when the data are processed in the Met Office one-dimensional (1D-Var) and four-dimensional (4D-Var) variational assimilation systems. The method used to calculate the observation errors is a post-analysis diagnostic which utilises the background and analysis departures from the two systems. The results show significant differences in the source and structure of the observation errors when processed in the two different assimilation systems, but also highlight some common features. When the observations are processed in 1D-Var, the diagnosed error variances are approximately half the size of the error variances used in the current operational system and are very close in size to the instrument noise, suggesting that this is the main source of error. The errors contain no consistent correlations, with the exception of a handful of spectrally close channels. When the observations are processed in 4D-Var, we again find that the observation errors are being overestimated operationally, but the overestimation is significantly larger for many channels. In contrast to 1D-Var, the diagnosed error variances are often larger than the instrument noise in 4D-Var. It is postulated that horizontal errors of representation, not seen in 1D-Var, are a significant contributor to the overall error here. Finally, observation errors diagnosed from 4D-Var are found to contain strong, consistent correlation structures for channels sensitive to water vapour and surface properties.
Resumo:
A Guide to Office Clerical Time Standards is an instructional performance piece based on a corporate manual from 1960. The pamphlet is focused on the time necessary for the accomplishment of minute labour procedures in the office, from the depressing and releasing of typewriter keys to the opening and closing of filing cabinet drawers. In the performance, seven costumed performers represent the different levels of management and employment while performing the actions described in the guide, accompanied by a live musical score. There has been much discussion of the changes to work in the west following the decline of post-Fordist service sector jobs. These increasingly emphasise the specificity of employees’ knowledge and cognitive skill. However, this greater flexibility and creativity at work has been accompanied by an opposite trajectory. The proletarisation of white collar work has given rise to more bureaucracy, target assessment and control for workers in previously looser creative professions, from academia to the arts. The midcentury office is the meeting point of these cultures, where the assembly line efficiency management of the factory meets the quantifying control of the knowledge economy. A Guide to Office Clerical Time Standards explores the survival of one regime into its successor following the lines of combined and uneven development that have turned the emancipatory promise of immaterial labour into the perma-temp hell of the cognitariat. The movement is accompanied by a score of guitar, bass and drums, the componenets of the rock ‘n’ roll music that rose from the car factories of the motor city and the cotton fields of the southern states to represent the same junction of expression and control.
Resumo:
Building designs regularly fail to achieve the anticipated levels of in-use energy consumption. The interaction of occupants with building controls is often cited as a key factor behind this discrepancy. This paper examines whether one factor in inadvertent energy consumption might be the appearance of post-completion errors (when an intended action is not taken because a primary goal has already been accomplished) in occupants’ interactions with building controls. Post-completion errors have been widely studied in human-computer interaction but the concept has not previously been applied to the interaction of occupants with building controls. Two experiments were carried out to examine the effect of incorporating two different types of simple prompt to reduce post-completion error in the use of light switches in office meeting rooms. Results showed that the prompts were effective and that occupants switched off lights when leaving the room more often when presented with a normative prompt than with a standard injunction. Additionally, an over reliance on PIR sensors to turn off lights after meetings was observed, which reduced their intended energy savings. We conclude that achieving low carbon buildings in practice is not solely a technological issue and that application of user-models from human-computer interaction will encourage appropriate occupant interaction with building controls and help reduce inadvertent energy consumption.