45 resultados para PERFORMANCE SYSTEM ASSESSMENT IN PUBLIC ADMINISTRATION

em CentAUR: Central Archive University of Reading - UK


Relevância:

100.00% 100.00%

Publicador:

Resumo:

A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of the study was to determine if there were adverse effects on animal health and performance when a range of ruminant animals species were fed at least 10 times the maximum permitted European Union (EU) selenium (Se) dietary inclusion rate (0.568 mg Se/kg DM) in the form of selenium enriched yeast (SY) derived from a specific strain of Saccharomyces cerevisiae CNCM I-3060. In a series of studies, dairy cows, beef cattle, calves and lambs were offered either a control diet which contained no Se supplement or a treatment diet which contained the same basal feed ingredients plus a SY supplement which increased total dietary Se from 0.15 to 6.25, 0.20 to 6.74, 0.15 to 5.86 and 0.14 to 6.63 mg Se/kg DM, respectively. The inclusion of the SY supplement (P < 0.001) increased whole blood Se concentrations, reaching maximum mean values of 716, 1,505, 1,377, and 724 ng Se/mL for dairy cattle, beef cattle, calves and lambs, respectively. Selenomethionine accounted for 10% of total whole blood Se in control animals whereas the proportion in SY animals ranged between 40 and 75%. Glutathione peroxidase (EC 1.11.1.9) activity was higher (P < 0.05) in SY animals when compared with controls. A range of other biochemical and hematological parameters were assessed, but few differences of biological significance were established between treatments groups. There were no differences between treatment groups within each species with regard to animal physical performance or overall animal health. It was concluded that there were no adverse effects on animal health, performance and voluntary feed intake to the administration of at least ten times the EU maximum, or approximately twenty times the US FDA permitted concentration of dietary Se in the form of SY derived from a specific strain of Saccharomyces cerevisiae CNCM I-3060.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Objectives: To assess the impact of a closed-loop electronic prescribing, automated dispensing, barcode patient identification and electronic medication administration record (EMAR) system on prescribing and administration errors, confirmation of patient identity before administration, and staff time. Design, setting and participants: Before-and-after study in a surgical ward of a teaching hospital, involving patients and staff of that ward. Intervention: Closed-loop electronic prescribing, automated dispensing, barcode patient identification and EMAR system. Main outcome measures: Percentage of new medication orders with a prescribing error, percentage of doses with medication administration errors (MAEs) and percentage given without checking patient identity. Time spent prescribing and providing a ward pharmacy service. Nursing time on medication tasks. Results: Prescribing errors were identified in 3.8% of 2450 medication orders pre-intervention and 2.0% of 2353 orders afterwards (p<0.001; χ2 test). MAEs occurred in 7.0% of 1473 non-intravenous doses pre-intervention and 4.3% of 1139 afterwards (p = 0.005; χ2 test). Patient identity was not checked for 82.6% of 1344 doses pre-intervention and 18.9% of 1291 afterwards (p<0.001; χ2 test). Medical staff required 15 s to prescribe a regular inpatient drug pre-intervention and 39 s afterwards (p = 0.03; t test). Time spent providing a ward pharmacy service increased from 68 min to 98 min each weekday (p = 0.001; t test); 22% of drug charts were unavailable pre-intervention. Time per drug administration round decreased from 50 min to 40 min (p = 0.006; t test); nursing time on medication tasks outside of drug rounds increased from 21.1% to 28.7% (p = 0.006; χ2 test). Conclusions: A closed-loop electronic prescribing, dispensing and barcode patient identification system reduced prescribing errors and MAEs, and increased confirmation of patient identity before administration. Time spent on medication-related tasks increased.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Growing legislative pressures and increasing stakeholder awareness of environmental issues are pushing the property market to consider high-performance, low-impact retail buildings. The office sector is relatively advanced in its apparent appreciation of such buildings; however, the retail sector is slow to recognize these benefits. In exploring the business case for high-performance design adoption in the retail sector, this paper examines the overlaps between office and retail sector benefits and considers the potential benefits peculiar to retailers. Barriers to high-performance design adoption are then addressed through case research, interviews with key representatives from the retail property market and a questionnaire survey of FTSE listed retail company property departments. The paper concludes that information gaps are a significant hindrance to high-performance property development and that they can be reduced, to some extent, by the forthcoming introduction of the BREEAM Retail environmental assessment tool. Copyright © 2003 John Wiley & Sons, Ltd and ERP Environment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article describes the development and validation of a diagnostic test of German and its integration in a programme of formative assessment during a one-year initial teacher-training course. The test focuses on linguistic aspects that cause difficulty for trainee teachers of German as a foreign language and assesses implicit and explicit grammatical knowledge as well as students' confidence in this knowledge. Administration of the test to 57 German speakers in four groups (first-year undergraduates, fourth-year undergraduates, postgraduate trainees, and native speakers) provided evidence of its reliability and validity.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study attempts to fill the existing gap in the simulation of variable flow distribution systems through developing new pressure governing components. These components are able to capture the actual ever-changing system performance curve in variable flow distribution systems together with the prediction of controversial issues such as starving, over-flow and the lack of controllability on the flow rate of different branches in a hydronic system. The performance of the proposed components is verified using a case study under design and off-design circumstances. Full integration of the new components within the TRNSYS simulation package is another advantage of this study, which makes it more applicable for designers in both the design and commissioning of hydronic systems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction procurement is complex and there is a very wide range of options available to procurers. Inappropriate choices about how to procure may limit practical opportunities for innovation. In particular, traditional approaches to construction procurement set up many obstacles for technology suppliers to provide innovative solutions. This is because they are often employed as sub-contractors simply to provide and install equipment to specifications developed before the point at which they become involved in a project. A research team at the University of Reading has developed a procurement framework that comprehensively defines the various options open to procurers in a more fine-grained way than has been known in the past. This enables informed decisions that can establish tailor-made procurement approaches that take into account the needs of specific clients. It enables risk and reward structures to be aligned so that contracts and payment mechanisms are aligned precisely with what a client seeks to achieve. This is not a “one-size-fits-all” approach. Rather, it is an approach that enables informed decisions about how to organize individual procurements that are appropriate to particular circumstances, acknowledging that they differ for each client and for each procurement exercise. Within this context, performance-based contracting (PBC) is explored in terms of the different ways in which technology suppliers within constructed facilities might be encouraged and rewarded for the kinds of innovation sought by the ultimate clients. Examples from various industry sectors are presented, from public sector and from private sector, with a commentary about what they sought to achieve and the extent to which they were successful. The lessons from these examples are presented in terms of feasibility in relation to financial issues, governance, economics, strategic issues, contractual issues and cash flow issues for clients and for contractors. Further background documents and more detailed readings are provided in an appendix for those who wish to find out more.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Structured data represented in the form of graphs arises in several fields of the science and the growing amount of available data makes distributed graph mining techniques particularly relevant. In this paper, we present a distributed approach to the frequent subgraph mining problem to discover interesting patterns in molecular compounds. The problem is characterized by a highly irregular search tree, whereby no reliable workload prediction is available. We describe the three main aspects of the proposed distributed algorithm, namely a dynamic partitioning of the search space, a distribution process based on a peer-to-peer communication framework, and a novel receiver-initiated, load balancing algorithm. The effectiveness of the distributed method has been evaluated on the well-known National Cancer Institute’s HIV-screening dataset, where the approach attains close-to linear speedup in a network of workstations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As a method of procuring the services of the built environment, performance-based contracting (PBC) seeks to link the building supplier to longer term commitments than has traditionally been the case in the construction sector. By rewarding the building producer according to the way that building or structure delivers the users' requirements, rather than according to a list of assembled parts, a number of additional risks are taken by contractors, including fitness for purpose, costs and briefing. The extent to which contractors recognize these risks and their methods of dealing with them vary considerably and are influenced by their attitudes towards risk. As the risks associated with PBC are seen as large, uninsurable, and vulnerable to changing client requirements, the majority of respondents would reject the use of PBC as a method of contracting. Nevertheless, PBC may be used under particular conditions, where rewards are deemed sufficient to compensate for the additional risk to the contractor of undertaking work on the basis of a stream of payments paid over the life of a structure depending on the satisfactory performance of the building or as part of a private finance initiative.

Relevância:

100.00% 100.00%

Publicador: