63 resultados para P21 - Planning, Coordination, and Reform

em CentAUR: Central Archive University of Reading - UK


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The coordination chemistry of iso-butyramide based ligands such as: (C3H7CON)-C-i((C3H7)-C-i)(2), (C3H7CON)-C-i(C4H9)(2) and (C3H7CON)-C-i((C4H9)-C-i)(2) with [UO2(NO3)(2) center dot 6H(2)O], [UO2(OO)(2) center dot 2H(2)O] {where OO = C4H3SCOCHCCCF3 (TTA), C6H5COCHCOCF3 (BTA) and C6H5COCHCOC6H5 (DBM)), [Th(NO3)(4) center dot 6H(2)O] and [La(NO3)(3) center dot 6H(2)O] has been evaluated. Structures for the compounds [UO2(NO3)(2)CC3H7CON{(C4H9)-C-i}(2))(2)] and [UO2(C6H5COCHCOC6H5)(2)((C3H7CON)-C-i{(C3H7)-C-i)(2))] have been determined by single crystal X-ray diffraction methods. Preliminary separation studies from nitric acid medium using the amide (C3H7CON)-C-i((C4H9)-C-i)(2) with U(VI), Th(IV) and La(Ill) ions showed the selective precipitation of uranyl ion from the mixture. Thermal study of the compound [UO2(NO3)(2)((C3H7CON)-C-i((C4H9)-C-i)(2))(2)] in air revealed that the ligands can be destroyed completely on incineration. (C) 2008 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The bi-functional carbamoyl methyl pyrazole ligands, C5H7N2CH2CONBu2 (L-1), (C5H7N2CH2CONBu2)-Bu-i (L-2), C3H3N2CH2CONBu2 (L-3), (C3H3N2CH2CONBu2)-Bu-i (L-4) and C5H7N2CH2CON(C8H17)(2) (L-5) were synthesized and characterized by spectroscopic and elemental analysis methods. The selected coordination chemistry of L-1 to L-4 with [UO2(NO3)(2)center dot 6H(2)O], [La(NO3)(3)center dot 6H(2)O] and [Ce(NO3)(3)center dot 6H(2)O] has been evaluated. Structures for the compounds [UO2(NO3)(2) C5H7N2CH2CONBu2] (6) [UO2(NO3)(2) (C5H7N2CHCONBu2)-Bu-i] (7) and [Ce(NO3)(3){C(3)H(3)N(2)CH(2)CON(i)Bu2}(2)] (11) have been determined by single crystal X-ray diffraction methods. Preliminary extraction studies of the ligand L-5 with U(VI) and Pu(IV) in tracer level showed an appreciable extraction for U(VI) and Pu(TV) up to 10 M HNO3 but not for Am(III). Thermal studies of the compounds 6 and 7 in air revealed that the ligands can be destroyed completely on incineration. (c) 2007 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The synthesis of a range of ditopic polyferrocenyl zinc(II) dithiocarbamate macrocyclic receptors containing ferrocene groups on the macrocycle's periphery and/or as part of the cyclic cavity is reported. The assemblies have been characterised by a range of spectroscopic techniques, electrochemical studies and in two cases by X-ray structure determination. The ability of these host systems to bind and sense electrochemically anionic guest species, isonicotinate and benzoate, and neutral 4-picoline guest was examined by H-1 NMR and cyclic voltammetric titration studies. The strongest association was found between the isonicotinate anion and a dinuclear zinc(II) receptor whose macrocyclic cavity is of complementary size to complex this bidentate guest species in a cooperative manner. Cyclic voltammetric studies demonstrated that all receptors can electrochemically sense the binding of isonicotinate and benzoate via significant cathodic perturbations of the respective ferrocene redox couple.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A major infrastructure project is used to investigate the role of digital objects in the coordination of engineering design work. From a practice-based perspective, research emphasizes objects as important in enabling cooperative knowledge work and knowledge sharing. The term ‘boundary object’ has become used in the analysis of mutual and reciprocal knowledge sharing around physical and digital objects. The aim is to extend this work by analysing the introduction of an extranet into the public–private partnership project used to construct a new motorway. Multiple categories of digital objects are mobilized in coordination across heterogeneous, cross-organizational groups. The main findings are that digital objects provide mechanisms for accountability and control, as well as for mutual and reciprocal knowledge sharing; and that different types of objects are nested, forming a digital infrastructure for project delivery. Reconceptualizing boundary objects as a digital infrastructure for delivery has practical implications for management practices on large projects and for the use of digital tools, such as building information models, in construction. It provides a starting point for future research into the changing nature of digitally enabled coordination in project-based work.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The time taken to consider development proposals within the English planning system continues to provoke great policy concern despite a decade of inquiry and policy change. The results of an extensive site-based survey and hedonic modelling exercise across 45 local authorities are reported here. The analysis reveals a slow, uncertain system. It identifies planning delay as a serious problem for housing supply and its ability to respond to increases in demand. Only a relatively limited set of factors seem relevant in explaining differences in times and the results suggest that 80% of councils’ performances are statistically indistinguishable from each other. These findings question the policy emphasis put on rankings of local authorities, though some influence from local politics is apparent. Development control is consistently a lengthy and uncertain process due to its complexity. Therefore, success in lowering planning delay is only likely through radical simplification.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is growing international interest in the impact of regulatory controls on the supply of housing The UK has a particularly restrictive planning regime and a detailed and uncertain process of development control linked to it. This paper presents the findings of empirical research on the time taken to gain planning permission for selected recent major housing projects from a sample of local authorities in southern England. The scale of delay found was far greater than is indicated by average official data measuring the extent to which local authorities meet planning delay targets. Hedonic analysis indicated that there is considerable variation in time it takes local authorities to process planning applications, with the worst being four times slower than the best. Smaller builders and housing association developments are processed more quickly than those of large developers and small sites appear to be particularly time intensive. These results suggest that delays in development control may be a significant contributory factor to the low responsiveness of UK housing supply to upturns in market activity.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper examines some broad issues concerning the role that conservation policy plays in statutory planning in Britain. It argues that planning contains a number of different, often conflicting, objectives. Conservation, in contributing to one of these objectives, exacerbates this conflict. The paper further argues that since different objectives are accorded different priorities depending upon the prevailing political ideology, conservation policy is not only operating within the context of possibly opposing planning objectives, but also within a particular political environment which will separately determine the degree of importance attached to it. The British example is used to explore these themes, particularly in examining the ideological basis for the redefinition of preservation and protection away from their welfarist traditions towards issues of private rights and market supremacy. The paper concludes that rather than contributing to social welfare, planning and conservation policy is now contributing to the increasing division between rich and poor in society.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is growing international interest in the impact of regulatory controls on the supply of housing. Most research focuses on the supply impacts of prescribed limits on land use but housing supply may also be affected by the process of planning monitoring and approval but this is hard to measure in detail. The UK has a particularly restrictive planning regime and a detailed and uncertain process of development control linked to it, but does offer the opportunity of detailed site-based investigation of planning delay. This paper presents the findings of empirical research on the time taken to gain planning permission for selected recent major housing projects in southern England. The scale of delay found was far greater than is indicated by average official data measuring the extent to which local authorities meet planning delay targets. Hedonic modelling indicated that there is considerable variation in the time it takes local authorities to process planning applications. Housing association developments are processed more quickly than those of large developers and small sites appear to be particularly time-intensive. These results suggest that delays in development control may be a significant contributory factor to the low responsiveness of UK housing supply to upturns in market activity.