12 resultados para Operations Management

em CentAUR: Central Archive University of Reading - UK


Relevância:

60.00% 60.00%

Publicador:

Relevância:

40.00% 40.00%

Publicador:

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper aims to introduce a knowledge-based managemental prototype entitled Eþ for environmental-conscious construction relied on an integration of current environmental management tools in construction area. The overall objective of developing the Eþ prototype is to facilitate selectively reusing the retrievable knowledge in construction engineering and management areas assembled from previous projects for the best practice in environmental-conscious construction. The methodologies adopted in previous and ongoing research related to the development of the Eþ belong to the operations research area and the information technology area, including literature review, questionnaire survey and interview, statistical analysis, system analysis and development, experimental research and simulation, and so on. The content presented in this paper includes an advanced Eþ prototype, a comprehensive review of environmental management tools integrated to the Eþ prototype, and an experimental case study of the implementation of the Eþ prototype. It is expected that the adoption and implementation of the Eþ prototype can effectively facilitate contractors to improve their environmental performance in the lifecycle of projectbased construction and to reduce adverse environmental impacts due to the deployment of various engineering and management processes at each construction stage.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The iRODS system, created by the San Diego Supercomputing Centre, is a rule oriented data management system that allows the user to create sets of rules to define how the data is to be managed. Each rule corresponds to a particular action or operation (such as checksumming a file) and the system is flexible enough to allow the user to create new rules for new types of operations. The iRODS system can interface to any storage system (provided an iRODS driver is built for that system) and relies on its’ metadata catalogue to provide a virtual file-system that can handle files of any size and type. However, some storage systems (such as tape systems) do not handle small files efficiently and prefer small files to be packaged up (or “bundled”) into larger units. We have developed a system that can bundle small data files of any type into larger units - mounted collections. The system can create collection families and contains its’ own extensible metadata, including metadata on which family the collection belongs to. The mounted collection system can work standalone and is being incorporated into the iRODS system to enhance the systems flexibility to handle small files. In this paper we describe the motivation for creating a mounted collection system, its’ architecture and how it has been incorporated into the iRODS system. We describe different technologies used to create the mounted collection system and provide some performance numbers.

Relevância:

30.00% 30.00%

Publicador:

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Data from civil engineering projects can inform the operation of built infrastructure. This paper captures lessons for such data handover, from projects into operations, through interviews with leading clients and their supply chain. Clients are found to value receiving accurate and complete data. They recognise opportunities to use high quality information in decision-making about capital and operational expenditure; as well as in ensuring compliance with regulatory requirements. Providing this value to clients is a motivation for information management in projects. However, data handover is difficult as key people leave before project completion; and different data formats and structures are used in project delivery and operations. Lessons learnt from leading practice include defining data requirements at the outset, getting operations teams involved early, shaping the evolution of interoperable systems and standards, developing handover processes to check data rather than documentation, and fostering skills to use and update project data in operations

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this study is to examine the use of accrual-based vs real earnings management (EM) by Greek firms, before and after the mandatory adoption of International Financial Reporting Standards (IFRS). The research is motivated by the fact that past studies have indicated the existence of significant levels of EM for Greece in particular before IFRS. Design/methodology/approach – Accrual-based earnings management (AEM) is examined by assessing performance-adjusted discretionary accruals, while real earnings management (REM) is defined in terms of abnormal levels of production costs, discretionary expenses, and cash flows from operations, for a three-year period before and after the adoption of IFRS in 2005. Findings – The authors find evidence on a statistically significant shift from AEM to REM after the adoption of IFRS, indicating the replacement of one form of EM with the other. Research limitations/implications – The validity of the results depends on the ability of the empirical models used to efficiently capture the existence of AEM and REM. Practical implications – IFRS adoption aims to improve accounting quality, especially in countries with high need for such an improvement; however, the tendency to substitute one form of EM with another highlights unintended consequences of IFRS adoption, which do not improve the informational content of financial statements if EM continues under different forms. Originality/value – Under the expectation that IFRS adoption should lead to improvements in accounting quality, this study examines whether IFRS actually led to a reduction of EM practices for a country with exceptionally high levels of EM before IFRS, by accounting for all possible forms of EM.