8 resultados para Off-site industrialisation
em CentAUR: Central Archive University of Reading - UK
Resumo:
Planning is a vital element of project management but it is still not recognized as a process variable. Its objective should be to outperform the initially defined processes, and foresee and overcome possible undesirable events. Detailed task-level master planning is unrealistic since one cannot accurately predict all the requirements and obstacles before work has even started. The process planning methodology (PPM) has thus been developed in order to overcome common problems of the overwhelming project complexity. The essential elements of the PPM are the process planning group (PPG), including a control team that dynamically links the production/site and management, and the planning algorithm embodied within two continuous-improvement loops. The methodology was tested on a factory project in Slovenia and in four successive projects of a similar nature. In addition to a number of improvement ideas and enhanced communication, the applied PPM resulted in 32% higher total productivity, 6% total savings and created a synergistic project environment.
Resumo:
The archaeological site of Kharaneh IV in Jordan's Azraq Basin, and its relatively near neighbour Jilat 6 show evidence of sustained occupation of substantial size through the Early to Middle Epipalaeolithic (c. 24,000 - 15,000 cal BP). Here we review the geomorphological evidence for the environmental setting in which Kharaneh IV was established. The on-site stratigraphy is clearly differentiated from surrounding sediments, marked visually as well as by higher magnetic susceptibility values. Dating and analysis of off-site sediments show that a significant wetland existed at the site prior to and during early site occupation (~ 23,000 - 19,000 BP). This may explain why such a substantial site existed at this location. This wetland dating to the Last Glacial Maximum also provides important information on the palaeoenvironments and potential palaeoclimatic scenarios for today's eastern Jordanian desert, from where such evidence is scarce.
Resumo:
Smooth flow of production in construction is hampered by disparity between individual trade teams' goals and the goals of stable production flow for the project as a whole. This is exacerbated by the difficulty of visualizing the flow of work in a construction project. While the addresses some of the issues in Building information modeling provides a powerful platform for visualizing work flow in control systems that also enable pull flow and deeper collaboration between teams on and off site. The requirements for implementation of a BIM-enabled pull flow construction management software system based on the Last Planner System™, called ‘KanBIM’, have been specified, and a set of functional mock-ups of the proposed system has been implemented and evaluated in a series of three focus group workshops. The requirements cover the areas of maintenance of work flow stability, enabling negotiation and commitment between teams, lean production planning with sophisticated pull flow control, and effective communication and visualization of flow. The evaluation results show that the system holds the potential to improve work flow and reduce waste by providing both process and product visualization at the work face.
Resumo:
In this paper we undertake a preliminary assessment of the regional planning and development implications of BAA Stansted Airport’s planning permission to grow to 25 million passengers per annum (mppa) by 2010. Our concern is not simply to consider the overall growth of the airport on the airport site itself but the nature and type of growth both on- and off-site. In this document we focus on the submitted planning permission documents and test them. The methodology we employed was to draw on published and unpublished numerical estimates of the airport’s growth – particularly including estimates produced by the airport owner, BAA, and their economic and planning consultants DTZ Pieda - and critically, and systematically analyse their figures. We adopted this approach because unless the figures which were employed in the initial calculations were correct then all of the subsequent projections which flow from them - and the polices which could then be based on them – could be flawed. The analysis is divided into two parts – firstly, are the growth forecasts correct?; and secondly, what do these forecasts actually mean in developmental terms? In effect, what we have done is to produce a critique of the existing body of evidence by questioning underpinning assumptions and then draw some preliminary conclusions for the region based on this analysis. A major focus of this report has been analyse the figures involved in the planning application to expand Stansted to 25mppa. Ironically, one of our key findings, that the local impact of Stansted’s proposed expansion in employment terms might well be less than was originally thought, might make it easier to gain the acceptance of the relevant local authorities involved to allow the development to take place. Our main overall findings are that the BAA projections over-estimate the local employment impact of the airport’s proposed growth and under-estimate its potential regional ‘transportation’ employment effect. These two findings are, of course, related to each other in important ways, and we also feel that they have potentially significant medium and long-term economic, competitiveness and planning policy implications for the East of England region
Resumo:
The building industry is often berated for its short comings in meeting up with the demand for the provision of new housing. Addressing the need for new housing stock is a challenge that has led to debates among professional bodies, the construction sector, housing industry and government. The introduction of new manufacturing technologies is often offered as a solution, but the challenges of increasing the amount of off-site construction in residential building are well known and well-rehearsed. The modern flying factory (MFF) is a concept that involves the manufacture of specific components or modules in temporary off- or near- site locations using relatively simple and quick to set up and dismantle technologies and processes. The aim is to produce short batches and hence achieve some of the benefits of off-site manufacture on a much smaller scale than in dedicated factory environments. A case study of a modern flying factory being set up to produce pre-assembled utility cupboards for a large residential development in London is presented, involving participant observation and informal interviews with key actors on the design and operationalising of the process. The case reveals that although there are costs, efficiency and health and safety benefits to using MFF approaches, there are also challenges to overcome over the time required to set up and establish the process for relatively short runs, and in evaluating whether the MFF or traditional site based production is most effective for particular aspects of projects.
Resumo:
COCO-2 is a model for assessing the potential economic costs likely to arise off-site following an accident at a nuclear reactor. COCO-2 builds on work presented in the model COCO-1 developed in 1991 by considering economic effects in more detail, and by including more sources of loss. Of particular note are: the consideration of the directly affected local economy, indirect losses that stem from the directly affected businesses, losses due to changes in tourism consumption, integration with the large body of work on recovery after an accident and a more systematic approach to health costs. The work, where possible, is based on official data sources for reasons of traceability, maintenance and ease of future development. This report describes the methodology and discusses the results of an example calculation. Guidance on how the base economic data can be updated in the future is also provided.
Resumo:
An extensive off-line evaluation of the Noah/Single Layer Urban Canopy Model (Noah/SLUCM) urban land-surface model is presented using data from 15 sites to assess (1) the ability of the scheme to reproduce the surface energy balance observed in a range of urban environments, including seasonal changes, and (2) the impact of increasing complexity of input parameter information. Model performance is found to be most dependent on representation of vegetated surface area cover; refinement of other parameter values leads to smaller improvements. Model biases in net all-wave radiation and trade-offs between turbulent heat fluxes are highlighted using an optimization algorithm. Here we use the Urban Zones to characterize Energy partitioning (UZE) as the basis to assign default SLUCM parameter values. A methodology (FRAISE) to assign sites (or areas) to one of these categories based on surface characteristics is evaluated. Using three urban sites from the Basel Urban Boundary Layer Experiment (BUBBLE) dataset, an independent evaluation of the model performance with the parameter values representative of each class is performed. The scheme copes well with both seasonal changes in the surface characteristics and intra-urban heterogeneities in energy flux partitioning, with RMSE performance comparable to similar state-of-the-art models for all fluxes, sites and seasons. The potential of the methodology for high-resolution atmospheric modelling application using the Weather Research and Forecasting (WRF) model is highlighted. This analysis supports the recommendations that (1) three classes are appropriate to characterize the urban environment, and (2) that the parameter values identified should be adopted as default values in WRF.
Resumo:
We present evidence for the acceleration of magnetospheric ions by reflection off two Alfvén waves, launched by the reconnection site into the inflow regions on both sides of the reconnecting magnetopause. The “exterior” wave stands in the inflow from the magnetosheath and is the magnetopause, in the sense that the majority of the field rotation occurs there. The other, “interior” wave stands in the inflow region on the magnetospheric side of the boundary. The population reflected by the interior wave is the more highly energized of the two and appears at low altitudes on open field lines, immediately equatorward of the cusp precipitation. In addition, we identify the population of magnetosheath ions transmitted across the exterior Alfvén wave, as well as a population of magnetospheric ions which are accelerated, after transmission through the interior wave, by reflection off the exterior wave. The ion populations near the X line are modeled and, with allowance for time-of-flight effects, are also derived from observations in the dayside auroral ionosphere. Agreement between observed and theoretical spectra is very good and the theory also explains the observed total fluxes and average energies of the precipitations poleward of the open/closed field line boundary. The results offer a physical interpretation of all the various classifications of precipitation into the dayside ionosphere (central plasma sheet, dayside boundary plasma sheet, void, low-latitude boundary layer, cusp, and mantle) and allow the conditions in both the magnetosphere and the magnetosheath adjacent to the X line to be studied.