23 resultados para Mound-builders

em CentAUR: Central Archive University of Reading - UK


Relevância:

20.00% 20.00%

Publicador:

Resumo:

We present a multiproxy study of land use by a pre-Columbian earth mounds culture in the Bolivian Amazon. The Monumental Mounds Region (MMR) is an archaeological sub-region characterized by hundreds of pre-Columbian habitation mounds associated with a complex network of canals and causeways, and situated in the forest–savanna mosaic of the Llanos de Moxos. Pollen, phytolith, and charcoal analyses were performed on a sediment core from a large lake (14 km2), Laguna San José (14°56.97′S, 64°29.70′W).We found evidence of high levels of anthropogenic burning from AD 400 to AD 1280, corroborating dated occupation layers in two nearby excavated habitation mounds. The charcoal decline pre-dates the arrival of Europeans by at least 100 yr, and challenges the notion that the mounds culture declined because of European colonization. We show that the surrounding savanna soils were sufficiently fertile to support crops, and the presence of maize throughout the record shows that the area was continuously cultivated despite land-use change at the end of the earthmounds culture. We suggest that burning was largely confined to the savannas, rather than forests, and that pre-Columbian deforestation was localized to the vicinity of individual habitation mounds, whereas the inter-mound areas remained largely forested.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent radiocarbon dates obtained from two soil cores taken through the Marlborough Castle mound, Wiltshire, show the main body of it to be a contemporaneous monument to Silbury Hill, dating to the second half of the 3rd millennium cal bc. In light of these dates, this paper considers the sequence identified within the cores, which includes two possible flood events early in the construction of the mound. It also describes four cores taken through the surrounding ditch, as well as small-scale work to the north-east of the mound. The topographic location of the mound in a low-lying area and close to rivers and springs is discussed, and the potential for Late Neolithic sites nearby is set out, with the land to the south of the mound identified as an area for future research. The paper ends with the prospect that other apparent mottes in Wiltshire and beyond may well also have prehistoric origins

Relevância:

10.00% 10.00%

Publicador:

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The existing body of research knowledge on brand management has been predominantly derived from business-to-consumer markets, particularly fast moving consumer goods and has only recently started to expand in other contexts. Branding in business-to-business markets has received comparatively little attention in the academic literature due to a belief that industrial buyers are unaffected by the emotional values corresponding to brands. This paper provides a critical discussion of the fragmented literature on business-to-business branding which is organized in five themes: B2B branding benefits; the role of B2B brands in the decision making process; B2B brand architecture; B2B brands as communication enablers and relationship builders; and industrial brand equity. Drawing on the gaps and contradictions in the literature the paper concludes by proposing an agenda for future research.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In October 2008 UK government announced very ambitious commitment to reduce greenhouse gas emissions of at least 34% by 2020 and by 80% by 2050 against a 1990 baseline. Consequently the government declares that new homes should be built to high environmental standards which means that from 2016 new homes will have to be built to a Zero Carbon standard. The paper sets out to present UK zero carbon residential development achieving the highest, Level 6 of Code for Sustainable Homes standard. Comprehensive information is provided about various environmental aspects of the housing development. Special attention is given to energy efficiency features of the houses and low carbon district heating solution which include biomass boiler, heat pumps, solar collectors and photovoltaic panels. The paper presents also challenges which designers and builders had to face delivering houses of the future.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

There is growing international interest in the impact of regulatory controls on the supply of housing The UK has a particularly restrictive planning regime and a detailed and uncertain process of development control linked to it. This paper presents the findings of empirical research on the time taken to gain planning permission for selected recent major housing projects from a sample of local authorities in southern England. The scale of delay found was far greater than is indicated by average official data measuring the extent to which local authorities meet planning delay targets. Hedonic analysis indicated that there is considerable variation in time it takes local authorities to process planning applications, with the worst being four times slower than the best. Smaller builders and housing association developments are processed more quickly than those of large developers and small sites appear to be particularly time intensive. These results suggest that delays in development control may be a significant contributory factor to the low responsiveness of UK housing supply to upturns in market activity.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

What impact do international state-building missions have on the domestic politics of states they seek to build, and how can we measure this impact with confidence? This article seeks to address these questions and challenge some existing approaches that often appear to assume that state-builders leave lasting legacies rather than demonstrating such influence with the use of carefully chosen empirical evidence. Too often, domestic conditions that follow in the wake of international state-building are assumed to follow as a result of international intervention, usually due to insufficient attention to the causal processes that link international actions to domestic outcomes. The article calls for greater appreciation of the methodological challenges to establishing causal inferences regarding the legacies of state-building and identifies three qualitative methodological strategies—process tracing, counterfactual analysis, and the use of control cases—that can be used to improve confidence in causal claims about state-building legacies. The article concludes with a case study of international state-building in East Timor, highlighting several flaws of existing evaluations of the United Nations' role in East Timor and identifying the critical role that domestic actors play even in the context of authoritative international intervention

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Code for Sustainable Homes (the Code) will require new homes in the United Kingdom to be ‘zero carbon’ from 2016. Drawing upon an evolutionary innovation perspective, this paper contributes to a gap in the literature by investigating which low and zero carbon technologies are actually being used by house builders, rather than the prevailing emphasis on the potentiality of these technologies. Using the results from a questionnaire three empirical contributions are made. First, house builders are selecting a narrow range of technologies. Second, these choices are made to minimise the disruption to their standard design and production templates (SDPTs). Finally, the coalescence around a small group of technologies is expected to intensify with solar-based technologies predicted to become more important. This paper challenges the dominant technical rationality in the literature that technical efficiency and cost benefits are the primary drivers for technology selection. These drivers play an important role but one which is mediated by the logic of maintaining the SDPTs of the house builders. This emphasises the need for construction diffusion of innovation theory to be problematized and developed within the context of business and market regimes constrained and reproduced by resilient technological trajectories.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Drawing upon a national database of unimplemented planning permissions and 18 in-depth case studies, this paper provides both a quantitative and qualitative analysis of the phenomenon of stalled sites in England. The practical and conceptual difficulties of classifying sites as stalled are critically reviewed. From the literature, it is suggested that planning permission may not be implemented due to lack of financial viability, strategic behaviour by landowners and house-builders and other problems associated with the development process. Consistent with poor viability, the analysis of the national database indicates that a substantial proportion of the stalled sites is high density apartment development and/or is located in low house value areas. The case studies suggest that a combination of interlinked issues may need to be resolved before a planning permission can be implemented. These include; the sale of the land to house-builders, re-negotiation of the planning permission and, most importantly, improvement in housing market conditions.