134 resultados para Machine costs
em CentAUR: Central Archive University of Reading - UK
Resumo:
This paper reports the current state of work to simplify our previous model-based methods for visual tracking of vehicles for use in a real-time system intended to provide continuous monitoring and classification of traffic from a fixed camera on a busy multi-lane motorway. The main constraints of the system design were: (i) all low level processing to be carried out by low-cost auxiliary hardware, (ii) all 3-D reasoning to be carried out automatically off-line, at set-up time. The system developed uses three main stages: (i) pose and model hypothesis using 1-D templates, (ii) hypothesis tracking, and (iii) hypothesis verification, using 2-D templates. Stages (i) & (iii) have radically different computing performance and computational costs, and need to be carefully balanced for efficiency. Together, they provide an effective way to locate, track and classify vehicles.
Resumo:
The basic premise of transaction-cost theory is that the decision to outsource, rather than to undertake work in-house, is determined by the relative costs incurred in each of these forms of economic organization. In construction the "make or buy" decision invariably leads to a contract. Reducing the costs of entering into a contractual relationship (transaction costs) raises the value of production and is therefore desirable. Commonly applied methods of contractor selection may not minimise the costs of contracting. Research evidence suggests that although competitive tendering typically results in the lowest bidder winning the contract this may not represent the lowest project cost after completion. Multi-parameter and quantitative models for contractor selection have been developed to identify the best (or least risky) among bidders. A major area in which research is still needed is in investigating the impact of different methods of contractor selection on the costs of entering into a contract and the decision to outsource.
Resumo:
The costs of procurement are transaction costs which are separate from the direct costs of a project. In this paper discussion is concentrated on costs of tendering. Types of cost, including money costs and opportunity costs, short-term and long-term costs, private and social costs are defined and examined in relation to various types of product and methods of procurement. The costs of the contractor and of the client are considered and tentative conclusions drawn as to who bears these costs in the short-run and in the long run. They may fall on the parties to the process for the particular project, on other contractors and clients or on society as a whole.
Resumo:
The cost of tendering in the construction industry is widely suspected to be excessive, but there is little robust empirical evidence to demonstrate this. It also seems that innovative working practices may reduce the costs of undertaking construction projects and the consequent improvement in relationships should increase overall value for money. The aim of this proposed research project is to develop mechanisms for measuring the true costs of tendering based upon extensive in-house data collection undertaken in a range of different construction firms. The output from this research will enable all participants in the construction process to make better decisions about how to select members of the team and identify the price and scope of their obligations.
Resumo:
In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply chain from clients to consultants, contractors, sub-contractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, based on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with tendering are highly variable, 1-15%, depending upon what precisely is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.
Resumo:
The frequency responses of two 50 Hz and one 400 Hz induction machines have been measured experimentally over a frequency range of 1 kHz to 400 kHz. This study has shown that the stator impedances of the machines behave in a similar manner to a parallel resonant circuit, and hence have a resonant point at which the Input impedance of the machine is at a maximum. This maximum impedance point was found experimentally to be as low as 33 kHz, which is well within the switching frequency ranges of modern inverter drives. This paper investigates the possibility of exploiting the maximum impedance point of the machine, by taking it into consideration when designing an inverter, in order to minimize ripple currents due to the switching frequency. Minimization of the ripple currents would reduce torque pulsation and losses, increasing overall performance. A modified machine model was developed to take into account the resonant point, and this model was then simulated with an inverter to demonstrate the possible advantages of matching the inverter switching frequency to the resonant point. Finally, in order to experimentally verify the simulated results, a real inverter with a variable switching frequency was used to drive an induction machine. Experimental results are presented.
Resumo:
The 'direct costs' attributable to 30 different endemic diseases of farm animals in Great Britain are estimated using a standardised method to construct a simple model for each disease that includes consideration of disease prevention and treatment costs. The models so far developed provide a basis for further analyses including cost-benefit analyses for the economic assessment of disease control options. The approach used reflects the inherent livestock disease information constraints, which limit the application of other economic analytical methods. It is a practical and transparent approach that is relatively easily communicated to veterinary scientists and policy makers. The next step is to develop the approach by incorporating wider economic considerations into the analyses in a way that will demonstrate to policy makers and others the importance of an economic perspective to livestock disease issues.
Resumo:
This Note outlines the further development of a system of models for the estimation of the costs of livestock diseases first presented by Bennett (2003). The models have been developed to provide updated and improved estimates of the costs associated with 34 endemic diseases of livestock in Great Britain, using border prices and including assessments of the impact of diseases on human health and animal welfare. Results show that, of the diseases studied, mastitis has the highest costs for cattle diseases, enzootic abortion for sheep diseases, swine influenza for pig diseases and salmonellosis for poultry diseases.
Resumo:
Sixty cattle farmers in England were questioned about the costs associated with premovement testing for bovine tuberculosis (TB). On average, the farmers had premovement tested 2-45 times in the previous 12 months, but the majority had tested only once. An average of 28.6 animals were tested on each occasion, but there were wide variations. The average farm labour costs were (sic)4.00 per animal tested, veterinary costs were (sic)4.33 and other costs were (sic)0.51, giving a total cost of (sic)8.84, but there were wide variations between farms, and many incurred costs of more than (sic)20 per animal. A majority of the farmers also cited disruption to the farm business or missed market opportunities as costs, but few could estimate their financial cost. Most of the farmers thought that premovement testing was a cost burden on their business, and over half thought It was not an effective policy to control bovine TB.
Resumo:
An on-farm survey of 151 cattle farmers who had experienced a bovine tuberculosis (Mycobacterium bovis) breakdown on their farms was undertaken in 2003 to assess the costs associated with the breakdown. In 90 per cent of cases the cost was estimated to be less than 18,513 pound for dairy herds and less than El 1,462 for beef herds, but with a range from 229 pound to 103,817 pound. The main cost was the slaughter of reactor cattle. For the majority of the farmers, the compensation payments seemed to meet most of the costs of their breakdowns, although a majority was still left with net losses.
Resumo:
Digital dermatitis is a significant problem in UK dairy herds and the cost to farmers has not yet been fully quantified. Under the current farm health planning initiative there is a need to demonstrate to farmers the costs and benefits of disease control. This paper presents the first attempt to quantify the costs and benefits of digital dermatitis control on UK dairy farms through the use of an interactive model.
Resumo:
Rationalizing non-participation as a resource deficiency in the household, this paper identifies strategies for milk-market development in the Ethiopian highlands. The additional amounts of covariates required for Positive marketable surplus -'distances-to market'-are computed from a model in which production and sales are correlated; sales are left-censored at some Unobserved thresholds production efficiencies are heterogeneous: and the data are in the form of a panel. Incorporating these features into the modeling exercise ant because they are fundamental to the data-generating environment. There are four reasons. First, because production and sales decisions are enacted within the same household, both decisions are affected by the same exogenous shocks, and production and sales are therefore likely to be correlated. Second. because selling, involves time and time is arguably the most important resource available to a subsistence household, the minimum Sales amount is not zero but, rather, some unobserved threshold that lies beyond zero. Third. the Potential existence of heterogeneous abilities in management, ones that lie latent from the econometrician's perspective, suggest that production efficiencies should be permitted to vary across households. Fourth, we observe a single set of households during multiple visits in a single production year. The results convey clearly that institutional and production) innovations alone are insufficient to encourage participation. Market-precipitating innovation requires complementary inputs, especially improvements in human capital and reductions in risk. Copyright (c) 20 08 John Wiley & Sons, Ltd.