90 resultados para International construction
em CentAUR: Central Archive University of Reading - UK
Resumo:
The international construction market is very complex, and requires strong structure and strategy for companies wanting to operate overseas. This article investigates characteristics of international construction. The international operation of Brazilian contractors is explored via results from a qualitative study which was carried out using case studies. The case studies comprised ten big Brazilian contractors, six of which operate abroad. The study identified the patterns of international operation, the competitive advantages of these contractors, as well as the difficulties faced by them in the international construction market. Four of the contractors studied operate only in the domestic market. The study of these cases revealed both obstacles and motivations for future international operations. The study revealed that despite the existing competitive advantages, Brazilian contractors' presence in the international market is limited. The main reason for that is probably their main competitive disadvantage: the lack of financial support from the government.
Resumo:
Construction professional services (CPSs), such as architecture, engineering, and consultancy, are not only high value-added profit centers in their own right but also have a knock-on effect on other businesses, such as construction and the export of materials and machinery. Arguably, competition in the international construction market has shifted to these knowledge-intensive CPS areas. Yet CPSs represent a research frontier that has received scant attention. This research aims to enrich the body of knowledge on CPSs by examining strengths, weaknesses, opportunities, and threats (SWOT) of Chinese CPSs (CCPSs) in the international context. It does so by triangulating theories with quantitative and qualitative data gleaned from yearbooks, annual reports, interviews, seminars, and interactions with managers in major CCPS companies. It is found that CCPSs present both strengths and weaknesses in talents, administration systems, and development strategies in dealing with the external opportunities and threats brought about by globalization and market evolution. Low price, which has helped the Chinese construction business to succeed in the international market, is also a major CCPS strength. An opportunity for CCPSs is the relatively strong delivery capability possessed by Chinese contractors; by partnering with them CCPSs can better establish themselves in the international arena. This is probably the first ever comprehensive study on the performance of CCPSs in the international marketplace. The research is conducted at an opportune time, particularly when the world is witnessing the burgeoning force of Chinese businesses in many areas including manufacturing, construction, and, potentially, professional services. It adds new insights to the knowledge body of CPSs and provides valuable references to other countries faced with the challenge of developing CPS business efficiently in the international market.
Resumo:
In contrast to their bustling construction counterparts, Chinese construction professional services (CPS) such as architecture, engineering, and consultancy, seem still to be stagnant in the international market. CPS are not only high value-added profit centers in their own right, but also have a knock-on effect on subsequent businesses such as construction, and the export of materials and machinery. Arguably, competition in the international construction market has shifted to knowledge-intensive CPS. Yet,CPS represent a research area that has been paid scant attention. This research aims to add to the body of knowledge of CPS by examining strengths, weaknesses, opportunities, and threats (SWOT) of Chinese CPS (CCPS) in the international context. It does so by triangulating theories with quantitative and qualitative data gleaned from yearbooks, annual reports, interviews, seminars, and interactions with managers in major CCPS companies. It is found that CCPS present both strengths and weaknesses in talents, administration systems, and development strategies in dealing with the external opportunities and threats brought about by globalization and market evolvement. Low price, which has helped the Chinese construction business to succeed in the international market, is also a CCPS major strength. An opportunity for CCPS is the relatively strong delivery capability possessed by Chinese contractors. By partnering with them CCPS can better edge into the international arena. This is probably the first ever comprehensive study in investigating the performance of CCPS in the international market. The research is also timely, particularly when the world is witnessing the burgeoning force of Chinese businesses in many areas including manufacturing, construction, and potentially, professional services.
Resumo:
he construction market around the world has witnessed the growing eminence of construction professional services (CPSs), such as urban planning, architecture, engineering, and consultancy, while the traditional contracting sector remains strong. Nowadays, it is not uncommon to see a design firm taking over the work of a traditional main contractor, or vice versa, of overseeing the delivery of a project. Although the two sectors of contracting and CPS share the same purpose of materializing the built environment, they are as different as they are interrelated. Much has been mentioned about the nexus between the two but little has been done to articulate it using empirical evidence. This study examined the nexus between contracting and CPS businesses by offering and testing lead-lag effects between the two sectors in the international market. A longitudinal panel data composed of 23 top international contractors and CPS firms was adopted. Surprisingly, results of the panel data analyses show that CPS business does not have a significant positive causal effect on contracting as a downstream business, and vice versa. CPS and contracting subsidiaries, although within the same company, do not necessarily form a consortium to undertake the same project; rather, they often collaborate with other CPS or contracting counterparts to undertake projects. This paper provides valuable insights into the sophisticated nexus between contracting and CPS in the international construction market. It will support business executives’ rational decision making for selecting proper contracting or CPS allies, or a proper mergers and acquisitions strategy in the international market. The paper also provides a fresh perspective through which researchers can better investigate the diversification strategies adopted by international contracting and CPS firms.
Resumo:
Contracts are put to a wide variety of uses. Those who draft construction contracts in the UK rarely consider all of the potential uses and therefore may produce documents that are less than ideal. The various uses are considered in their theoretical background before turning to the practical difficulties often encountered in trying to fulfil such diverse aims. The question of standardisation is examined within this context. Existing standard forms of contract in the UK are found to do little to overcome these difficulties, and this encourages either a significant level of amendment to the standards or experienced clients to draft their own forms. The solution is an approach to contract drafting which is designed to offer a compromise; better standard forms, based on the lessons learned from the drafting of non-standard forms and a pooling of experience, including that of lawyers, in the drafting process. Although this paper is based upon the experience of the UK, these conclusions are relevant for contract-drafting practice in general.
Resumo:
Throughout the developed world, professional services play an increasingly important part in an economy, with many countries showing a substantial positive trade balance for services. Yet, there has been relatively little research on construction services (CS) and, in particular, how well professional service companies (PSFs) perform in the international arena. The method for collecting services export information differs to the way in which goods and products exports data are gathered because of the intangible nature of services. Organisational growth of companies aims to share risks across different regions and sectors, however, the rapidly changing business environment challenges companies with the increasing foreign ownership and changes in procurement. The complexity of today’s international construction services organisations raises two questions: how the organisations can successfully manage growth and what are their motives for international trade. The research focuses on top UK consulting engineering companies to understand their organisational strategy, their export strategy, and drivers for overseas activities. The data will feed a model of professional services exports, which can help to inform the way services export data could be collected to better reflect the industry’s performance.
Resumo:
The Bahrain International Circuit (BIC) is considered its one of the best international racing car track in terms of technical aspects and architectural quality. Two Formula 1 races have been hosted in the Kingdom of Bahrain, in 2004 and 2005, at BIC. The BIC had recently won the award of the best international racing car circuit. This paper highlights on the elements that contributed to the success of such project starting from the architectural aspects, construction, challenges, tendering process, risk management, the workforce, speed of the construction method, and future prospects for harnessing solar and wind energy for sustainable electrification and production of water for the circuit, i.e. making BIC green and environment-friendly international circuit.
Resumo:
Although much literature on construction procurement is based on personal experiences, there is little data available to undertake realistic comparison between regions or from one year to another. A survey was undertaken in the UK to examine the feasibility of developing a replicable survey technique that will enable longitudinal studies and international comparisons. The survey showed that a majority felt traditional procurement methods were inappropriate. However, traditional general contracting is still the most common form of procurement. There was strong agreement that economic muscle compels weaker contracting parties to accept onerous contractual terms. There is no relationship between the size of a project and its procurement method, contrary to popular belief. The findings indicate that wider surveys would generate useful data about attitudes.
Resumo:
Research in construction management is diverse in content and in quality. There is much to be learned from more fundamental disciplines. Construction is a sub-set of human experience rather than a completely separate phenomenon. Therefore, it is likely that there are few problems in construction requiring the invention of a completely new theory. If construction researchers base their work only on that of other construction researchers, our academic community will become less relevant to the world at large. The theories that we develop or test must be of wider applicability to be of any real interest. In undertaking research, researchers learn a lot about themselves. Perhaps the only difference between research and education is that if we are learning about something which no-one else knows, then it is research, otherwise it is education. Self-awareness of this will help to reduce the chances of publishing work which only reveals a researcher’s own learning curve. Scientific method is not as simplistic as non-scientists claim and is the only real way of overcoming methodological weaknesses in our work. The reporting of research may convey the false impression that it is undertaken in the sequence in which it is written. Construction is not so unique and special as to require a completely different set of methods from other fields of enquiry. Until our research is reported in mainstream journals and conferences, there is little chance that we will influence the wider academic community and a concomitant danger that it will become irrelevant. The most useful insights will come from research which challenges the current orthodoxy rather than research which merely reports it.
Resumo:
The purpose of this document is to provide a single source of reference for every paper published in the journals directly related to research in Construction Management. This volume brings together articles published during 1999. It is indexed by author and keyword and contains the titles, authors, abstracts and keywords of every article from the following journals: • Building Research and Information (BRI) • Construction Management and Economics (CME) • Engineering, Construction and Architectural Management (ECAM) • Journal of Construction Procurement (JCP) • RICS Research Papers (RICS) The index entries give short forms of the bibliographical citations, rather than page numbers, to enable rapid reference to articles. A cumulative volume is available from the editor. Included in this volume is an appendix listing a wide range of journals associated with construction management research, giving details of frequency, editorial addresses and web sites, as well as whether each journal is international and/or refereed.
Resumo:
Heat waves are expected to increase in frequency and magnitude with climate change. The first part of a study to produce projections of the effect of future climate change on heat-related mortality is presented. Separate city-specific empirical statistical models that quantify significant relationships between summer daily maximum temperature (T max) and daily heat-related deaths are constructed from historical data for six cities: Boston, Budapest, Dallas, Lisbon, London, and Sydney. ‘Threshold temperatures’ above which heat-related deaths begin to occur are identified. The results demonstrate significantly lower thresholds in ‘cooler’ cities exhibiting lower mean summer temperatures than in ‘warmer’ cities exhibiting higher mean summer temperatures. Analysis of individual ‘heat waves’ illustrates that a greater proportion of mortality is due to mortality displacement in cities with less sensitive temperature–mortality relationships than in those with more sensitive relationships, and that mortality displacement is no longer a feature more than 12 days after the end of the heat wave. Validation techniques through residual and correlation analyses of modelled and observed values and comparisons with other studies indicate that the observed temperature–mortality relationships are represented well by each of the models. The models can therefore be used with confidence to examine future heat-related deaths under various climate change scenarios for the respective cities (presented in Part 2).
Resumo:
A new heuristic for the Steiner Minimal Tree problem is presented here. The method described is based on the detection of particular sets of nodes in networks, the “Hot Spot” sets, which are used to obtain better approximations of the optimal solutions. An algorithm is also proposed which is capable of improving the solutions obtained by classical heuristics, by means of a stirring process of the nodes in solution trees. Classical heuristics and an enumerative method are used CIS comparison terms in the experimental analysis which demonstrates the goodness of the heuristic discussed in this paper.