51 resultados para Integrated impact assessment model
em CentAUR: Central Archive University of Reading - UK
Environmental impact assessment of forest and mining waste interactions in the Tamar River catchment
Resumo:
Stream-water flows and in-stream nitrate and ammonium concentrations in a small (36.7 ha) Atlantic Forest catchment were simulated using the Integrated Nitrogen in CAtchments (INCA) model version 1.9.4. The catchment, at Cunha, is in the Serra do Mar State Park, SE Brazil and is nearly pristine because the nearest major conurbations, Sao Paulo and Rio, are some 450 km distant. However, intensive farming may increase nitrogen (N) deposition and there are growing pressures for urbanisation. The mean-monthly discharges and NO3-N concentration dynamics were simulated adequately for the calibration and validation periods with (simulated) loss rates of 6.55 kg.ha(-1) yr(-1) for NO3-N and 3.85 kg.ha(-1) yr(-1) for NH4-N. To investigate the effects of elevated levels of N deposition in the future, various scenarios for atmospheric deposition were simulated; the highest value corresponded to that in a highly polluted area of Atlantic Forest in Sao Paulo City. It was found that doubling the atmospheric deposition generated a 25% increase in the N leaching rate, while at levels approaching the highly polluted Sao Paulo deposition rate, five times higher than the current rate, leaching increased by 240%, which would create highly eutrophic conditions, detrimental to downstream water quality. The results indicate that the INCA model can be useful for estimating N concentration and fluxes for different atmospheric deposition rates and hydrological conditions.
Resumo:
While building provides shelter for human being, the previous models for assessing the intelligence of a building seldom consider the responses of occupants. In addition, the assessment is usually conducted by an authority organization on a yearly basis, thus can seldom provide timely assistance for facility manager to improve his daily facility maintenance performance. By the extending the law of entropy into the area of intelligent building, this paper demonstrate that both energy consumption and the response of occupants are important when partially assessing the intelligence of a building. This study then develops a sensor based real time building intelligence (BI) assessment model. An experimental case study demonstrates how the model can be implemented. The developed model can address the two demerits of the previous BI assessment model.
Resumo:
This paper reviews the growing interest in an integrated construction project model, and examines the fundamental concept of an integrated project model by discussing the various definitions that have evolved as well as the various approaches to its development. The nature of collaborative communications that the integrated project model needs to support is also discussed, as are the enabling information and communications technologies that may have a role in the realization of the model. The paper concludes with some thoughts on the future development of the integrated construction project model.
Resumo:
Impact Assessments (IAs) were introduced at the EU level under the rhetorical facade of ‘better regulation’. The actual aim was to improve not only the quality but also the reputation of EU regulation before stakeholders. However, evidence brought forward by a number of evaluations pointed out that IAs are yet to achieve acceptable quality standards. The paper offers an overview of different disciplinary approaches for looking at IAs. It suggests that risk regulation encompasses the theoretical foundations to help understand the role of IAs in the EU decisionmaking process. The analysis of 60 early days preliminary IAs provides empirical evidence regarding policy alternatives, methodology of consultation and use of quantitative techniques. Findings suggest that dawn period IAs were used mainly to provide some empirical evidence for regulatory intervention in front of stakeholders. The paper concludes with assumptions about the future role of IAs at EU level.
Resumo:
In 2003 the European Commission started using Impact Assessment (IA) as the main empirical basis for its major policy proposals. The aim was to systematically assess ex ante the economic, social and environmental impacts of EU policy proposals. In parallel, research proliferated in search for theoretical grounds for IAs and in an attempt to evaluate empirically the performance of the first sets of IAs produced by the European Commission. This paper combines conceptual and evaluative studies carried out in the first five years of EU IAs. It concludes that the great discrepancy between rationale and practice calls for a different theoretical focus and a higher emphasis on evaluating empirically crucial risk economics aspects of IAs, such as the value of statistical life, price of carbon, the integration of macroeconomic modelling and scenario analysis.