72 resultados para Infrastructure Projects, International Construction, Australia, China
em CentAUR: Central Archive University of Reading - UK
Resumo:
This paper reports part of a qualitative study into evolving practice in the implementation of the Dispute Adjudication Board (DAB) construction dispute resolution technique, a variant of the Dispute Review Board (DRB) concept used in the US and Canada. Data was collected through a focus group interview of 20 highly experienced dispute resolution practitioners from engineering and the law. The group was assembled from members of FIDIC-NET with direct experience of project DABs. The part reported here concerns practice and procedure for establishing DABs. The main findings are that: constitution of the DABs is often delayed because of either project owners' ignorance of the DAB process or deterrence by the cost of the DABs; such owners also tend to insist on appointing DAB members from local engineers and lawyers without sufficient understanding of the DAB process; rates of remuneration of DAB members vary widely; the training provision for DAB membership and advocacy skills is inadequate; the process of selecting candidates for DAB membership and negotiating the tripartite agreement between each member and the contractual parties needs to be navigated with great care to avoid raising ethical problems. The research contribution is threefold. First, it highlights the importance of realistic fees for DAB members within a standard framework in achieving timely establishment of a board that works well as a team. Second, it illustrates the use of qualitative focus group interview to study the impact of new contract terms from multiple stakeholder perspectives. Finally, it identifies areas where further research is needed.
Resumo:
The international construction market is very complex, and requires strong structure and strategy for companies wanting to operate overseas. This article investigates characteristics of international construction. The international operation of Brazilian contractors is explored via results from a qualitative study which was carried out using case studies. The case studies comprised ten big Brazilian contractors, six of which operate abroad. The study identified the patterns of international operation, the competitive advantages of these contractors, as well as the difficulties faced by them in the international construction market. Four of the contractors studied operate only in the domestic market. The study of these cases revealed both obstacles and motivations for future international operations. The study revealed that despite the existing competitive advantages, Brazilian contractors' presence in the international market is limited. The main reason for that is probably their main competitive disadvantage: the lack of financial support from the government.
Resumo:
Libya with its strategic location and natural resources stands as a crucial link between the Arab world, Europe, and Africa. The people of Libya have an optimistic outlook with regard to the Libyan economy after the suspension of the United Nations sanctions in 1999 that had been imposed on Libya in 1992, as well as the recent emphasis on privatization from the government. Since then, local and foreign investors have been encouraged to take a more prominent role in order to help privatize some of the state run-industries; the attention to privatization is aimed to help Libya’s economic growth and reduce its heavy dependency on oil revenues. Considering the economic situation, Libya is a rich country. However, it needs to modernize, it needs more and better infrastructure, it needs non-oil based financing, furthermore, it needs to develop a financial model for development and investment from the private sector. Although the Libyan government is working on the improvement of the business environment to make it more attractive for foreign investors in a way to move towards privatization, they have ignored some of the challenges that privatization will be facing in Libya. Privatization can not be implemented overnight. They have taken this for granted without careful consideration of its challenges. This paper attempts to investigate and discuss the challenges that need to be taken into account before privatization of infrastructure projects can be introduced in Libya. This paper is based on interviews with senior technical officials in the government.
Resumo:
Construction professional services (CPSs), such as architecture, engineering, and consultancy, are not only high value-added profit centers in their own right but also have a knock-on effect on other businesses, such as construction and the export of materials and machinery. Arguably, competition in the international construction market has shifted to these knowledge-intensive CPS areas. Yet CPSs represent a research frontier that has received scant attention. This research aims to enrich the body of knowledge on CPSs by examining strengths, weaknesses, opportunities, and threats (SWOT) of Chinese CPSs (CCPSs) in the international context. It does so by triangulating theories with quantitative and qualitative data gleaned from yearbooks, annual reports, interviews, seminars, and interactions with managers in major CCPS companies. It is found that CCPSs present both strengths and weaknesses in talents, administration systems, and development strategies in dealing with the external opportunities and threats brought about by globalization and market evolution. Low price, which has helped the Chinese construction business to succeed in the international market, is also a major CCPS strength. An opportunity for CCPSs is the relatively strong delivery capability possessed by Chinese contractors; by partnering with them CCPSs can better establish themselves in the international arena. This is probably the first ever comprehensive study on the performance of CCPSs in the international marketplace. The research is conducted at an opportune time, particularly when the world is witnessing the burgeoning force of Chinese businesses in many areas including manufacturing, construction, and, potentially, professional services. It adds new insights to the knowledge body of CPSs and provides valuable references to other countries faced with the challenge of developing CPS business efficiently in the international market.
Resumo:
In contrast to their bustling construction counterparts, Chinese construction professional services (CPS) such as architecture, engineering, and consultancy, seem still to be stagnant in the international market. CPS are not only high value-added profit centers in their own right, but also have a knock-on effect on subsequent businesses such as construction, and the export of materials and machinery. Arguably, competition in the international construction market has shifted to knowledge-intensive CPS. Yet,CPS represent a research area that has been paid scant attention. This research aims to add to the body of knowledge of CPS by examining strengths, weaknesses, opportunities, and threats (SWOT) of Chinese CPS (CCPS) in the international context. It does so by triangulating theories with quantitative and qualitative data gleaned from yearbooks, annual reports, interviews, seminars, and interactions with managers in major CCPS companies. It is found that CCPS present both strengths and weaknesses in talents, administration systems, and development strategies in dealing with the external opportunities and threats brought about by globalization and market evolvement. Low price, which has helped the Chinese construction business to succeed in the international market, is also a CCPS major strength. An opportunity for CCPS is the relatively strong delivery capability possessed by Chinese contractors. By partnering with them CCPS can better edge into the international arena. This is probably the first ever comprehensive study in investigating the performance of CCPS in the international market. The research is also timely, particularly when the world is witnessing the burgeoning force of Chinese businesses in many areas including manufacturing, construction, and potentially, professional services.
Resumo:
There is a lack of knowledge base in relation to experiences gained and lessons learnt from previously executed National Health Service (NHS) infrastructure projects in the UK. This is in part a feature of one-off construction projects, which typify healthcare infrastructure, and in part due to the absence of a suitable method for conveying such information. The complexity of infrastructure delivery process in the NHS makes the construction of healthcare buildings a formidable task. This is particularly the case for the NHS trusts who have little or no experience of construction projects. To facilitate understanding a most important aspect of the delivery process, which is the preparation of a capital investment proposal; steps taken in developing the business case for an NHS healthcare facility are examined. The context for such examination is provided by the planning process of a healthcare project, studied retrospectively. The process is analysed using a social science based method called ‘building stories’, developed at the University of California-Berkeley. By applying this method, stories or narratives are constructed around the data captured on the case study. The findings indicate that the business case process may be used to justify, rather than identify, trusts’ requirements. The study is useful for UK public sector clients as well as consultants and professionals who aim to participate in the delivery of healthcare infrastructure projects in the UK.
Resumo:
he construction market around the world has witnessed the growing eminence of construction professional services (CPSs), such as urban planning, architecture, engineering, and consultancy, while the traditional contracting sector remains strong. Nowadays, it is not uncommon to see a design firm taking over the work of a traditional main contractor, or vice versa, of overseeing the delivery of a project. Although the two sectors of contracting and CPS share the same purpose of materializing the built environment, they are as different as they are interrelated. Much has been mentioned about the nexus between the two but little has been done to articulate it using empirical evidence. This study examined the nexus between contracting and CPS businesses by offering and testing lead-lag effects between the two sectors in the international market. A longitudinal panel data composed of 23 top international contractors and CPS firms was adopted. Surprisingly, results of the panel data analyses show that CPS business does not have a significant positive causal effect on contracting as a downstream business, and vice versa. CPS and contracting subsidiaries, although within the same company, do not necessarily form a consortium to undertake the same project; rather, they often collaborate with other CPS or contracting counterparts to undertake projects. This paper provides valuable insights into the sophisticated nexus between contracting and CPS in the international construction market. It will support business executives’ rational decision making for selecting proper contracting or CPS allies, or a proper mergers and acquisitions strategy in the international market. The paper also provides a fresh perspective through which researchers can better investigate the diversification strategies adopted by international contracting and CPS firms.
Resumo:
There is a renewed interest in immersive visualization to navigate digital data-sets associated with large building and infrastructure projects. Following work with a fully immersive visualization facility at the University, this paper details the development of a complementary mobile visualization environment. It articulates progress on the requirements for this facility; the overall design of hardware and software; and the laboratory testing and planning for user pilots in construction applications. Like our fixed facility, this new light-weight mobile solution enables a group of users to navigate a 3D model at a 1:1 scale and to work collaboratively with structured asset information. However it offers greater flexibility as two users can assemble and start using it at a new location within an hour. The solution has been developed and tested in a laboratory and will be piloted in engineering design review and stakeholder engagement applications on a major construction project.
Resumo:
The UK government is mandating the use of building information modelling (BIM) in large public projects by 2016. As a result, engineering firms are faced with challenges related to embedding new technologies and associated working practices for the digital delivery of major infrastructure projects. Diffusion of innovations theory is used to investigate how digital innovations diffuse across complex firms. A contextualist approach is employed through an in-depth case study of a large, international engineering project-based firm. The analysis of the empirical data, which was collected over a four-year period of close interaction with the firm, reveals parallel paths of diffusion occurring across the firm, where both the innovation and the firm context were continually changing. The diffusion process is traced over three phases: centralization of technology management, standardization of digital working practices, and globalization of digital resources. The findings describe the diffusion of a digital innovation as multiple and partial within a complex social system during times of change and organizational uncertainty, thereby contributing to diffusion of innovations studies in construction by showing a range of activities and dynamics of a non-linear diffusion process.
Resumo:
The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports by Latham (1994, Constructing the Team, HMSO, London) and Egan (1998, Rethinking Construction, HMSO, London). A major problem for construction companies is the lack of project predictability. One method of increasing predictability and delivering increased customer value is through the systematic management of construction processes. However, the industry has no methodological mechanism to assess process capability and prioritise process improvements. Standardized Process Improvement for Construction Enterprises (SPICE) is a research project that is attempting to develop a stepwise process improvement framework for the construction industry, utilizing experience from the software industry, and in particular the Capability Maturity Model (CMM), which has resulted in significant productivity improvements in the software industry. This paper introduces SPICE concepts and presents the results from two case studies conducted on design and build projects. These studies have provided further in-sight into the relevance and accuracy of the framework, as well as its value for the construction sector.
Resumo:
Contracts are put to a wide variety of uses. Those who draft construction contracts in the UK rarely consider all of the potential uses and therefore may produce documents that are less than ideal. The various uses are considered in their theoretical background before turning to the practical difficulties often encountered in trying to fulfil such diverse aims. The question of standardisation is examined within this context. Existing standard forms of contract in the UK are found to do little to overcome these difficulties, and this encourages either a significant level of amendment to the standards or experienced clients to draft their own forms. The solution is an approach to contract drafting which is designed to offer a compromise; better standard forms, based on the lessons learned from the drafting of non-standard forms and a pooling of experience, including that of lawyers, in the drafting process. Although this paper is based upon the experience of the UK, these conclusions are relevant for contract-drafting practice in general.