60 resultados para Indonesian contractors

em CentAUR: Central Archive University of Reading - UK


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Formal and analytical risk models prescribe how risk should be incorporated in construction bids. However, the actual process of how contractors and their clients negotiate and agree on price is complex, and not clearly articulated in the literature. Using participant observation, the entire tender process was shadowed in two leading UK construction firms. This was compared to propositions in analytical models and significant differences were found. 670 hours of work observed in both firms revealed three stages of the bidding process. Bidding activities were categorized and their extent estimated as deskwork (32%), calculations (19%), meetings (14%), documents (13%), off-days (11%), conversations (7%), correspondence (3%) and travel (1%). Risk allowances of 1-2% were priced in some bids and three tiers of risk apportionment in bids were identified. However, priced risks may sometimes be excluded from the final bidding price to enhance competitiveness. Thus, although risk apportionment affects a contractor’s pricing strategy, other complex, microeconomic factors also affect price. Instead of pricing in contingencies, risk was priced mostly through contractual rather than price mechanisms, to reflect commercial imperatives. The findings explain why some assumptions underpinning analytical models may not be sustainable in practice and why what actually happens in practice is important for those who seek to model the pricing of construction bids.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the tender process, contractors often rely on subcontract and supply enquiries to calculate their bid prices. However, this integral part of the bidding process is not empirically articulated in the literature. Over 30 published materials on the tendering process of contractors that talk about enquiries were reviewed and found to be based mainly on experiential knowledge rather than systematic evidence. The empirical research here helps to describe the process of enquiries precisely, improve it in practice, and have some basis to support it in theory. Using a live participant observation case study approach, the whole tender process was shadowed in the offices of two of the top 20 UK civil engineering construction firms. This helped to investigate 15 research questions on how contractors enquire and obtain prices from subcontractors and suppliers. Forty-three subcontract enquiries and 18 supply enquiries were made across two different projects with average value of 7m. An average of 15 subcontract packages and seven supply packages was involved. Thus, two or three subcontractors or suppliers were invited to bid in each package. All enquiries were formulated by the estimator, with occasional involvement of three other personnel. Most subcontract prices were received in an average of 14 working days; and supply prices took five days. The findings show 10 main activities involved in processing enquiries and their durations, as well as wasteful practices associated with enquiries. Contractors should limit their enquiry invitations to a maximum of three per package, and optimize the waiting time for quotations in order to improve cost efficiency.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to show the extent to which clients amend standard form contracts in practice, the locus of the amendments, and how contractors respond to the amendments when putting together a bid. Design/methodology/approach – Four live observational case studies were carried out in two of the top 20 UK construction firms. The whole process used to review the proposed terms and conditions of the contract was shadowed using participant observation, interview and documentary analysis. Findings – All four cases showed strong evidence of amendments relating mostly to payment and contractual aspects: 83 amendments in Case Study 1 (CS1), 80 in CS2, 15 in CS3 and 29 in CS4. This comprised clauses that were modified (37 per cent), substituted (23 per cent), deleted (7 per cent) and new additions (33 per cent). Risks inherent in the amendments were mostly addressed through contractual rather than price mechanisms, to reflect commercial imperatives. “Qualifications” and “clarifications” were included in the tender submissions for post-tender negotiations. Thus, the amendments did not necessarily influence price. There was no evidence of a “standard-form contract“ being used as such, although clients may draw on published “standard-form contracts” to derive the forms of contract actually used in practice. Practical implications – Contractors should pay attention to clauses relating to contractual and financial aspects when reviewing tender documents. Clients should draft equitable payment and contractual terms and conditions to reduce risk of dispute. Indeed, it is prudent for clients not to pass on inestimable risks. Originality/value – A better understanding of the extent and locus of amendments in standard form contracts, and how contractors respond, is provided.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Formal and analytical models that contractors can use to assess and price project risk at the tender stage have proliferated in recent years. However, they are rarely used in practice. Introducing more models would, therefore, not necessarily help. A better understanding is needed of how contractors arrive at a bid price in practice, and how, and in what circumstances, risk apportionment actually influences pricing levels. More than 60 proposed risk models for contractors that are published in journals were examined and classified. Then exploratory interviews with five UK contractors and documentary analyses on how contractors price work generally and risk specifically were carried out to help in comparing the propositions from the literature to what contractors actually do. No comprehensive literature on the real bidding processes used in practice was found, and there is no evidence that pricing is systematic. Hence, systematic risk and pricing models for contractors may have no justifiable basis. Contractors process their bids through certain tendering gateways. They acknowledge the risk that they should price. However, the final settlement depends on a set of complex, micro-economic factors. Hence, risk accountability may be smaller than its true cost to the contractor. Risk apportionment occurs at three stages of the whole bid-pricing process. However, analytical approaches tend not to incorporate this, although they could.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Gaining or maintaining a “contractor's” competitive advantage is not easy as it is determined by a large number of factors. Identification of critical success factors (CSFs) allows one to reduce the vast number of factors to some manageable few but vital ones. Based on the CSFs, contractors' limited resources such as money and manpower can be allocated and aligned appropriately for yielding a maximum outcome of overall competitiveness. This paper describes the CSFs identified from a survey study carried out in Mainland China. The ranking analysis of the survey results shows that 35 factors are rated as critical for determining the competitiveness of a contractor. Factor analysis reveals that the 35 CSFs identified can be grouped into eight clusters, namely, project management skills, organization structure, resources, competitive strategy, relationships, bidding, marketing, and technology. The CSFs in this study provide a vehicle for guiding a contractor in managing its resources in order to improve competitive advantage. The study also provides insights into the management of competitiveness for contractors that are operating in the particular context of the Chinese construction industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The international construction market is very complex, and requires strong structure and strategy for companies wanting to operate overseas. This article investigates characteristics of international construction. The international operation of Brazilian contractors is explored via results from a qualitative study which was carried out using case studies. The case studies comprised ten big Brazilian contractors, six of which operate abroad. The study identified the patterns of international operation, the competitive advantages of these contractors, as well as the difficulties faced by them in the international construction market. Four of the contractors studied operate only in the domestic market. The study of these cases revealed both obstacles and motivations for future international operations. The study revealed that despite the existing competitive advantages, Brazilian contractors' presence in the international market is limited. The main reason for that is probably their main competitive disadvantage: the lack of financial support from the government.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The main aim of this study was to ascertain and discuss the current challenges and opportunities facing construction contractors in Ghana. This involved a review of the economic, legal and political environments in which contractors in Ghana operate; a review of published studies on construction in developing countries generally and Ghana specifically; and in-depth interviews and discussions with seven building and civil engineering contractors in Ghana in 2009 and 2010. Six road contractors were also interviewed. The findings indicate significant challenges relating mainly to financing for projects and a harsh business environment. However, most contractors interviewed admitted to significant problems in their own organisations. It is clear that the contracting environment in Ghana is harsh particularly for local contractors who are often not paid on time and without compensation for late payment. However, local construction firms in Ghana who want to breakthrough ought to formulate the right strategic plans, develop innovative business strategies, develop professionalism, and merge with local firms with similar organisational values and characteristics. In short, local or indigenous Ghanaian contractors ought to face up to the reality of competition and the dynamics of modern business in order to survive, grow and become major players in the construction industry in Ghana.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper provides some preliminary insights into the emergence and development of indigenous general contractors in Ghana. General contracting is the means by which an individual or organisation takes responsibility for supplying all of the materials, labour, equipment and services necessary for the construction of a project. Whereas the development of general contracting in places like the UK is well documented, the evolution of contractors in Ghana is not clearly articulated in the literature. Therefore, the main question in this paper is: How did indigenous contractors evolve in Ghana? To examine and analyze the research question, a literature review on similar developments elsewhere was first carried out. This was followed by discussions and unstructured interviews with experienced construction practitioners in Ghana most of whom were Quantity Surveyors. Most interviewees narrated their knowledge of contractor development in Ghana dating back to around 1945. From the explanations given, it was possible to develop a general understanding of the research question and to make a qualitative interpretation of the respondents’ comments and to draw some conclusions. General contractors emerged rapidly in the Gold Coast (now Ghana) shortly after World War II. Most were Italian master craftsmen in Ghana who were capitalized by the British colonial government to develop infrastructure in the Gold Coast following devastating effects of the war. Some of the indigenous people learned from the Italians and also established construction firms. Thus, general contracting in Ghana has a relatively short history in comparison to countries like Britain where the profession developed rapidly in the early part of the 19th century in response to the industrial revolution. Although they may possess sufficient technical expertise, many indigenous contractors in Ghana today lack the capacity to carry out major projects because of low capitalization and poor organisational structures. The current construction market in Ghana is dominated by foreign contractors. To become major players in the market, indigenous Ghanaian contractors should build strong organisational structures and pursue mergers and joint venturing to boost their financial, technical and managerial capacity.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The process of how contractors take account of risk when calculating their bids for construction work is investigated based on preliminary investigations and case studies in Ghana and UK. Ghana and UK were chosen, more or less arbitrarily, for the purpose of case studies, and to test the idea that there are systematic differences between the approaches in different places. Clear differences were found in the risk pricing approaches of contractors in the two countries. The difference appeared to emanate from the professional knowledge and competence of the bid team members, company policy, corporate accountability and the business environments in which the contractors operate. Both groups of contractors take account of risk in estimates. However, risk accountability was found to be higher on the agenda in the tender process of UK contractors, documented more systematically, and assessed and managed more rigorously with input from the whole bid team. Risk accountability takes place at three levels of the tender process and is dictated strongly by market forces and company circumstances.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Government and institutionally-driven ‘good practice transfer’ initiatives are consistently presented as a means to enhance construction firm and industry performance. Two implicit tenets of these initiatives appear to be: knowledge embedded in good practice will transfer automatically; and, the potential of implementing good practice will be capitalised regardless of the context where it is to be used. The validity of these tenets is increasingly being questioned and, concurrently, more nuanced knowledge production understandings are being developed which recognise and incorporate context-specificity. This research contributes to this growing, more critical agenda by examining the actual benefits accrued from good practice transfer from the perspective of a small specialist trade contracting firm. A concept model for successful good practice transfer is developed from a single longitudinal case study within a small heating and plumbing firm. The concept model consists of five key variables: environment, strategy, people, technology, and organisation of work. The key findings challenge the implicit assumptions prevailing in the existing literature and support a contingency approach that argues successful good practice transfer is not just adopting and mechanistically inserting into the firm, but requires addressing ‘behavioural’ aspects. For successful good practice transfer, small specialist trade contracting firms need to develop and operationalise organisation slack, mechanisms for scanning external stimuli and absorbing knowledge. They also need to formulate and communicate client-driven external strategies; to motive and educate people at all levels; to possess internal or accessible complementary skills and knowledge; to have ‘soft focus’ immediate/mid-term benefits at a project level; and, to embed good practice in current work practices.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Over the past decade, the independent sales contractor (ISC) has emerged as both an important distribution channel and a management challenge. This study makes two contributions to this evolving field. First, it explores the interrelations of the psychological contract with sales performance, voluntary turnover and organisational advocacy of ISCs, which have hitherto been largely unexplored. Second, it examines differences between high- and low-performing sales contractors on these linkages, due to findings in the literature that a small number of sales contractors often achieve a majority of sales. Based on survey data as well as 7 years of contractor-level data related to sales performance and voluntary turnover (n = 189), results indicate that psychological contract fulfilment and perceived dependency are important determinants of subsequent sales performance, voluntary turnover and organisational advocacy, with significant differences reported between high- and low-performing ISCs. A notable finding pertinent for sales managers responsible for managing ISCs is that high-performing sales contractors are motivated by psychological contract fulfilment and a low perception of dependency, while low-performing sales contractors are more likely to act as advocates for the firm due to perceived dependency, but may concurrently engage in organisational advocacy as a means to leave the firm.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The origins of the various procurement methods in construction are considered, followed by a discussion of the circumstances for which each procurement system is best suited. The likely future development sin management-based methods are discussed in the context of current research, showing that co-ordination of trade and specialist contractors , more flexible contracting, constructive conflict management and a potential polarization of views about project management in the industry are likely.