5 resultados para High powered contracts
em CentAUR: Central Archive University of Reading - UK
Resumo:
The hazards associated with high-voltage three-phase inverters and high-powered large electrical machines have resulted in most of the engineering courses covering three-phase machines and drives theoretically. This paper describes a set of purpose-built, low-voltage, and low-cost teaching equipment that allows the hands-on instruction of three-phase inverters and rotating machines. The motivation for moving towards a system running at low voltages is that the students can safely experiment freely with the motors and inverter. The students can also access all of the current and voltage waveforms, which until now could only be studied in textbooks or observed as part of laboratory demonstrations. Both the motor and the inverter designs are for teaching purposes and require minimal effort and cost
Resumo:
The hazards associated with high-voltage three-phase inverters and high-powered large electrical machines have resulted in most of the engineering courses covering three-phase machines and drives theoretically. This paper describes a set of purpose-built, low-voltage, and low-cost teaching equipment that allows the hands-on instruction of three-phase inverters and rotating machines. The motivation for moving towards a system running at low voltages is that the students can safely experiment freely with the motors and inverter. The students can also access all of the current and voltage waveforms, which until now could only be studied in textbooks or observed as part of laboratory demonstrations. Both the motor and the inverter designs are for teaching purposes and require minimal effort and cost.
Resumo:
The context of construction management (CM) reveals that this method of procurement is as much a management philosophy as a contract structure. It is important to consider legal and contractual issues in this context. The interplay between management and law is complex and often misunderstood. Before considering specific issues, the use of contractual remedies in business agreements is discussed. In addition, the extent to which standardising a form of contract detracts or contributes to the success of projects is also considered. The dearth of judicial decisions, and the lack of a standard form, render it difficult to be specific about legal issues. Therefore, the main discussion of legal issues is centred around a recently completed research project which involved eliciting the views of a cross-section of experienced construction management clients, consultants and trade contractors. These interviews are used as the basis for highlighting some of the most important legal points to consider when setting up CM projects. The interviews revealed that the advantage of CM is the proximity of the client to the trade contractors and the disadvantage is that it depends on a high degree of professionalism and experience; qualities which are unfortunately difficult to find in the UK construction industry.
Resumo:
Over the past decade, the independent sales contractor (ISC) has emerged as both an important distribution channel and a management challenge. This study makes two contributions to this evolving field. First, it explores the interrelations of the psychological contract with sales performance, voluntary turnover and organisational advocacy of ISCs, which have hitherto been largely unexplored. Second, it examines differences between high- and low-performing sales contractors on these linkages, due to findings in the literature that a small number of sales contractors often achieve a majority of sales. Based on survey data as well as 7 years of contractor-level data related to sales performance and voluntary turnover (n = 189), results indicate that psychological contract fulfilment and perceived dependency are important determinants of subsequent sales performance, voluntary turnover and organisational advocacy, with significant differences reported between high- and low-performing ISCs. A notable finding pertinent for sales managers responsible for managing ISCs is that high-performing sales contractors are motivated by psychological contract fulfilment and a low perception of dependency, while low-performing sales contractors are more likely to act as advocates for the firm due to perceived dependency, but may concurrently engage in organisational advocacy as a means to leave the firm.
Resumo:
The use of economic incentives for biodiversity (mostly Compensation and Reward for Environmental Services including Payment for ES) has been widely supported in the past decades and became the main innovative policy tools for biodiversity conservation worldwide. These policy tools are often based on the insight that rational actors perfectly weigh the costs and benefits of adopting certain behaviors and well-crafted economic incentives and disincentives will lead to socially desirable development scenarios. This rationalist mode of thought has provided interesting insights and results, but it also misestimates the context by which ‘real individuals’ come to decisions, and the multitude of factors influencing development sequences. In this study, our goal is to examine how these policies can take advantage of some unintended behavioral reactions that might in return impact, either positively or negatively, general policy performances. We test the effect of income's origin (‘Low effort’ based money vs. ‘High effort’ based money) on spending decisions (Necessity vs. Superior goods) and subsequent pro social preferences (Future pro-environmental behavior) within Madagascar rural areas, using a natural field experiment. Our results show that money obtained under low effort leads to different consumption patterns than money obtained under high efforts: superior goods are more salient in the case of low effort money. In parallel, money obtained under low effort leads to subsequent higher pro social behavior. Compensation and rewards policies for ecosystem services may mobilize knowledge on behavioral biases to improve their design and foster positive spillovers on their development goals.