9 resultados para Energy facilities
em CentAUR: Central Archive University of Reading - UK
Resumo:
The Bahrain International Circuit (BIC) and complex, at latitude 26.00N and longitude 51.54E, was built in 483 days and cost 150 million US$. The circuit consists of six different individual tracks with a 3.66 km outer track (involving 10 turns) and a 2.55 km inner track (having six turns). The complex has been designed to host a variety of other sporting activities. Fifty thousand spectators, including 10,500 in the main grandstand, can be accommodated simultaneously. State-of-the art on-site media and broadcast facilities are available. The noise level emitted from vehicles on the circuit during the Formula-1 event, on April 4th 2004, was acceptable and caused no physical disturbance to the fans in the VIP lounges or to scholars studying at the University of Bahrain's Shakeir Campus, which is only 1.5 km away from the circuit. The sound-intensity level (SIL) recorded on the balcony of the VIP lounge was 128 dB(A) and was 80 dB(A) inside the lounge. The calculated SIL immediately outside the lecture halls of the University of Bahrain was 70 dB(A) and 65 dB(A) within them. Thus racing at BIC can proceed without significantly disturbing the academic-learning process. The purchased electricity demand by the BIC complex peaked (at 4.5 MW) during the first Formula-1 event on April 4th 2004. The reverse-osmosis (RO) plant at the BIC provides 1000 m(3) of desalinated water per day for landscape irrigation. Renewable-energy inputs, (i.e., via solar and wind power), at the BIC could be harnessed to generate electricity for water desalination, air conditioning, lighting as well as for irrigation. If the covering of the BIC complex was covered by adhesively fixed modern photovoltaic cells, then similar to 1.2 MW of solar electricity could be generated. If two horizontal-axis, at 150 m height above the ground, three 75m bladed, wind turbines were to be installed at the BIC, then the output could reach 4 MW. Furthermore, if 10,000 Jojoba trees (a species renowned for having a low demand for water, needing only five irrigations per year in Bahrain and which remain green throughout the year) are planted near the circuit, then the local micro-climate would be improved with respect to human comfort as well as the local environment becoming cleaner.
Resumo:
The construction industry with its nature of project delivery is very fragmented in terms of the various processes that encompass design, construction, facilities and assets management. Facilities managers are in the forefront of delivering sustainable assets management and hence further the venture for mitigation and adaptation to climate change. A questionnaire survey was conducted to establish perceptions, level of commitment and knowledge chasm in practising sustainable facilities management (FM). This has significant implications for sustainable design management, especially in a fragmented industry. The majority of questionnaire respondents indicated the importance of sustainability for their organization. Many of them stated that they reported on sustainability as part of their organization annual reporting with energy efficiency, recycling and waste reduction as the main concern for them. The overwhelming barrier for implementing sound, sustainable FM is the lack of consensual understanding and focus of individuals and organizations about sustainability. There is a knowledge chasm regarding practical information on delivering sustainable FM. Sustainability information asymmetry in design, construction and FM processes render any sustainable design as a sentiment and mere design aspiration. Skills and training provision, traditionally offered separately to designers and facilities managers, needs to be re-evaluated. Sustainability education and training should be developed to provide effective structures and processes to apply sustainability throughout the construction and FM industries coherently and as common practice.
Resumo:
Electricity consumption in Ghana is estimated to be increasing by 10% per annum due to the demand from the growing population. However, current sources of production (hydro and thermal facilities) generate only 66% of the current demand. Considering current trends, it is difficult to substantiate these basic facts, because of the lack of information. As a result, research into the existing sources of generating electricity, electricity consumption and prospective projects has been performed. This was achieved using three key techniques; review of literature, empirical studies and modelling. The results presented suggest that, current annual installed capacity of energy generation (i.e. 1960 MW) must be increased to 9,405.59 MW, assuming 85% plant availability. This is then capable to coop with the growing demand and it would give access to the entire population as well as support commercial and industrial activities for the growth of the economy. The prospect of performing this research is with the expectation to present an academic research agenda for further exploration into the subject area, without which the growth of the country would be stagnant.
Resumo:
Purpose – The purpose of this paper is to present the findings and lessons learned from three case studies conducted for facilities located in California, North America. The findings aim to focus on energy and maintenance management practices and the interdependent link between energy and maintenance. Design/methodology/approach – The research is based on a positivist epistemological philosophical approach informed by action research. The research cycle was completed for each case study. A case study report was provided to each facility management team to foster collaboration with the researcher and to document case study process and results. Findings – Composite findings of the case studies include: there is an interdependent link between energy and maintenance management; reactive maintenance and energy management methods are commonly used; and more proactively operated and managed buildings require the interdependent link between energy maintenance management to be better understood. Research limitations/implications – The three case studies were located in California. Although the case study results can be generalized, determination of how to generalize and apply the results to commercial buildings outside of the USA is beyond the scope of this paper. Practical implications – Detailed discussion of the needs of the three facility management teams are discussed by identifying a current challenge, developing a solution and documenting lessons learned using the research cycle. Originality/value – The paper seeks to demonstrate the interdependencies of energy and maintenance management, two topics which are often researched interdependently. Additionally, the paper provides insight about maintenance management, a topic often cited as being under researched.
Resumo:
Reducing energy use in tenanted commercial property requires a greater understanding of ‘buildings as communities’. Tenanted commercial properties represent: (1) the divergent communities that share specific buildings; and (2) the organizational communities represented by multi-site landlord and tenant companies. In any particular tenanted space the opportunity for environmental change is mediated (hindered or enabled) through the lease. This discussion draws on theoretical and practical understandings of (1) the socio-legal relationships of landlords, tenants and their advisors; (2) the real performance of engineering building services strategies to improve energy efficiency; (3) how organizational cultures affect the ability of the sector to engage with energy-efficiency strategies; and (4) the financial and economic basis of the relationship between owners and occupiers. The transformational complexity stems from: (1) the variety of commercial building stock; (2) the number of stakeholders (solicitors, investors, developers, agents, owners, tenants and facilities managers); (3) the fragmentation within the communities of practice; and (4) leasehold structures and language. An agenda is proposed for truly interdisciplinary research that brings together both the physical and the social sciences of energy use in buildings so that technological solutions are made effective by an understanding of the way that buildings are used and communities behave.
Resumo:
Due to the changing nature of the facilities management (FM) profession, facilities managers are increasingly engaged with the evolving sustainability agenda in the UK and the development or uptake of sustainability policies within their organisations. This study investigates how facilities managers are engaging with the sustainability agenda and the drivers, policy issues and information they use to improve their sustainability performance management. A web based self-administered questionnaire survey of facilities managers in the UK was conducted to identify drivers and issues that influence and support good sustainable practices. A total of 268 facilities managers responded. The results indicate that legislation is the most important driver for the implementation of sustainable practices. Corporate image and Organisational ethos are also recognised. However demand for efficient monitoring, management and reporting on environmental impact is not highly rated even though the top three issues of sustainability managed by facilities managers are energy management, waste and recycling management and carbon footprint. In addition, facilities managers are expected to take ownership of activities assigned to the reduction of carbon emission. Government industries and organisation with high turnover are more likely to have a sustainability policy. Financial constraints are the main barriers while legislations are the main driver for implementing sustainability. For non-profit organisations and the charitable sector, financial constraints are no hindrance to implementing a sustainability policy. The conclusion drawn is that sustainability agendas continue to be influenced by regulated environmental issues rather than a balanced approach which takes into consideration the wider social and economic aspects of sustainability. While this scenario is far from ideal, the expectation is that the organisation will trust FM to take a vital role in delivering a comprehensive sustainability policy due to the rising tide of legislation, public scrutiny, as well as the needed business case for genuinely embracing sustainability. However, as the integration of sustainability with core business strategies is continuously evolving the emphasis on different drivers will vary from organisation to organisation as well as the responsibilities of facilities managers.
Resumo:
Concern for the environmental impact of organizations’ activities has led to the recognition and demand for organizations to manage and report on their carbon footprint. However, there is no limit as to the areas of carbon footprints required in such annual environmental reports. To deliver improvements in the quality of carbon footprint management and reporting, there is a need to identify the main elements of carbon footprint strategy that can be endorsed, supported and encouraged by facility managers. The study investigates carbon footprint elements managed and reported upon by facility manager in the UK. Drawing on a questionnaire survey of 256 facility managers in the UK, the key elements of carbon footprints identified in carbon footprint reports are examined. The findings indicate that the main elements are building energy consumption, waste disposal and water consumption. Business travel in terms of using public transport, air travel and company cars are also recognized as important targets and objectives for the carbon footprint strategy of several FM (facilities management) organizations.
Resumo:
Commercial kitchens are one of the most profligate users of gas, water and electricity in the UK and can leave a large carbon footprint. It is estimated that the total energy consumption of Britain’s catering industry is in excess of 21,600 million kWh per year. In order to facilitate appropriate energy reduction within licensed restaurants, energy use must be translated into a form that can be compared between kitchens to enable operators to assess how they are improving and to allow rapid identification of facilities which require action. A review of relevant literature is presented and current benchmarking methods are discussed in order to assist in the development and categorisation of benchmarking energy reduction in commercial kitchens. Energy use within UK industry leading brands is discussed for the purpose of benchmarking in terms of factors such as size and output.
Resumo:
It is generally accepted that the physical workplace environment affects employees’ satisfaction and, consequently, their perceived productivity and well-being. This study investigated whether employee “satisfaction” variables can predict perceived productivity, well-being and enjoyment at work, and if so, to what extent. The study also explored whether limiting employees’ control over their environment could save energy without compromising employees’ satisfaction and perceived productivity. Preoccupancy and post-occupancy evaluation studies were conducted, in terms of both energy consumption and employee perceptions, to make comparisons between a company’s old and current headquarters buildings, both located in the same area of London. The results showed that employees were more satisfied with their work environment at their new HQ, in general, than with that of their previous office. Also, employees’ self-reported productivity, well-being and enjoyment at work improved after the move. It was revealed that the combination of employees’ level of satisfaction with “interior use of space” and “physical conditions” was the best predictor of their perceived productivity, while satisfaction with “indoor facilities” was not a good predictor. In terms of energy performance, although the new HQ’s energy consumption per m2 was significantly less than that of the previous building, there was still a gap between the refurbishment design target and the actual performance of the building. The findings suggest that this gap could be due to a number of factors, including an ineffective use of interior space, and occupants’ behaviour.