50 resultados para Dynamic Power Management
em CentAUR: Central Archive University of Reading - UK
Resumo:
In this paper, a power management strategy (PMS) has been developed for the control of energy storage in a system subjected to loads of random duration. The PMS minimises the costs associated with the energy consumption of specific systems powered by a primary energy source and equipped with energy storage, under the assumption that the statistical distribution of load durations is known. By including the variability of the load in the cost function, it was possible to define the optimality criteria for the power flow of the storage. Numerical calculations have been performed obtaining the control strategies associated with the global minimum in energy costs, for a wide range of initial conditions of the system. The results of the calculations have been tested on a MATLAB/Simulink model of a rubber tyre gantry (RTG) crane equipped with a flywheel energy storage system (FESS) and subjected to a test cycle, which corresponds to the real operation of a crane in the Port of Felixstowe. The results of the model show increased energy savings and reduced peak power demand with respect to existing control strategies, indicating considerable potential savings for port operators in terms of energy and maintenance costs.
Resumo:
This paper presents the evaluation in power consumption of a clocking technique for pipelined designs. The technique shows a dynamic power consumption saving of around 30% over a conventional global clocking mechanism. The results were obtained from a series of experiments of a systolic circuit implemented in Virtex-II devices. The conversion from a global-clocked pipelined design to the proposed technique is straightforward, preserving the original datapath design. The savings can be used immediately either as a power reduction benefit or to increase the frequency of operation of a design for the same power consumption.
Resumo:
The recent recovery of an empirically and ethically richer realist tradition involves an explicit contrast with neorealism's more scientistic explanatory aspirations. This contrast is, however, incomplete. Although Waltz's theoretical work is shaped by his understanding of the requirements of scientific adequacy, his empirical essays are normatively quite rich: he defends bipolarity, and criticizes US adventurism overseas, because he believes bipolarity to be conducive to effective great power management of the international system, and hence to the avoidance of nuclear war. He is, in this sense, a theorist divided against himself: much of his oeuvre exhibits precisely the kind of pragmatic sensibility that is typically identified as distinguishing realism from neorealism. His legacy for a reoriented realism is therefore more complex than is usually realized. Indeed, the nature of Waltz's own analytical endeavour points towards a kind of international political theory in which explanatory and normative questions are intertwined.
Resumo:
Probabilistic hydro-meteorological forecasts have over the last decades been used more frequently to communicate forecastuncertainty. This uncertainty is twofold, as it constitutes both an added value and a challenge for the forecaster and the user of the forecasts. Many authors have demonstrated the added (economic) value of probabilistic over deterministic forecasts across the water sector (e.g. flood protection, hydroelectric power management and navigation). However, the richness of the information is also a source of challenges for operational uses, due partially to the difficulty to transform the probability of occurrence of an event into a binary decision. This paper presents the results of a risk-based decision-making game on the topic of flood protection mitigation, called “How much are you prepared to pay for a forecast?”. The game was played at several workshops in 2015, which were attended by operational forecasters and academics working in the field of hydrometeorology. The aim of this game was to better understand the role of probabilistic forecasts in decision-making processes and their perceived value by decision-makers. Based on the participants’ willingness-to-pay for a forecast, the results of the game show that the value (or the usefulness) of a forecast depends on several factors, including the way users perceive the quality of their forecasts and link it to the perception of their own performances as decision-makers.
Resumo:
The PhD process is uncertain, idiosyncratic and vague. Research into the management of PhDs has proved very useful for supervisors and students. It is important for everyone involved in the process to be aware of what can be done to improve the likelihood of success for PhD studies. There are many ways of tackling a PhD and it is not possible to describe construction management as a generic type of study. Rather, construction management is a source of problems and data, whereas solutions and approaches need to be based within established academic disciplines. The clear definition of a research project is an essential prerequisite for success. Although PhDs are difficult, there are many things that can be done by departments, supervisors and students to ease the difficulties. In the long run, the development of an active and dynamic research community is dependent upon a steady flow of high quality PhDs. No-one benefits from an uncompleted or failed PhD.
Resumo:
Patterns of communication and behaviour emerge within a construction project in response to a construction crisis. This paper investigates, within a grounded theory framework, the nature of these patterns, the sociological and psychological forces which shape them and their relationship with crisis management efficiency. A grounded theory is presented in four parts. The first part conceives a construction crisis as a period of social instability, arising from conflicting interest groups, seeking to exercise power in the pursuit of social structures which suit their political and economic interests. The second part sees a construction crisis as a de-sensitizing phenomenon which results in a period of behavioural instability and conflict which is self-perpetuating. The third part cites social structure as an important influence upon construction crisis management efficiency, in determining the efficiency of information flow, and the level of uncertainty between those affected. The fourth part points to the in-built defence mechanisms which construction crises have and to three managerial ironies which make construction crisis management difficult.
Resumo:
In this paper we present an architecture for network and applications management, which is based on the Active Networks paradigm and shows the advantages of network programmability. The stimulus to develop this architecture arises from an actual need to manage a cluster of active nodes, where it is often required to redeploy network assets and modify nodes connectivity. In our architecture, a remote front-end of the managing entity allows the operator to design new network topologies, to check the status of the nodes and to configure them. Moreover, the proposed framework allows to explore an active network, to monitor the active applications, to query each node and to install programmable traps. In order to take advantage of the Active Networks technology, we introduce active SNMP-like MIBs and agents, which are dynamic and programmable. The programmable management agents make tracing distributed applications a feasible task. We propose a general framework that can inter-operate with any active execution environment. In this framework, both the manager and the monitor front-ends communicate with an active node (the Active Network Access Point) through the XML language. A gateway service performs the translation of the queries from XML to an active packet language and injects the code in the network. We demonstrate the implementation of an active network gateway for PLAN (Packet Language for Active Networks) in a forty active nodes testbed. Finally, we discuss an application of the active management architecture to detect the causes of network failures by tracing network events in time.
Resumo:
Recently, two approaches have been introduced that distribute the molecular fragment mining problem. The first approach applies a master/worker topology, the second approach, a completely distributed peer-to-peer system, solves the scalability problem due to the bottleneck at the master node. However, in many real world scenarios the participating computing nodes cannot communicate directly due to administrative policies such as security restrictions. Thus, potential computing power is not accessible to accelerate the mining run. To solve this shortcoming, this work introduces a hierarchical topology of computing resources, which distributes the management over several levels and adapts to the natural structure of those multi-domain architectures. The most important aspect is the load balancing scheme, which has been designed and optimized for the hierarchical structure. The approach allows dynamic aggregation of heterogenous computing resources and is applied to wide area network scenarios.
Resumo:
How do organizations previously dominated by the state develop dynamic capabilities that would support their growth in a competitive market economy? We develop a theoretical framework of organizational transformation that explains the processes by which organizations learn and develop dynamic capabilities in transition economies. Specifically, the framework theorizes about the importance of, and inter-relationships between, leadership, organizational learning, dynamic capabilities, and performance over three stages of transformation. Propositions derived from this framework explain the pre-conditions enabling organizational learning, the linkages between types of learning and functions of dynamic capabilities, and the feedback from dynamic capabilities to organizational learning that allows firms in transition economies to regain their footing and build long-term competitive advantage. We focus on transition contexts, where these processes have been magnified and thus offer new insights into strategizing in radically altered environments.
Resumo:
Planning is a vital element of project management but it is still not recognized as a process variable. Its objective should be to outperform the initially defined processes, and foresee and overcome possible undesirable events. Detailed task-level master planning is unrealistic since one cannot accurately predict all the requirements and obstacles before work has even started. The process planning methodology (PPM) has thus been developed in order to overcome common problems of the overwhelming project complexity. The essential elements of the PPM are the process planning group (PPG), including a control team that dynamically links the production/site and management, and the planning algorithm embodied within two continuous-improvement loops. The methodology was tested on a factory project in Slovenia and in four successive projects of a similar nature. In addition to a number of improvement ideas and enhanced communication, the applied PPM resulted in 32% higher total productivity, 6% total savings and created a synergistic project environment.
Resumo:
The shamba system involves farmers tending tree saplings on state-owned forest land in return for being permitted to intercrop perennial food crops until canopy closure. At one time the system was used throughout all state-owned forest lands in Kenya, accounting for a large proportion of some 160,000 ha. The system should theoretically be mutually beneficial to both local people and the government. However the system has had a chequered past in Kenya due to widespread malpractice and associated environmental degradation. It was last banned in 2003 but in early 2008 field trials were initiated for its reintroduction. This study aimed to: assess the benefits and limitations of the shamba system in Kenya; assess the main influences on the extent to which the limitations and benefits are realised and; consider the management and policy requirements for the system's successful and sustainable operation. Information was obtained from 133 questionnaires using mainly open ended questions and six participatory workshops carried out in forest-adjacent communities on the western slopes of Mount Kenya in Nyeri district. In addition interviews were conducted with key informants from communities and organisations. There was strong desire amongst local people for the system's reintroduction given that it had provided significant food, income and employment. Local perceptions of the failings of the system included firstly mismanagement by government or forest authorities and secondly abuse of the system by shamba farmers and outsiders. Improvements local people considered necessary for the shamba system to work included more accountability and transparency in administration and better rules with respect to plot allocation and stewardship. Ninety-seven percent of respondents said they would like to be more involved in management of the forest and 80% that they were willing to pay for the use of a plot. The study concludes that the structural framework laid down by the 2005 Forests Act, which includes provision for the reimplementation of the shamba system under the new plantation establishment and livelihood improvement scheme (PELIS) [It should be noted that whilst the shamba system was re-branded in 2008 under the acronym PELIS, for the sake of simplicity the authors continue to refer to the 'shamba system' and 'shamba farmers' throughout this paper.], is weakened because insufficient power is likely to be devolved to local people, casting them merely as 'forest users' and the shamba system as a 'forest user right'. In so doing the system's potential to both facilitate and embody the participation of local people in forest management is limited and the long-term sustainability of the new system is questionable. Suggested instruments to address this include some degree of sharing of profits from forest timber, performance related guarantees for farmers to gain a new plot and use of joint committees consisting of local people and the forest authorities for long term management of forests.