26 resultados para Distribution system planning

em CentAUR: Central Archive University of Reading - UK


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper approaches the question of why entrepreneurial firms exist from a broad business historical perspective. It observes that the original development of the modern business enterprise was very strongly associated with entrepreneurial innovation rather than an extension of managerial routine. The widely-used theory of the entrepreneur as a specialist in judgmental decision making is applied to the particular point in time when entrepreneurs had to develop novel organizational designs in what Chandler described as the prelude to the ‘managerial revolution’. The paper illustrates how the theory of entrepreneurship then best explains the rise of the modern corporation by focusing on the case study of vertical integration par excellence, Singer.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study attempts to fill the existing gap in the simulation of variable flow distribution systems through developing new pressure governing components. These components are able to capture the actual ever-changing system performance curve in variable flow distribution systems together with the prediction of controversial issues such as starving, over-flow and the lack of controllability on the flow rate of different branches in a hydronic system. The performance of the proposed components is verified using a case study under design and off-design circumstances. Full integration of the new components within the TRNSYS simulation package is another advantage of this study, which makes it more applicable for designers in both the design and commissioning of hydronic systems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The use of expert system techniques in power distribution system design is examined. The selection and siting of equipment on overhead line networks is chosen for investigation as the use of equipment such as auto-reclosers, etc., represents a substantial investment and has a significant effect on the reliability of the system. Through past experience with both equipment and network operations, most decisions in selection and siting of this equipment are made intuitively, following certain general guidelines or rules of thumb. This heuristic nature of the problem lends itself to solution using an expert system approach. A prototype has been developed and is currently under evaluation in the industry. Results so far have demonstrated both the feasibility and benefits of the expert system as a design aid.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The next couple of years will see the need for replacement of a large amount of life-expired switchgear on the UK 11 kV distribution system. Latest technology and alternative equipment have made the choice of replacement a complex task. The authors present an expert system as an aid to the decision process for the design of the 11 kV power distribution network.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper compares the development of the poultry industry in Italy with the UK. Earlier research has suggested that the UK poultry industry developed a symbiotic relationship with the emerging supermarket retailers. Italy had a retarded supermarket sector. Its distribution system favoured small-scale, independent butchers rather than chains of self-service supermarkets. Despite this the Italian poultry industry also modernised, adopting US technologies. The catalyst for this modernisation was technological innovation in refrigeration technologies that enabled Italian consumers and independent retailers to be persuaded of the merits of the new ‘technological’ chicken. While the Italian market has become dominated by AIA and Amadori in recent years, the key innovators were the entrepreneurs that created the company called Arena.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Planning a project with proper considerations of all necessary factors and managing a project to ensure its successful implementation will face a lot of challenges. Initial stage in planning a project for bidding a project is costly, time consuming and usually with poor accuracy on cost and effort predictions. On the other hand, detailed information for previous projects may be buried in piles of archived documents which can be increasingly difficult to learn from the previous experiences. Project portfolio has been brought into this field aiming to improve the information sharing and management among different projects. However, the amount of information that could be shared is still limited to generic information. This paper, we report a recently developed software system COBRA to automatically generate a project plan with effort estimation of time and cost based on data collected from previous completed projects. To maximise the data sharing and management among different projects, we proposed a method of using product based planning from PRINCE2 methodology. (Automated Project Information Sharing and Management System -�COBRA) Keywords: project management, product based planning, best practice, PRINCE2

Relevância:

40.00% 40.00%

Publicador:

Resumo:

To ensure minimum loss of system security and revenue it is essential that faults on underground cable systems be located and repaired rapidly. Currently in the UK, the impulse current method is used to prelocate faults, prior to using acoustic methods to pinpoint the fault location. The impulse current method is heavily dependent on the engineer's knowledge and experience in recognising/interpreting the transient waveforms produced by the fault. The development of a prototype real-time expert system aid for the prelocation of cable faults is described. Results from the prototype demonstrate the feasibility and benefits of the expert system as an aid for the diagnosis and location of faults on underground cable systems.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The aim of this paper is to critically examine the application of development appraisal to viability assessment in the planning system. This evaluation is of development appraisal models in general and also their use in particular applications associated with estimating planning obligation capacity. The paper is organised into four themes: · The context and conceptual basis for development viability appraisal · A review of development viability appraisal methods · A discussion of selected key inputs into a development viability appraisal · A discussion of the applications of development viability appraisals in the planning system It is assumed that readers are familiar with the basic models and information needs of development viability appraisal rather than at the cutting edge of practice and/or academe

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The British system of development control is time-consuming and uncertain in outcome. Moreover, it is becoming increasingly overloaded as it has gradually switched away from being centred on a traditional ‘is it an appropriate land-use?’ type approach to one based on multi-faceted inspections of projects and negotiations over the distribution of the potential financial gains arising from them. Recent policy developments have centred on improving the operation of development control. This paper argues that more fundamental issues may be a stake as well. Important market changes have increased workloads. Furthermore, the UK planning system's institutional framework encourages change to move in specific directions, which is not always helpful. If expectations of increased long-term housing supply are to be met more substantial changes to development control may be essential but hard to achieve.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper explores the relationship between political ideology and planning in Britain and Sweden, with particular emphasis on the by-passing of the planning system. The prevailing ideology in each country over the last ten years is outlined and the impact on planning identified. The argument is then given in greater depth through case studies of two major projects. For Britain, this involves setting out the main features of Thatcherism and the way that this has changed the purposes underlying planning and created a diversified planning system. This is followed by a case study of Canary Wharf. For Sweden, the consensus culture and the emphasis on participation and decentralisation are discussed. The new planning legislation of 1987 is outlined. These aspects are then contrasted with the fiscal crisis and the development of 'negotiation planning'. These themes are illustrated by a case study of the Globe in Stockholm.