21 resultados para Delay-Time
em CentAUR: Central Archive University of Reading - UK
Resumo:
In this paper, we present an on-line estimation algorithm for an uncertain time delay in a continuous system based on the observational input-output data, subject to observational noise. The first order Pade approximation is used to approximate the time delay. At each time step, the algorithm combines the well known Kalman filter algorithm and the recursive instrumental variable least squares (RIVLS) algorithm in cascade form. The instrumental variable least squares algorithm is used in order to achieve the consistency of the delay parameter estimate, since an error-in-the-variable model is involved. An illustrative example is utilized to demonstrate the efficacy of the proposed approach.
Resumo:
In 1967 a novel scheme was proposed for controlling processes with large pure time delay (Fellgett et al, 1967) and some of the constituent parts of the scheme were investigated (Swann, 1970; Atkinson et al, 1973). At that time the available computational facilities were inadequate for the scheme to be implemented practically, but with the advent of modern microcomputers the scheme becomes feasible. This paper describes recent work (Mitchell, 1987) in implementing the scheme in a new multi-microprocessor configuration and shows the improved performance it provides compared with conventional three-term controllers.
Resumo:
Presents a method for model based bilateral control of master-slave arm with time delay between master and slave arms, where the system supports cooperative action between manual and automatic modes. The method realises efficiencies in master-slave arm control with the simplicities of a computer and the flexibility of a skilled human operator.
Resumo:
Time to flowering and maturity is an important adaptive feature in annual crops, including cowpeas (Vigna unguiculata (L.) Walp.). In West and Central Africa, photoperiod is the most important environmental variable affecting time to flowering in cowpea. The inheritance of time from sowing to flowering (f) in cowpeas was studied by crossing a photoperiod-sensitive genotype Kanannnado to a photoperiod-insensitive variety IT97D-941-1. Sufficient seed of F-1, F-2, F-3 and backcross populations were generated. The parental, F-1, F-2, F-3 and the backcross populations were screened for f under long natural days (mean daylength 13.4 h per day) in the field and the parents, F-1, F-2 and backcross populations under short day (10 h per day) conditions. The result of the screening showed that photoperiod in the field was long enough to delay flowering of photoperiod-sensitive genotypes. Photoperiod-sensitivity was found to be partially dominant to insensitivity. Frequency distribution of the trait in the various populations indicated quantitative inheritance. Additive (d) and additive x dominance (j) interactions were the most important gene actions conditioning time to flowering. A narrow sense heritability of 86% was estimated for this trait. This will result in 26 days gain in time to flowering with 5% selection intensity from the F-2 to F-3 generation. At least seven major gene pairs, with an average delay of 6 days each, were estimated to control time to flowering in this cross.
Resumo:
Motivated by a matched case-control study to investigate potential risk factors for meningococcal disease amongst adolescents, we consider the analysis of matched case-control studies where disease incidence, and possibly other risk factors, vary with time of year. For the cases, the time of infection may be recorded. For controls, however, the recorded time is simply the time of data collection, which is shortly after the time of infection for the matched case, and so depends on the latter. We show that the effect of risk factors and interactions may be adjusted for the time of year effect in a standard conditional logistic regression analysis without introducing any bias. We also show that, if the time delay between data collection for cases and controls is constant, provided this delay is not very short, estimates of the time of year effect are approximately unbiased. In the case that the length of the delay varies over time, the estimate of the time of year effect is biased. We obtain an approximate expression for the degree of bias in this case. Copyright © 2004 John Wiley & Sons, Ltd.
Resumo:
The present study examined the effects of a pre-movement delay on the kinematics of prehension in middle childhood. Twenty-five children between the ages of 5 and 11 years made visually open-loop reaches to two different sized objects at two different distances along the midline. Reaches took place either (i) immediately, or (ii) 2 s after the occlusion of the stimulus. In all age groups, reaches following the pre-movement delay were characterised by longer movement durations, lower peak velocities, larger peak grip apertures and longer time spent in the final slow phase of the movement. This pattern of results suggests that the representations that control the transport and grasp component are affected similarly by delay, and is consistent with the results previously reported for adults. Such representations therefore appear to develop before the age of 5. (C) 2004 Elsevier B.V. All rights reserved.
Resumo:
This paper analyzes the delay performance of Enhanced relay-enabled Distributed Coordination Function (ErDCF) for wireless ad hoc networks under ideal condition and in the presence of transmission errors. Relays are nodes capable of supporting high data rates for other low data rate nodes. In ideal channel ErDCF achieves higher throughput and reduced energy consumption compared to IEEE 802.11 Distributed Coordination Function (DCF). This gain is still maintained in the presence of errors. It is also expected of relays to reduce the delay. However, the impact on the delay behavior of ErDCF under transmission errors is not known. In this work, we have presented the impact of transmission errors on delay. It turns out that under transmission errors of sufficient magnitude to increase dropped packets, packet delay is reduced. This is due to increase in the probability of failure. As a result the packet drop time increases, thus reflecting the throughput degradation.
Resumo:
A quasi-optical de-embedding technique for characterizing waveguides is demonstrated using wideband time-resolved terahertz spectroscopy. A transfer function representation is adopted for the description of the signal in the input and output port of the waveguides. The time domain responses were discretised and the waveguide transfer function was obtained through a parametric approach in the z-domain after describing the system with an ARX as well as with a state space model. Prior to the identification procedure, filtering was performed in the wavelet domain to minimize signal distortion and the noise propagating in the ARX and subspace models. The model identification procedure requires isolation of the phase delay in the structure and therefore the time-domain signatures must be firstly aligned with respect to each other before they are compared. An initial estimate of the number of propagating modes was provided by comparing the measured phase delay in the structure with theoretical calculations that take into account the physical dimensions of the waveguide. Models derived from measurements of THz transients in a precision WR-8 waveguide adjustable short will be presented.
Resumo:
The time taken to consider development proposals within the English planning system continues to provoke great policy concern despite a decade of inquiry and policy change. The results of an extensive site-based survey and hedonic modelling exercise across 45 local authorities are reported here. The analysis reveals a slow, uncertain system. It identifies planning delay as a serious problem for housing supply and its ability to respond to increases in demand. Only a relatively limited set of factors seem relevant in explaining differences in times and the results suggest that 80% of councils’ performances are statistically indistinguishable from each other. These findings question the policy emphasis put on rankings of local authorities, though some influence from local politics is apparent. Development control is consistently a lengthy and uncertain process due to its complexity. Therefore, success in lowering planning delay is only likely through radical simplification.
Resumo:
The British system of development control is time-consuming and uncertain in outcome. Moreover, it is becoming increasingly overloaded as it has gradually switched away from being centred on a traditional ‘is it an appropriate land-use?’ type approach to one based on multi-faceted inspections of projects and negotiations over the distribution of the potential financial gains arising from them. Recent policy developments have centred on improving the operation of development control. This paper argues that more fundamental issues may be a stake as well. Important market changes have increased workloads. Furthermore, the UK planning system's institutional framework encourages change to move in specific directions, which is not always helpful. If expectations of increased long-term housing supply are to be met more substantial changes to development control may be essential but hard to achieve.
Resumo:
There is growing international interest in the impact of regulatory controls on the supply of housing The UK has a particularly restrictive planning regime and a detailed and uncertain process of development control linked to it. This paper presents the findings of empirical research on the time taken to gain planning permission for selected recent major housing projects from a sample of local authorities in southern England. The scale of delay found was far greater than is indicated by average official data measuring the extent to which local authorities meet planning delay targets. If these results are representative of the country as a whole, they indicate that planning delay could be a major cause of the slow responsiveness of British housing supply.
Resumo:
In this paper we describe how to cope with the delays inherent in a real time control system for a steerable stereo head/eye platform. A purposive and reactive system requires the use of fast vision algorithms to provide the controller with the error signals to drive the platform. The time-critical implementation of these algorithms is necessary, not only to enable short latency reaction to real world events, but also to provide sufficiently high frequency results with small enough delays that controller remain stable. However, even with precise knowledge of that delay, nonlinearities in the plant make modelling of that plant impossible, thus precluding the use of a Smith Regulator. Moreover, the major delay in the system is in the feedback (image capture and vision processing) rather than feed forward (controller) loop. Delays ranging between 40msecs and 80msecs are common for the simple 2D processes, but might extend to several hundred milliseconds for more sophisticated 3D processes. The strategy presented gives precise control over the gaze direction of the cameras despite the lack of a priori knowledge of the delays involved. The resulting controller is shown to have a similar structure to the Smith Regulator, but with essential modifications.
Resumo:
Dynamic multi-user interactions in a single networked virtual environment suffer from abrupt state transition problems due to communication delays arising from network latency--an action by one user only becoming apparent to another user after the communication delay. This results in a temporal suspension of the environment for the duration of the delay--the virtual world `hangs'--followed by an abrupt jump to make up for the time lost due to the delay so that the current state of the virtual world is displayed. These discontinuities appear unnatural and disconcerting to the users. This paper proposes a novel method of warping times associated with users to ensure that each user views a continuous version of the virtual world, such that no hangs or jumps occur despite other user interactions. Objects passed between users within the environment are parameterized, not by real time, but by a virtual local time, generated by continuously warping real time. This virtual time periodically realigns itself with real time as the virtual environment evolves. The concept of a local user dynamically warping the local time is also introduced. As a result, the users are shielded from viewing discontinuities within their virtual worlds, consequently enhancing the realism of the virtual environment.
Resumo:
There is growing international interest in the impact of regulatory controls on the supply of housing. Most research focuses on the supply impacts of prescribed limits on land use but housing supply may also be affected by the process of planning monitoring and approval but this is hard to measure in detail. The UK has a particularly restrictive planning regime and a detailed and uncertain process of development control linked to it, but does offer the opportunity of detailed site-based investigation of planning delay. This paper presents the findings of empirical research on the time taken to gain planning permission for selected recent major housing projects in southern England. The scale of delay found was far greater than is indicated by average official data measuring the extent to which local authorities meet planning delay targets. Hedonic modelling indicated that there is considerable variation in the time it takes local authorities to process planning applications. Housing association developments are processed more quickly than those of large developers and small sites appear to be particularly time-intensive. These results suggest that delays in development control may be a significant contributory factor to the low responsiveness of UK housing supply to upturns in market activity.