22 resultados para Critical factors
em CentAUR: Central Archive University of Reading - UK
Resumo:
Successful knowledge transfer is an important process which requires continuous improvement in today’s knowledge-intensive economy. However, improving knowledge transfer processes represents a challenge for construction practitioners due to the complexity of knowledge acquisition, codification and sharing. Although knowledge transfer is context based, understanding the critical success factors can lead to improvements in the transfer process. This paper seeks to identify and evaluate the most significant critical factors for improving knowledge transfer processes in Public Private Partnerships/Private Finance Initiatives (PPP/PFI) projects. Drawing upon a questionnaire survey of 52 construction firms located in the UK, data is analysed using Severity Index (SI) and Coefficient of Variation (COV), to examine and identify these factors in PPP/PFI schemes. The findings suggest that a supportive leadership, participation/commitment from the relevant parties, and good communication between the relevant parties are crucial to improving knowledge transfer processes in PFI schemes. Practitioners, managers and researchers can use the findings to efficiently design performance measures for analysing and improving knowledge transfer processes.
Resumo:
Purpose – This paper seeks to summarise the main research findings from a detailed, qualitative set of structured interviews and case studies of Real Estate Partnership (REP) schemes in the UK, which involve the construction of built facilities. The research, which was funded by the Foundation for the Built Environment, examines the evolution of REPs in the UK and in Europe. The paper also aims to analyse best practice, critical factors for success, and lessons for the future. Design/methodology/approach – The research in this paper is based around ten semi-structured interviews conducted with senior representatives from corporate occupiers, property consultants, legal practices and REP service providers. Findings – The research in the paper demonstrates that REPs are particularly suited to the UK, where lease lengths are relatively long, and the level of corporate real estate owner-occupation is often higher than elsewhere. It also shows that further research is needed to examine the future shape and form of the UK REP market. Research limitations/implications – The paper is based on a limited number of in-depth case study interviews. The paper shows that further research is needed to find better ways to examine REPs empirically. Practical implications – The paper is important in highlighting a number of main issues in developing REPs: identifying with occupier's objectives; risk transfer and size of contract; and developing appropriate innovation and skills. Originality/value – The paper examines the drivers, barriers and critical success factors (at strategic and operational levels) for REPs in the UK in detail and will be of value to property managers, facilities managers, investors, financiers, and others involved in the REP process.
Resumo:
Purpose – This paper summarises the main research findings from a detailed, qualitative set of structured interviews and case studies of private finance initiative (PFI) schemes in the UK, which involve the construction of built facilities. The research, which was funded by the Foundation for the Built Environment, examines the emergence of PFI in the UK. Benefits and problems in the PFI process are investigated. Best practice, the key critical factors for success, and lessons for the future are also analysed. Design/methodology/approach – The research is based around 11 semi-structured interviews conducted with stakeholders in key PFI projects in the UK. Findings – The research demonstrates that value for money and risk transfer are key success criteria. High procurement and transaction costs are a feature of PFI projects, and the large-scale nature of PFI projects frequently acts as barrier to entry. Research limitations/implications – The research is based on a limited number of in-depth case study interviews. The paper also shows that further research is needed to find better ways to measure these concepts empirically. Practical implications – The paper is important in highlighting four main areas of practical improvement in the PFI process: value for money assessment; establishing end-user needs; developing competitive markets and developing appropriate skills in the public sector. Originality/value – The paper examines the drivers, barriers and critical success factors for PFI in the UK for the first time in detail and will be of value to property investors, financiers, and others involved in the PFI process.
Resumo:
In today's global economic conditions, improving the productivity of the construction industry is becoming more pressing than ever. Several factors impact the efficiency of construction operatives, but motivation is among the most important. Since low productivity is one of the significant challenges facing the construction industry in the State of Kuwait, the objective of this case study is to identify, explore, and rank the relative importance of the factors perceived to impact the motivational level of master craftsmen involved in primary construction trades. To achieve this objective, a structured questionnaire survey comprising 23 factors, which were shortlisted based on relevant previous research on motivation, the input of local industry experts, and numerous interviews with skilled operatives, was distributed to a large number of master craftsmen. Using the “Relative Importance Index” technique, the following prominent factors are identified: (1) payment delay; (2) rework; (3) lack of a financial incentive scheme; (4) the extent of change orders during execution; (5) incompetent supervisors; (6) delays in responding to Requests For Information (RFI); (7) overcrowding and operatives interface; (8) unrealistic scheduling and performance expectation; (9) shortage of materials on site; and (10) drawings quality level. The findings can be used to provide industry practitioners with guidance for focusing, acting upon, and controlling the critical factors influencing the performance of master craftsmen, hence, assist in achieving an efficient utilization of the workforce, and a reasonable level of competitiveness and cost effective operation.
Resumo:
Although the construction pollution index has been put forward and proved to be an efficient approach to reducing or mitigating pollution level during the construction planning stage, the problem of how to select the best construction plan based on distinguishing the degree of its potential adverse environmental impacts is still a research task. This paper first reviews environmental issues and their characteristics in construction, which are critical factors in evaluating potential adverse impacts of a construction plan. These environmental characteristics are then used to structure two decision models for environmental-conscious construction planning by using an analytic network process (ANP), including a complicated model and a simplified model. The two ANP models are combined and called the EnvironalPlanning system, which is applied to evaluate potential adverse environmental impacts of alternative construction plans.
Resumo:
By employing Moody’s corporate default and rating transition data spanning the last 90 years we explore how much capital banks should hold against their corporate loan portfolios to withstand historical stress scenarios. Specifically, we will focus on the worst case scenario over the observation period, the Great Depression. We find that migration risk and the length of the investment horizon are critical factors when determining bank capital needs in a crisis. We show that capital may need to rise more than three times when the horizon is increased from 1 year, as required by current and future regulation, to 3 years. Increases are still important but of a lower magnitude when migration risk is introduced in the analysis. Further, we find that the new bank capital requirements under the so-called Basel 3 agreement would enable banks to absorb Great Depression-style losses. But, such losses would dent regulatory capital considerably and far beyond the capital buffers that have been proposed to ensure that banks survive crisis periods without government support.
Resumo:
Background Factors related to parents and parenting capacities are important predictors of the development of behavioural problems in children. Recently, there has been an increasing research focus in this field on the earliest years of life, however, relatively few studies have addressed the role of fathers, despite this appearing to be particularly pertinent to child behavioural development. This study aimed to examine whether father–infant interactions at age 3 months independently predicted child behavioural problems at 1 year of age. Method A sample of 192 families was recruited from two maternity units in the United Kingdom. Father–infant interactions were assessed in the family home and coded using the Global Rating Scales. Child behaviour problems were assessed by maternal report. Hierarchical and logistic regression analyses were used to examine associations between father–infant interaction and the development of behavioural problems. Results Disengaged and remote interactions between fathers and their infants were found to predict externalising behavioural problems at the age of 1 year. The children of the most disengaged fathers had an increased risk of developing early externalising behavioural problems [disengaged (nonintrusive) interactions – adjusted Odds Ratio 5.33 (95% Confidence Interval; 1.39, 20.40): remote interactions adj. OR 3.32 (0.92, 12.05)] Conclusions Disengaged interactions of fathers with their infants, as early as the third month of life, predict early behavioural problems in children. These interactions may be critical factors to address, from a very early age in the child’s life, and offer a potential opportunity for preventive intervention.
Resumo:
Gaining or maintaining a “contractor's” competitive advantage is not easy as it is determined by a large number of factors. Identification of critical success factors (CSFs) allows one to reduce the vast number of factors to some manageable few but vital ones. Based on the CSFs, contractors' limited resources such as money and manpower can be allocated and aligned appropriately for yielding a maximum outcome of overall competitiveness. This paper describes the CSFs identified from a survey study carried out in Mainland China. The ranking analysis of the survey results shows that 35 factors are rated as critical for determining the competitiveness of a contractor. Factor analysis reveals that the 35 CSFs identified can be grouped into eight clusters, namely, project management skills, organization structure, resources, competitive strategy, relationships, bidding, marketing, and technology. The CSFs in this study provide a vehicle for guiding a contractor in managing its resources in order to improve competitive advantage. The study also provides insights into the management of competitiveness for contractors that are operating in the particular context of the Chinese construction industry.
Resumo:
Hardcore, or long-term derelict and vacant brownfield sites which are often contaminated, form a significant proportion of brownfield land in many cities, not only in the UK but also in other countries. The recent economic recession has placed the economic viability of such sites in jeopardy. This paper compares the approaches for bringing back hardcore brownfield sites into use in England and Japan by focusing on ten case studies in Manchester and Osaka, using an `agency'-based frame- work. The findings are set in the context of (i) national brownfield and related policy agendas; (ii) recent trends in land and property markets in both England and Japan; and (iii) city-level comparisons of brownfields in Manchester and Osaka. The research, which was conducted during 2009 ^ 10, suggests that hardcore brownfield sites have been badly affected by the recent recession in both Manchester and Osaka. Despite this, not only is there evidence that hardcore sites have been successfully regenerated in both cities, but also that the critical success factors (CSFs) operating in bringing sites back into use share a large degree of commonality. These CSFs include the presence of strong potential markets, seeing the recession as an opportunity, long-term vision, strong branding, strong partnerships, integrated development, and getting infrastructure into place. Finally, the paper outlines the policy implications of the research.
Resumo:
Bloom-forming and toxin-producing cyanobacteria remain a persistent nuisance across the world. Modelling of cyanobacteria in freshwaters is an important tool for understanding their population dynamics and predicting the location and timing of the bloom events in lakes and rivers. A new deterministic-mathematical model was developed, which simulates the growth and movement of cyanobacterial blooms in river systems. The model focuses on the mathematical description of the bloom formation, vertical migration and lateral transport of colonies within river environments by taking into account the major factors that affect the cyanobacterial bloom formation in rivers including, light, nutrients and temperature. A technique called generalised sensitivity analysis was applied to the model to identify the critical parameter uncertainties in the model and investigates the interaction between the chosen parameters of the model. The result of the analysis suggested that 8 out of 12 parameters were significant in obtaining the observed cyanobacterial behaviour in a simulation. It was found that there was a high degree of correlation between the half-saturation rate constants used in the model.