22 resultados para Credit risk pricing

em CentAUR: Central Archive University of Reading - UK


Relevância:

100.00% 100.00%

Publicador:

Resumo:

A review of current risk pricing practices in the financial, insurance and construction sectors is conducted through a comprehensive literature review. The purpose was to inform a study on risk and price in the tendering processes of contractors: specifically, how contractors take account of risk when they are calculating their bids for construction work. The reference to mainstream literature was in view of construction management research as a field of application rather than a fundamental academic discipline. Analytical models are used for risk pricing in the financial sector. Certain mathematical laws and principles of insurance are used to price risk in the insurance sector. construction contractors and practitioners are described to traditionally price allowances for project risk using mechanisms such as intuition and experience. Project risk analysis models have proliferated in recent years. However, they are rarely used because of problems practitioners face when confronted with them. A discussion of practices across the three sectors shows that the construction industry does not approach risk according to the sophisticated mechanisms of the two other sectors. This is not a poor situation in itself. However, knowledge transfer from finance and insurance can help construction practitioners. But also, formal risk models for contractors should be informed by the commercial exigencies and unique characteristics of the construction sector.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

By employing Moody’s corporate default and rating transition data spanning the last 90 years we explore how much capital banks should hold against their corporate loan portfolios to withstand historical stress scenarios. Specifically, we will focus on the worst case scenario over the observation period, the Great Depression. We find that migration risk and the length of the investment horizon are critical factors when determining bank capital needs in a crisis. We show that capital may need to rise more than three times when the horizon is increased from 1 year, as required by current and future regulation, to 3 years. Increases are still important but of a lower magnitude when migration risk is introduced in the analysis. Further, we find that the new bank capital requirements under the so-called Basel 3 agreement would enable banks to absorb Great Depression-style losses. But, such losses would dent regulatory capital considerably and far beyond the capital buffers that have been proposed to ensure that banks survive crisis periods without government support.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Covered bonds are a promising alternative for prime mortgage securitization. In this paper, we explore risk premia in the covered bond market and particularly investigate whether and how credit risk is priced. In extant literature, yield spreads between high-quality covered bonds and government bonds are often interpreted as pure liquidity premia. In contrast, we show that although liquidity is important, it is not the exclusive risk factor. Using a hand-collected data set of cover pool information, we find that the credit quality of the cover assets is an important determinant of covered bond yield spreads. This effect is particularly strong in times of financial turmoil and has a significant influence on the issuer's refinancing cost.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The process of how contractors take account of risk when calculating their bids for construction work is investigated based on preliminary investigations and case studies in Ghana and UK. Ghana and UK were chosen, more or less arbitrarily, for the purpose of case studies, and to test the idea that there are systematic differences between the approaches in different places. Clear differences were found in the risk pricing approaches of contractors in the two countries. The difference appeared to emanate from the professional knowledge and competence of the bid team members, company policy, corporate accountability and the business environments in which the contractors operate. Both groups of contractors take account of risk in estimates. However, risk accountability was found to be higher on the agenda in the tender process of UK contractors, documented more systematically, and assessed and managed more rigorously with input from the whole bid team. Risk accountability takes place at three levels of the tender process and is dictated strongly by market forces and company circumstances.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper investigates the role of credit and liquidity factors in explaining corporate CDS price changes during normal and crisis periods. We find that liquidity risk is more important than firm-specific credit risk regardless of market conditions. Moreover, in the period prior to the recent “Great Recession” credit risk plays no role in explaining CDS price changes. The dominance of liquidity effects casts serious doubts on the relevance of CDS price changes as an indicator of default risk dynamics. Our results show how multiple liquidity factors including firm specific and aggregate liquidity proxies as well as an asymmetric information measure are critical determinants of CDS price variations. In particular, the impact of informed traders on the CDS price increases when markets are characterised by higher uncertainty, which supports concerns of insider trading during the crisis.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In this paper we investigate the price discovery process in single-name credit spreads obtained from bond, credit default swap (CDS), equity and equity option prices. We analyse short term price discovery by modelling daily changes in credit spreads in the four markets with a vector autoregressive model (VAR). We also look at price discovery in the long run with a vector error correction model (VECM). We find that in the short term the option market clearly leads the other markets in the sub-prime crisis (2007-2009). During the less severe sovereign debt crisis (2009-2012) and the pre-crisis period, options are still important but CDSs become more prominent. In the long run, deviations from the equilibrium relationship with the option market still lead to adjustments in the credit spreads observed or implied from other markets. However, options no longer dominate price discovery in any of the periods considered. Our findings have implications for traders, credit risk managers and financial regulators.

Relevância:

80.00% 80.00%

Publicador:

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper focuses on the effect of energy performance ratings on the capital values, rental values and equivalent yields of UK commercial property assets. Of which a small number are also BREEAM rated, the study is based upon 708 commercial property assets held in the IPD UK Universe drawn from across all PAS segments. Incorporating a range of controls such as unexpired lease term, vacancy rate and tenant credit risk, hedonic regression procedures are used to estimate the effect of EPC rating. The study finds no evidence of a strong relationship between environmental and/or energy performance and rental and capital value. Bearing in mind the small number of BREEAM rated assets, there was a small but statistically significant effect on equivalent yield only. Similarly, there was no evidence that the EPC rating had any effect on Market Rent or Market Value with only minor effects of EPC ratings on equivalent yields. The preliminary conclusion is that energy labelling is not yet having the effects on Market Values and Market Rents that provide incentives for market participants to improve the energy efficiency of their commercial real estate assets.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Understanding the performance of banks is of the utmost importance due to the impact the sector may have on economic growth and financial stability. Residential mortgage loans constitute a large proportion of the portfolio of many banks and are one of the key assets in the determination of their performance. Using a dynamic panel model, we analyse the impact of residential mortgage loans on bank profitability and risk, based on a sample of 555 banks in the European Union (EU-15), over the period from 1995 to 2008. We find that an increase in residential mortgage loans seems to improve bank’s performance in terms of both profitability and credit risk in good market, pre-financial crisis, conditions. These findings may aid in explaining why banks rush to lend to property during booms because of the positive effect it has on performance. The results also show that credit risk and profitability are lower during the upturn in the residential property cycle.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Formal and analytical risk models prescribe how risk should be incorporated in construction bids. However, the actual process of how contractors and their clients negotiate and agree on price is complex, and not clearly articulated in the literature. Using participant observation, the entire tender process was shadowed in two leading UK construction firms. This was compared to propositions in analytical models and significant differences were found. 670 hours of work observed in both firms revealed three stages of the bidding process. Bidding activities were categorized and their extent estimated as deskwork (32%), calculations (19%), meetings (14%), documents (13%), off-days (11%), conversations (7%), correspondence (3%) and travel (1%). Risk allowances of 1-2% were priced in some bids and three tiers of risk apportionment in bids were identified. However, priced risks may sometimes be excluded from the final bidding price to enhance competitiveness. Thus, although risk apportionment affects a contractor’s pricing strategy, other complex, microeconomic factors also affect price. Instead of pricing in contingencies, risk was priced mostly through contractual rather than price mechanisms, to reflect commercial imperatives. The findings explain why some assumptions underpinning analytical models may not be sustainable in practice and why what actually happens in practice is important for those who seek to model the pricing of construction bids.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Formal and analytical models that contractors can use to assess and price project risk at the tender stage have proliferated in recent years. However, they are rarely used in practice. Introducing more models would, therefore, not necessarily help. A better understanding is needed of how contractors arrive at a bid price in practice, and how, and in what circumstances, risk apportionment actually influences pricing levels. More than 60 proposed risk models for contractors that are published in journals were examined and classified. Then exploratory interviews with five UK contractors and documentary analyses on how contractors price work generally and risk specifically were carried out to help in comparing the propositions from the literature to what contractors actually do. No comprehensive literature on the real bidding processes used in practice was found, and there is no evidence that pricing is systematic. Hence, systematic risk and pricing models for contractors may have no justifiable basis. Contractors process their bids through certain tendering gateways. They acknowledge the risk that they should price. However, the final settlement depends on a set of complex, micro-economic factors. Hence, risk accountability may be smaller than its true cost to the contractor. Risk apportionment occurs at three stages of the whole bid-pricing process. However, analytical approaches tend not to incorporate this, although they could.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

One of the aims of a broad ethnographic study into how the apportionment of risk influences pricing levels of contactors was to ascertain the significant risks affecting contractors in Ghana, and their impact on prices. To do this, in the context of contractors, the difference between expected and realized return on a project is the key dependent variable examined using documentary analyses and semi-structured interviews. Most work in this has focused on identifying and prioritising risks using relative importance indices generated from the analysis of questionnaire survey responses. However, this approach may be argued to constitute perceptions rather than direct measures of the project risk. Here, instead, project risk is investigated by examining two measures of the same quantity; one ‘before’ and one ‘after’ construction of a project has taken place. Risks events are identified by ascertaining the independent variables causing deviations between expected and actual rates of return. Risk impact is then measured by ascertaining additions or reductions to expected costs due to the occurrence of risk events. So far, data from eight substantially complete building projects indicates that consultants’ inefficiency, payment delays, subcontractor-related problems and changes in macroeconomic factors are significant risks affecting contractors in Ghana.