19 resultados para Contract for construction

em CentAUR: Central Archive University of Reading - UK


Relevância:

100.00% 100.00%

Publicador:

Resumo:

FIDIC has over the years produced standard forms of contracts for the international procurement of projects. A source of continuing criticism of its Red Book concerns the duality in the traditional role of the engineer as the employer's agent and as an independent third party holding the balance fairly between the employer and the contractor. In response to this and other criticisms FIDIC produced a replacement for it in 1999. The role of the engineer under the new Red Book is critically examined in the light of relevant case law, expert commentaries and feedback from two multidisciplinary workshops with international participation. The examination identified three major changes: (1) a duty to act impartially has been replaced by a duty to make fair determination of certain matters; (2) it is open to parties to allow greater control of the engineer by the employer by stating in the appropriate part of the contract powers the engineer must not exercise without the employer's approval; (3) there is provision for a Dispute Adjudication Board (DAB) to which disputes may be referred. Although the duality has not been eliminated completely, the contract is structured flexibly enough to support those who wish to contract on the basis of the engineer acting solely as the agent of the employer.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The number of bidders, N, involved in a construction procurement auction is known to have an important effect on the value of the lowest bid and the mark-up applied by bidders. In practice, for example, it is important for a bidder to have a good estimate of N when bidding for a current contract. One approach, instigated by Friedman in 1956, is to make such an estimate by statistical analysis and modelling. Since then, however, finding a suitable model for N has been an enduring problem for researchers and, despite intensive research activity in the subsequent 30 years, little progress has been made, due principally to the absence of new ideas and perspectives. The debate is resumed by checking old assumptions, providing new evidence relating to concomitant variables and proposing a new model. In doing this and in order to ensure universality, a novel approach is developed and tested by using a unique set of 12 construction tender databases from four continents. This shows the new model provides a significant advancement on previous versions. Several new research questions are also posed and other approaches identified for future study.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

An overview of organization in the construction industry is identified from plans of work published in the UK. This provides a basis for identifying the essential steps through which any construction project must pass. It is shown that all construction projects pass through a set of stages of work, consisting of inception, feasibility, scheme design, detail design, contract formation, construction and commissioning. Although there may be changes to the sequence and importance of these stages, their identification helps in making judgements about organizational structure on construction projects.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Recent developments in contracting practice in the UK have built upon recommendations contained in highprofile reports, such as those by Latham and Egan. However, the New Engineering Contract (NEC), endorsed by Latham, is based upon principles of contract drafting that seem open to question. Any contract operates in the context of its legislative environment and current working practices. This report identifies eight contentious hypotheses in the literature on construction contracts and tests their validity in a sample survey that attracted 190 responses. The survey shows, among other things, that while partnership is a positive and useful idea, authoritative contract management is considered more effective and that “win-win” contracts, while desirable, are basically impractical. Further, precision and fairness in contracts are not easy to achieve simultaneously. While participants should know what is in their contracts, they should not routinely resort to legal action; and standard-form contracts should not seek to be universally applicable. Fundamental changes to drafting policy should be undertaken within the context of current legal contract doctrine and with a sensitivity to the way that contracts are used in contemporary practice. Attitudes to construction contracting may seem to be changing on the surface, but detailed analysis of what lies behind apparent agreement on new ways of working reveals that attitudes are changing much more slowly than they appear to be.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Noncompetitive bids have recently become a major concern in both public and private sector construction contract auctions. Consequently, several models have been developed to help identify bidders potentially involved in collusive practices. However, most of these models require complex calculations and extensive information that is difficult to obtain. The aim of this paper is to utilize recent developments for detecting abnormal bids in capped auctions (auctions with an upper bid limit set by the auctioner) and extend them to the more conventional uncapped auctions (where no such limits are set). To accomplish this, a new method is developed for estimating the values of bid distribution supports by using the solution to what has become known as the German Tank problem. The model is then demonstrated and tested on a sample of real construction bid data, and shown to detect cover bids with high accuracy. This paper contributes to an improved understanding of abnormal bid behavior as an aid to detecting and monitoring potential collusive bid practices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Contracts are put to a wide variety of uses. Those who draft construction contracts in the UK rarely consider all of the potential uses and therefore may produce documents that are less than ideal. The various uses are considered in their theoretical background before turning to the practical difficulties often encountered in trying to fulfil such diverse aims. The question of standardisation is examined within this context. Existing standard forms of contract in the UK are found to do little to overcome these difficulties, and this encourages either a significant level of amendment to the standards or experienced clients to draft their own forms. The solution is an approach to contract drafting which is designed to offer a compromise; better standard forms, based on the lessons learned from the drafting of non-standard forms and a pooling of experience, including that of lawyers, in the drafting process. Although this paper is based upon the experience of the UK, these conclusions are relevant for contract-drafting practice in general.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The context of construction management (CM) reveals that this method of procurement is as much a management philosophy as a contract structure. It is important to consider legal and contractual issues in this context. The interplay between management and law is complex and often misunderstood. Before considering specific issues, the use of contractual remedies in business agreements is discussed. In addition, the extent to which standardising a form of contract detracts or contributes to the success of projects is also considered. The dearth of judicial decisions, and the lack of a standard form, render it difficult to be specific about legal issues. Therefore, the main discussion of legal issues is centred around a recently completed research project which involved eliciting the views of a cross-section of experienced construction management clients, consultants and trade contractors. These interviews are used as the basis for highlighting some of the most important legal points to consider when setting up CM projects. The interviews revealed that the advantage of CM is the proximity of the client to the trade contractors and the disadvantage is that it depends on a high degree of professionalism and experience; qualities which are unfortunately difficult to find in the UK construction industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Cash retention is a common means of protecting an employer from a contractor's insolvency as well as ensuring that contractors finish the work that they start. Similarly, contractors withhold part of payments due to their sub-contractors. Larger contracts tend to be subjected to smaller rates of retention. By calculating the cost of retention as an amount per year of a contract, it is shown that retention is far more expensive for firms whose work consists of short contracts. The extra cost is multiplied when the final payment is delayed, as it often is for those whose work takes place at the beginning of a project. This may explain why it is that main contractors are a lot less interested than sub-contractors in alternatives to cash retention, such as retention bonds

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This book is aimed primarily at students for whom the study of building or civil engineering contracts forms part of a construction-based course. We have had in mind the syllabus requirements for first degrees in Building, Civil Engineering, Architecture, Quantity Surveying and Building Surveying, as well as those of postgraduate courses in Construction Management and Project Management. We have also assumed that such students will already have been introduced to the general principles of English law, especially those relating to contract and tort. As a result, while aspects of those subjects that are of particular relevance to construction are dealt with here, the reader must look elsewhere for the general legal background. In producing this third edition, we have again been greatly assisted by the many helpful comments made by reviewers and users of its predecessor. Nonetheless, our basic aim is identical to that which underpinned the first edition: to provide an explanation of the fundamental principles of construction contract law, rather than a clause-by-clause analysis of any particular standard-form contract. As a result, while we draw most frequently upon JCT 98 for our illustrations of particular points, this merely reflects the pre-eminent position occupied by that particular form of contract in the UK construction industry. We conclude by repeating our previous warning as to the dangers inherent in a little learning. Neither this book, nor the courses for which it is intended, seek to produce construction lawyers. The objective is rather to enable those who are not lawyers to resolve simple construction disputes before they become litigious, and to recognize when matters require professional legal advice. It should be the aim of every construction student to understand the legal framework sufficiently that they can instruct and brief specialist lawyers, and this book is designed to help them towards that understanding.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply chain from clients to consultants, contractors, sub-contractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, based on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with tendering are highly variable, 1-15%, depending upon what precisely is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Firms form consortia in order to win contracts. Once a project has been awarded to a consortium each member then concentrates on his or her own contract with the client. Therefore, consortia are marketing devices, which present the impression of teamworking, but the production process is just as fragmented as under conventional procurement methods. In this way, the consortium forms a barrier between the client and the actual construction production process. Firms form consortia, not as a simple development of normal ways of working, but because the circumstances for specific projects make it a necessary vehicle. These circumstances include projects that are too large or too complex to undertake alone or projects that require on-going services which cannot be provided by the individual firms inhouse. It is not a preferred way of working, because participants carry extra risk in the form of liability for the actions of their partners in the consortium. The behaviour of members of consortia is determined by their relative power, based on several factors, including financial commitment and ease of replacement. The level of supply chain visibility to the public sector client and to the industry is reduced by the existence of a consortium because the consortium forms an additional obstacle between the client and the firms undertaking the actual construction work. Supply chain visibility matters to the client who otherwise loses control over the process of construction or service provision, while remaining accountable for cost overruns. To overcome this separation there is a convincing argument in favour of adopting the approach put forward in the Project Partnering Contract 2000 (PPC2000) Agreement. Members of consortia do not necessarily go on to work in the same consortia again because members need to respond flexibly to opportunities as and when they arise. Decision-making processes within consortia tend to be on an ad hoc basis. Construction risk is taken by the contractor and the construction supply chain but the reputational risk is carried by all the firms associated with a consortium. There is a wide variation in the manner that consortia are formed, determined by the individual circumstances of each project; its requirements, size and complexity, and the attitude of individual project leaders. However, there are a number of close working relationships based on generic models of consortia-like arrangements for the purpose of building production, such as the Housing Corporation Guidance Notes and the PPC2000.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new, ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply, chain from clients to consultants, contractors, subcontractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, bused on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with,with tendering are highly variable, 1-15%, depending upon what precisely, is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to focus on the Fédération Internationale des Ingénieurs-Conseils (FIDIC) White Book standard form of building contract. It tracks the changes to this contract over its four editions, and seeks to identify their underlying causes. Design/methodology/approach – The changes made to the White Book are quantified using a specific type of quantitative content analysis. The amended clauses are then examined to understand the nature of the changes made. Findings – The length of the contract increased by 34 per cent between 1990 and 2006. A large proportion of the overall increase can be attributed to the clauses dealing with “conflict of interest/corruption” and “dispute resolution”. In both instances, the FIDIC drafting committees have responded to international developments to discourage corruption, and to encourage the use of alternative dispute resolution. Between 1998 and 2006, the average length of the sentences increased slightly, raising the question of whether long sentences are easily understood by users of contracts. Research limitations/implications – Quantification of text appears to be particularly useful for the analysis of documents which are regularly updated because changes can be clearly identified and the length of sentences can be determined, leading to conclusions about the readability of the text. However, caution is needed because changes of great relevance can be made to contract clauses without actually affecting their length. Practical implications – The paper will be instructive for contract drafters and informative for users of FIDIC's White Book. Originality/value – Quantifying text has been rarely used regarding standard-form contracts in the field of construction.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose-Unplanned changes in construction projects are common and lead to disruptive effects such as project delays, cost overruns and quality deviations. Rework due to unplanned changes can cost 10-15 per cent of contract value. By managing these changes more effectively, these disruptive effects can be minimised. Previous research has approached this problem from an information-processing view. In this knowledge age, the purpose of this paper is to argue that effective change management can be brought about by better understanding the significant role of knowledge during change situations. Design/methodology/approach - Within this knowledge-based context, the question of how construction project teams manage knowledge during unplanned change in the construction phase within collaborative team settings is investigated through a selected case study sample within the UK construction industry. Findings- Case study findings conclude that different forms of knowledge are created and shared between project team members during change events which is very much socially constructed and centred on tacit knowledge and experience of project personnel. Originality/value- Building on the case study findings the paper finally offers a model that represents the role of knowledge during managing project change.