287 resultados para Construction site management
em CentAUR: Central Archive University of Reading - UK
The management of site management training: The national construction college site management course
Resumo:
Genetic algorithms (GAs) have been introduced into site layout planning as reported in a number of studies. In these studies, the objective functions were defined so as to employ the GAs in searching for the optimal site layout. However, few studies have been carried out to investigate the actual closeness of relationships between site facilities; it is these relationships that ultimately govern the site layout. This study has determined that the underlying factors of site layout planning for medium-size projects include work flow, personnel flow, safety and environment, and personal preferences. By finding the weightings on these factors and the corresponding closeness indices between each facility, a closeness relationship has been deduced. Two contemporary mathematical approaches - fuzzy logic theory and an entropy measure - were adopted in finding these results in order to minimize the uncertainty and vagueness of the collected data and improve the quality of the information. GAs were then applied to searching for the optimal site layout in a medium-size government project using the GeneHunter software. The objective function involved minimizing the total travel distance. An optimal layout was obtained within a short time. This reveals that the application of GA to site layout planning is highly promising and efficient.
Resumo:
How does the work of designers impact on the safety of operatives at the construction site? Safety research and policy emphasize the importance of designing for safe construction, yet the interface between design and construction is poorly understood: accidents have multiple causes making it hard to establish causal links between design choices and safety outcomes. An in-depth case study of a major station project examines how professionals on the construction site perceive and manage the safety challenges of a building design. Analyses reveal understandings that, on the project studied, design has an impact on safety because of: (1) the timing of design work, where the volume of late design changes increased the difficulty of planning safe procedures, e.g. for working at height, lifting heavy items, refurbishing and demolishing old buildings; and (2) inputs from design stakeholders with insufficient practical knowledge of construction and operation required unplanned work-arounds, e.g. to coordinate different sub-systems, provide maintenance access, and manage loads during construction. These findings suggest that safety suffers where projects are under-designed, and that alongside regulation, there is a need for robust management attention to the contractual structures, incentives, processes and tools that enable clients and designers to understand material practices of construction and operation.
Resumo:
Patterns of communication and behaviour emerge within a construction project in response to a construction crisis. This paper investigates, within a grounded theory framework, the nature of these patterns, the sociological and psychological forces which shape them and their relationship with crisis management efficiency. A grounded theory is presented in four parts. The first part conceives a construction crisis as a period of social instability, arising from conflicting interest groups, seeking to exercise power in the pursuit of social structures which suit their political and economic interests. The second part sees a construction crisis as a de-sensitizing phenomenon which results in a period of behavioural instability and conflict which is self-perpetuating. The third part cites social structure as an important influence upon construction crisis management efficiency, in determining the efficiency of information flow, and the level of uncertainty between those affected. The fourth part points to the in-built defence mechanisms which construction crises have and to three managerial ironies which make construction crisis management difficult.
Resumo:
Managing a construction project supply chain effectively and efficiently is extremely difficult due to involvement of numerous sectors that are supported by ineffective communication system. An efficient construction supply chain system ensures the delivery of materials and other services to construction site while minimising costs and rewarding all sectors based on value added to the supply chain. The advancement of information, communication and wireless technologies is driving construction companies to deploy supply chain management strategies to seek better outputs. As part of the emerging wireless technologies, contextaware computing capability represents the next generation of ICT to the construction services. Conceptually, context-awareness could be integrated with Web Services in order to ensure the delivery of pertinent information to construction site and enhance construction supply chain collaboration. An initial study has indicated that this integrated system has the potential of serving and improving the construction services delivery through access to context-specific data, information and services on as-needed basis.
Resumo:
The construction industry has incurred a considerable amount of waste as a result of poor logistics supply chain network management. Therefore, managing logistics in the construction industry is critical. An effective logistic system ensures delivery of the right products and services to the right players at the right time while minimising costs and rewarding all sectors based on value added to the supply chain. This paper reports on an on-going research study on the concept of context-aware services delivery in the construction project supply chain logistics. As part of the emerging wireless technologies, an Intelligent Wireless Web (IWW) using context-aware computing capability represents the next generation ICT application to construction-logistics management. This intelligent system has the potential of serving and improving the construction logistics through access to context-specific data, information and services. Existing mobile communication deployments in the construction industry rely on static modes of information delivery and do not take into account the worker’s changing context and dynamic project conditions. The major problems in these applications are lack of context-specificity in the distribution of information, services and other project resources, and lack of cohesion with the existing desktop based ICT infrastructure. The research works focus on identifying the context dimension such as user context, environmental context and project context, selection of technologies to capture context-parameters such wireless sensors and RFID, selection of supporting technologies such as wireless communication, Semantic Web, Web Services, agents, etc. The process of integration of Context-Aware Computing and Web-Services to facilitate the creation of intelligent collaboration environment for managing construction logistics will take into account all the necessary critical parameters such as storage, transportation, distribution, assembly, etc. within off and on-site project.
Resumo:
From its roots in strategic management theory, stakeholder management has been adopted by the construction management academic community and applied as a valid paradigm around which research work has been generated aiming to improve project effi ciencies and effectiveness. However, academics have argued that stakeholder management should move away from purely theoretical discussions and engage more with the realities of construction project work. This paper re-appraises the stakeholder management concept for the construction domain by re-thinking some of the fundamental principles and ideals present within the more general stakeholder theory literature. It engages with issues which researchers have arguably failed to acknowledge and calls for a re-evaluation of construction stakeholder management research by presenting a review around four distinctive themes: the moral obligations of engaging with stakeholders against the business and efficiency driven imperatives of construction organisations; the contrast between theoretical abstractions and empirically grounded research; the tensions between theoretical convergence versus calls for multiple and divergent perspectives on stakeholder management and the practicalities of conducting stakeholder management in the construction domain. Such a critical re-appraisal of stakeholder management thinking both generates new lines of enquiry and promises to help inform and shape current and future industry practice.
Resumo:
Standard form contracts are typically developed through a negotiated consensus, unless they are proffered by one specific interest group. Previously published plans of work and other descriptions of the processes in construction projects tend to focus on operational issues, or they tend to be prepared from the point of view of one or other of the dominant interest groups. Legal practice in the UK permits those who draft contracts to define their terms as they choose. There are no definitive rulings from the courts that give an indication as to the detailed responsibilities of project participants. The science of terminology offers useful guidance for discovering and describing terms and their meanings in their practical context, but has never been used for defining terms for responsibilities of participants in the construction project management process. Organizational analysis enables the management task to be deconstructed into its elemental parts in order that effective organizational structures can be developed. Organizational mapping offers a useful technique for reducing text-based descriptions of project management roles and responsibilities to a comparable basis. Research was carried out by means of a desk study, detailed analysis of nine plans of work and focus groups representing all aspects of the construction industry. No published plan of work offers definitive guidance. There is an enormous amount of variety in the way that terms are used for identifying responsibilities of project participants. A catalogue of concepts and terms (a “Terminology”) has been compiled and indexed to enable those who draft contracts to choose the most appropriate titles for project participants. The purpose of this terminology is to enable the selection and justification of appropriate terms in order to help define roles. The terminology brings an unprecedented clarity to the description of roles and responsibilities in construction projects and, as such, will be helpful for anyone seeking to assemble a team and specify roles for project participants.
Resumo:
Little attention has been focussed on a precise definition and evaluation mechanism for project management risk specifically related to contractors. When bidding, contractors traditionally price risks using unsystematic approaches. The high business failure rate our industry records may indicate that the current unsystematic mechanisms contractors use for building up contingencies may be inadequate. The reluctance of some contractors to include a price for risk in their tenders when bidding for work competitively may also not be a useful approach. Here, instead, we first define the meaning of contractor contingency, and then we develop a facile quantitative technique that contractors can use to estimate a price for project risk. This model will help contractors analyse their exposure to project risks; and help them express the risk in monetary terms for management action. When bidding for work, they can decide how to allocate contingencies strategically in a way that balances risk and reward.
Resumo:
Ethnographic methodologies developed in social anthropology and sociology hold considerable promise for addressing practical, problem-based research concerned with the construction site. The extended researcher-engagement characteristic of ethnography reveals rich insights, yet is infrequently used to understand how workplace realities are lived out on construction sites. Moreover, studies that do employ these methods are rarely reported within construction research journals. This paper argues that recent innovations in ethnographic methodologies offer new routes to: posing questions; understanding workplace socialities (i.e. the qualities of the social relationships that develop on construction sites); learning about forms, uses and communication of knowledge on construction sites; and turning these into meaningful recommendations. This argument is supported by examples from an interdisciplinary ethnography concerning migrant workers and communications on UK construction sites. The presented research seeks to understand how construction workers communicate with managers and each other and how they stay safe on site, with the objective of informing site health-and-safety strategies and the production and evaluation of training and other materials.
Resumo:
Studies of construction labour productivity have revealed that limited predictability and multi-agent social complexity make long-range planning of construction projects extremely inaccurate. Fire-fighting, a cultural feature of construction project management, social and structural diversity of involved permanent organizations, and structural temporality all contribute towards relational failures and frequent changes. The main purpose of this paper is therefore to demonstrate that appropriate construction planning may have a profound synergistic effect on structural integration of a project organization. Using the general systems theory perspective it is further a specific objective to investigate and evaluate organizational effects of changes in planning and potentials for achieving continuous project-organizational synergy. The newly developed methodology recognises that planning should also represent a continuous, improvement-leading driving force throughout a project. The synergistic effect of the process planning membership duality fostered project-wide integration, eliminated internal boundaries, and created a pool of constantly upgrading knowledge. It maintained a creative environment that resulted in a number of process-related improvements from all parts of the organization. As a result labour productivity has seen increases of more than 30%, profits have risen from an average of 12% to more than 18%, and project durations have been reduced by several days.