Resumo:

This report addresses the extent that managerial practices can be shared between the aerospace and construction sectors. Current recipes for learning from other industries tend to be oversimplistic and often fail to recognise the embedded and contextual nature of managerial knowledge. Knowledge sharing between business sectors is best understood as an essential source of innovation. The process of comparison challenges assumptions and better equips managers to cope with future change. Comparisons between the aerospace and construction sectors are especially useful because they are so different. The two sectors differ hugely in terms of their institutional context, structure and technological intensity. The aerospace sector has experienced extensive consolidation and is dominated by a small number of global companies. Aerospace companies operate within complex networks of global interdependency such that collaborative working is a commercial imperative. In contrast, the construction sector remains highly fragmented and is characterised by a continued reliance on small firms. The vast majority of construction firms compete within localised markets that are too often characterised by opportunistic behaviour. Comparing construction to aerospace highlights the unique characteristics of both sectors and helps explain how managerial practices are mediated by context. Detailed comparisons between the two sectors are made in a range of areas and guidance is provided for the implementation of knowledge sharing strategies within and across organisations. The commonly accepted notion of ‘best practice’ is exposed as a myth. Indeed, universal models of best practice can be detrimental to performance by deflecting from the need to adapt continuously to changing circumstances. Competitiveness in the construction sector too often rests on efficiency in managing contracts, with a particular emphasis on the allocation of risk. Innovation in construction tends to be problem-driven and is rarely shared from project to project. In aerospace, the dominant model of competitiveness means that firms have little choice other than to invest in continuous innovation, despite difficult trading conditions. Research and development (R&D) expenditure in aerospace continues to rise as a percentage of turnovers. A sustained capacity for innovation within the aerospace sector depends crucially upon stability and continuity of work. In the construction sector, the emergence of the ‘hollowed-out’ firm has undermined the industry’s capacity for innovation. Integrated procurement contexts such as prime contracting in construction potentially provide a more supportive climate for an innovation-based model of competitiveness. However, investment in new ways of working depends upon a shift in thinking not only amongst construction contractors, but also amongst the industry’s major clients.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The main aim of this study was to ascertain and discuss the current challenges and opportunities facing construction contractors in Ghana. This involved a review of the economic, legal and political environments in which contractors in Ghana operate; a review of published studies on construction in developing countries generally and Ghana specifically; and in-depth interviews and discussions with seven building and civil engineering contractors in Ghana in 2009 and 2010. Six road contractors were also interviewed. The findings indicate significant challenges relating mainly to financing for projects and a harsh business environment. However, most contractors interviewed admitted to significant problems in their own organisations. It is clear that the contracting environment in Ghana is harsh particularly for local contractors who are often not paid on time and without compensation for late payment. However, local construction firms in Ghana who want to breakthrough ought to formulate the right strategic plans, develop innovative business strategies, develop professionalism, and merge with local firms with similar organisational values and characteristics. In short, local or indigenous Ghanaian contractors ought to face up to the reality of competition and the dynamics of modern business in order to survive, grow and become major players in the construction industry in Ghana.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

A review of current risk pricing practices in the financial, insurance and construction sectors is conducted through a comprehensive literature review. The purpose was to inform a study on risk and price in the tendering processes of contractors: specifically, how contractors take account of risk when they are calculating their bids for construction work. The reference to mainstream literature was in view of construction management research as a field of application rather than a fundamental academic discipline. Analytical models are used for risk pricing in the financial sector. Certain mathematical laws and principles of insurance are used to price risk in the insurance sector. construction contractors and practitioners are described to traditionally price allowances for project risk using mechanisms such as intuition and experience. Project risk analysis models have proliferated in recent years. However, they are rarely used because of problems practitioners face when confronted with them. A discussion of practices across the three sectors shows that the construction industry does not approach risk according to the sophisticated mechanisms of the two other sectors. This is not a poor situation in itself. However, knowledge transfer from finance and insurance can help construction practitioners. But also, formal risk models for contractors should be informed by the commercial exigencies and unique characteristics of the construction sector.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The international construction market is very complex, and requires strong structure and strategy for companies wanting to operate overseas. This article investigates characteristics of international construction. The international operation of Brazilian contractors is explored via results from a qualitative study which was carried out using case studies. The case studies comprised ten big Brazilian contractors, six of which operate abroad. The study identified the patterns of international operation, the competitive advantages of these contractors, as well as the difficulties faced by them in the international construction market. Four of the contractors studied operate only in the domestic market. The study of these cases revealed both obstacles and motivations for future international operations. The study revealed that despite the existing competitive advantages, Brazilian contractors' presence in the international market is limited. The main reason for that is probably their main competitive disadvantage: the lack of financial support from the government.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Government and institutionally-driven ‘good practice transfer’ initiatives are consistently presented as a means to enhance construction firm and industry performance. Two implicit tenets of these initiatives appear to be: knowledge embedded in good practice will transfer automatically; and, the potential of implementing good practice will be capitalised regardless of the context where it is to be used. The validity of these tenets is increasingly being questioned and, concurrently, more nuanced knowledge production understandings are being developed which recognise and incorporate context-specificity. This research contributes to this growing, more critical agenda by examining the actual benefits accrued from good practice transfer from the perspective of a small specialist trade contracting firm. A concept model for successful good practice transfer is developed from a single longitudinal case study within a small heating and plumbing firm. The concept model consists of five key variables: environment, strategy, people, technology, and organisation of work. The key findings challenge the implicit assumptions prevailing in the existing literature and support a contingency approach that argues successful good practice transfer is not just adopting and mechanistically inserting into the firm, but requires addressing ‘behavioural’ aspects. For successful good practice transfer, small specialist trade contracting firms need to develop and operationalise organisation slack, mechanisms for scanning external stimuli and absorbing knowledge. They also need to formulate and communicate client-driven external strategies; to motive and educate people at all levels; to possess internal or accessible complementary skills and knowledge; to have ‘soft focus’ immediate/mid-term benefits at a project level; and, to embed good practice in current work practices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The origins of the various procurement methods in construction are considered, followed by a discussion of the circumstances for which each procurement system is best suited. The likely future development sin management-based methods are discussed in the context of current research, showing that co-ordination of trade and specialist contractors , more flexible contracting, constructive conflict management and a potential polarization of views about project management in the industry are likely.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper is from a study on specialist and trade contracting in the construction industry. The research was commissioned by CIRIA and undertaken by the University of Reading in conjunction with Sir Alexander Gibb & Partners Ltd. The purpose of the work was to provide guidance for effective and equitable practice in the management of projects where much of the work is executed, and possibly designed, by specialist and trade contractors (STCs). As part of this study, a preliminary investigation into the nature and origins of specialist contracting was undertaken, in conjunction with a survey of the problems confronting STCs. This paper presents that phase of the project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The context of construction management (CM) reveals that this method of procurement is as much a management philosophy as a contract structure. It is important to consider legal and contractual issues in this context. The interplay between management and law is complex and often misunderstood. Before considering specific issues, the use of contractual remedies in business agreements is discussed. In addition, the extent to which standardising a form of contract detracts or contributes to the success of projects is also considered. The dearth of judicial decisions, and the lack of a standard form, render it difficult to be specific about legal issues. Therefore, the main discussion of legal issues is centred around a recently completed research project which involved eliciting the views of a cross-section of experienced construction management clients, consultants and trade contractors. These interviews are used as the basis for highlighting some of the most important legal points to consider when setting up CM projects. The interviews revealed that the advantage of CM is the proximity of the client to the trade contractors and the disadvantage is that it depends on a high degree of professionalism and experience; qualities which are unfortunately difficult to find in the UK construction industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There is a clear need for financial protection in the construction industry, both to guarantee satisfactory completion of construction projects and to guard against non-payment. However, the cost of financial protection is often felt to be disproportionately high, with unnecessary overlap between different measures. The Reading Construction Forum has commissioned and steered research which is published in this report in an effort to bring the problem out into the open and to clarify the various options open to the various parties and stakeholders in the construction process. "Financial Protection in the UK Building Industry" is the first definitive report on the subject, offering an accurate and simple guide that all levels within the construction industry can understand. This accessible new guide considers the problem of financial protection and clearly lays out the alternative solutions.It looks by turn at the client, the main contractor, and the sub-contractor, discussing which financial protection options are available to each of them, and considers the pros and cons of each option. The cost of each type of financial protection is weighed against the amount of protection provided and the risks involved. The book concludes with guidance for consultants, emphasising relevant points to consider when advising clients and contractors about which type of financial protection to choose. "Financial Protection in the UK Building Industry" was researched by a literature search, collection of statistical data, and financial data, as well as discussions with clients, contractors, sub-contractors and consultants. This investigation has shown that the direct costs of implementing financial protection measures are marginal, and that wider adoption of payment protection would create a more equitable situation between contracting parties.This guide will enable anyone in the construction industry to consider all the options, and determine what is the best solution for them. "Reading Construction Forum Financial Protection for the UK Building Industry" was complied by the University of Reading, funded by the Reading Construction Forum. The Forum has recently commissioned and steered a number of high-profile reports covering important aspects of the construction industry. Members of the Forum include major companies which are concerned with achieving high quality in the design, construction and use of commercial, retail and industrial buildings. All are committed to change and innovation in the British and European construction industries.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The level of insolvencies in the construction industry is high, when compared to other industry sectors. Given the management expertise and experience that is available to the construction industry, it seems strange that, according to the literature, the major causes of failure are lack of financial control and poor management. This indicates that with a good cash flow management, companies could be kept operating and financially healthy. It is possible to prevent failure. Although there are financial models that can be used to predict failure, they are based on company accounts, which have been shown to be an unreliable source of data. There are models available for cash flow management and forecasting and these could be used as a starting point for managers in rethinking their cash flow management practices. The research reported here has reached the stage of formulating researchable questions for an in-depth study including issues such as how contractors manage their cash flow, how payment practices can be managed without damaging others in the supply chain and the relationships between companies" financial structures and the payment regimes to which they are subjected.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply chain from clients to consultants, contractors, sub-contractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, based on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with tendering are highly variable, 1-15%, depending upon what precisely is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The level of insolvencies in the construction industry is high, when compared to other industry sectors. Given the management expertise and experience that is available to the construction industry, it seems strange that, according to the literature, the major causes of failure are lack of financial control and poor management. This indicates that with a good cash flow management, companies could be kept operating and financially healthy. It is possible to prevent failure. Although there are financial models that can be used to predict failure, they are based on company accounts, which have been shown to be an unreliable source of data. There are models available for cash flow management and forecasting and these could be used as a starting point for managers in rethinking their cash flow management practices. The research reported here has reached the stage of formulating researchable questions for an in-depth study including issues such as how contractors manage their cash flow, how payment practices can be managed without damaging others in the supply chain and the relationships between companies’ financial structures and the payment regimes to which they are subjected.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Formal and analytical risk models prescribe how risk should be incorporated in construction bids. However, the actual process of how contractors and their clients negotiate and agree on price is complex, and not clearly articulated in the literature. Using participant observation, the entire tender process was shadowed in two leading UK construction firms. This was compared to propositions in analytical models and significant differences were found. 670 hours of work observed in both firms revealed three stages of the bidding process. Bidding activities were categorized and their extent estimated as deskwork (32%), calculations (19%), meetings (14%), documents (13%), off-days (11%), conversations (7%), correspondence (3%) and travel (1%). Risk allowances of 1-2% were priced in some bids and three tiers of risk apportionment in bids were identified. However, priced risks may sometimes be excluded from the final bidding price to enhance competitiveness. Thus, although risk apportionment affects a contractor’s pricing strategy, other complex, microeconomic factors also affect price. Instead of pricing in contingencies, risk was priced mostly through contractual rather than price mechanisms, to reflect commercial imperatives. The findings explain why some assumptions underpinning analytical models may not be sustainable in practice and why what actually happens in practice is important for those who seek to model the pricing of construction bids.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis is aimed to initiate implementing sustainable building construction in the kingdom of Bahrain, i.e. Building-Integration PhotoVoltaic (BIPV) or Wind Energy (BIWE). It highlights the main constrains that discourage such modern concept in building and construction. Three groups have been questioned using a questionnaire. These are the policy and decision makers, the leading consultants and the contractors. The main constrains of the dissemination of BIVP and BIWE, according to the policy and decision makers, are: lack of knowledge and awareness of the public in sustainable technology, low cost of electricity, low cost of gas and oil and difficulty in applying local environmental taxes. The consultants had attributed the constrains to ignorance of life cycle cost of PV and Wind turbines systems, lack of education and knowledge in sustainable design, political system, shortage of markets importing sustainable technologies and client worries in profitability and pay-back period. The contractors are found to be very enthusiastic and ready to take over any sustainable building project and prefer to have a construction manger to coordinate between the design and contracting team. Design and Build is found the favorable procurement method in Bahrain for conducting BIPV or BIWE projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper aims to introduce a knowledge-based managemental prototype entitled Eþ for environmental-conscious construction relied on an integration of current environmental management tools in construction area. The overall objective of developing the Eþ prototype is to facilitate selectively reusing the retrievable knowledge in construction engineering and management areas assembled from previous projects for the best practice in environmental-conscious construction. The methodologies adopted in previous and ongoing research related to the development of the Eþ belong to the operations research area and the information technology area, including literature review, questionnaire survey and interview, statistical analysis, system analysis and development, experimental research and simulation, and so on. The content presented in this paper includes an advanced Eþ prototype, a comprehensive review of environmental management tools integrated to the Eþ prototype, and an experimental case study of the implementation of the Eþ prototype. It is expected that the adoption and implementation of the Eþ prototype can effectively facilitate contractors to improve their environmental performance in the lifecycle of projectbased construction and to reduce adverse environmental impacts due to the deployment of various engineering and management processes at each construction stage.