22 resultados para Construction Firm
em CentAUR: Central Archive University of Reading - UK
Resumo:
There are a number of challenges associated with managing knowledge and information in construction organizations delivering major capital assets. These include the ever-increasing volumes of information, losing people because of retirement or competitors, the continuously changing nature of information, lack of methods on eliciting useful knowledge, development of new information technologies and changes in management and innovation practices. Existing tools and methodologies for valuing intangible assets in fields such as engineering, project management and financial, accounting, do not address fully the issues associated with the valuation of information and knowledge. Information is rarely recorded in a way that a document can be valued, when either produced or subsequently retrieved and re-used. In addition there is a wealth of tacit personal knowledge which, if codified into documentary information, may prove to be very valuable to operators of the finished asset or future designers. This paper addresses the problem of information overload and identifies the differences between data, information and knowledge. An exploratory study was conducted with a leading construction consultant examining three perspectives (business, project management and document management) by structured interviews and specifically how to value information in practical terms. Major challenges in information management are identified. An through-life Information Evaluation methodology (IEM) is presented to reduce information overload and to make the information more valuable in the future.
Resumo:
Generally poor productivity, delays, low profitability and exceeded budgets are Common problems in modern construction management, however it seems that a basic obstacle lies far deeper in the understanding of a firm's fundamental mission, its existence. The main objective of this paper therefore is to examine the operational living of a construction firm and by doing that to reveal the key problem or the solution for a construction firm - its organization. A firm as a social system in which interactions between its constitutive components (employees) are surordinated to its maintenance (keeping a system alive) is an autopoietic social system. Two domains of external perturbations are uncovered to which a construction firm has to adapt (market driven and project driven perturbations). Constructed conceptual model of an autopoietic organization is based upon two necessary and sufficient operational domains that a firm has to create in order to become an autopoietic, adaptive social system. The first one is a domain of interactions between employees and other operationally external systems, which is representing an idea-generating domain of interactions. The second is employee's autonomous operational domain, which embodies employee's autonomy and individuality and represents a necessary condition for the establishment of an idea-generating domain. Finally, it is recognized that interactions within these four domains keep a construction firm alive.
Resumo:
In financial decision-making processes, the adopted weights of the objective functions have significant impacts on the final decision outcome. However, conventional rating and weighting methods exhibit difficulty in deriving appropriate weights for complex decision-making problems with imprecise information. Entropy is a quantitative measure of uncertainty and has been useful in exploring weights of attributes in decision making. A fuzzy and entropy-based mathematical approach is employed to solve the weighting problem of the objective functions in an overall cash-flow model. The multiproject being undertaken by a medium-size construction firm in Hong Kong was used as a real case study to demonstrate the application of entropy. Its application in multiproject cash flow situations is demonstrated. The results indicate that the overall before-tax profit was HK$ 0.11 millions lower after the introduction of appropriate weights. In addition, the best time to invest in new projects arising from positive cash flow was identified to be two working months earlier than the nonweight system.
Resumo:
The construction sector is often described as lagging behind other major industries. At first this appears fair when considering the concept of corporate social responsibility (CSR). It is argued that CSR is ill-defined, with firms struggling to make sense of and engage with it. Literature suggests that the short-termism view of construction firms renders the long-term, triple-bottom-line principle of CSR untenable. This seems to be borne out by literature indicating that construction firms typically adopt a compliance-based approach to CSR instead of discretionary CSR which is regarded as adding most value to firms and benefiting the broadest group of stakeholders. However, this research conducted in the UK using a regional construction firm offers a counter argument whereby discretionary CSR approaches are well embedded and enacted within the firms’ business operations even though they are not formally articulated as CSR strategies and thus remain 'hidden'. This raises questions in the current CSR debate. First, is ‘hidden’ CSR relevant to the long term success of construction firms? and to what extent do these firms need to reinvent themselves to formally take advantage of the CSR agenda?
Resumo:
Government and institutionally-driven ‘good practice transfer’ initiatives are consistently presented as a means to enhance construction firm and industry performance. Two implicit tenets of these initiatives appear to be: knowledge embedded in good practice will transfer automatically; and, the potential of implementing good practice will be capitalised regardless of the context where it is to be used. The validity of these tenets is increasingly being questioned and, concurrently, more nuanced knowledge production understandings are being developed which recognise and incorporate context-specificity. This research contributes to this growing, more critical agenda by examining the actual benefits accrued from good practice transfer from the perspective of a small specialist trade contracting firm. A concept model for successful good practice transfer is developed from a single longitudinal case study within a small heating and plumbing firm. The concept model consists of five key variables: environment, strategy, people, technology, and organisation of work. The key findings challenge the implicit assumptions prevailing in the existing literature and support a contingency approach that argues successful good practice transfer is not just adopting and mechanistically inserting into the firm, but requires addressing ‘behavioural’ aspects. For successful good practice transfer, small specialist trade contracting firms need to develop and operationalise organisation slack, mechanisms for scanning external stimuli and absorbing knowledge. They also need to formulate and communicate client-driven external strategies; to motive and educate people at all levels; to possess internal or accessible complementary skills and knowledge; to have ‘soft focus’ immediate/mid-term benefits at a project level; and, to embed good practice in current work practices.
Resumo:
From a construction innovation systems perspective, firms acquire knowledge from suppliers, clients, universities and institutional environment. Building information modelling (BIM) involves these firms using new process standards. To understand the implications on interactive learning using BIM process standards, a case study is conducted with the UK operations of a multinational construction firm. Data is drawn from: a) two workshops involving the firm and a wider industry group, b) observations of practice in the BIM core team and in three ongoing projects, c) 12 semi-structured interviews; and d) secondary publications. The firm uses a set of BIM process standards (IFC, PAS 1192, Uniclass, COBie) in its construction activities. It is also involved in a pilot to implement the COBie standard, supported by technical and management standards for BIM, such as Uniclass and PAS1192. Analyses suggest that such BIM process standards unconsciously shapes the firm's internal and external interactive learning processes. Internally standards allow engineers to learn from each through visualising 3D information and talking around designs with operatives to address problems during construction. Externally, the firm participates in trial and pilot projects involving other construction firms, government agencies, universities and suppliers to learn about the standard and access knowledge to solve its specific design problems. Through its BIM manager, the firm provides feedback to standards developers and information technology suppliers. The research contributes by articulating how BIM process standards unconsciously change interactive learning processes in construction practice. Further research could investigate these findings in the wider UK construction innovation system.
Resumo:
Current literature offers little understanding about how procurement methods are enacted in practice. Developments in procurement are often viewed as the result of responding to recommendations from particular constituents within the sector. The research seeks to remove itself from such deterministic leaning, counselling instead that procurement should not be viewed in static terms, but dynamically manifesting over time within a complex web of interconnections between various actors, their situated context and the broader industrial structure. Attention is given to how a client and construction firm engaged in a collusive interaction to realise an innovative procurement method that derived its legitimacy from a backcloth of initiatives promoted by various commentators. A case study of a medium-size regional contractor demonstrates how the first partnering arrangement was enacted within the UK affordable housing maintenance sector in the UK. The case study finds that the enactment of new procurement methods strongly relies on iterative learning between clients and contractors. It is further suggested that construction firms need to initiate new procurement in order to remain competitive within the sector. The findings point towards a pro-active initiative by the contractor and client to enact a ‘procurement first’. Encouragement may be drawn from this example by other contractors seeking to offer more than simply responsive procurement solutions.
Resumo:
In financial decision-making, a number of mathematical models have been developed for financial management in construction. However, optimizing both qualitative and quantitative factors and the semi-structured nature of construction finance optimization problems are key challenges in solving construction finance decisions. The selection of funding schemes by a modified construction loan acquisition model is solved by an adaptive genetic algorithm (AGA) approach. The basic objectives of the model are to optimize the loan and to minimize the interest payments for all projects. Multiple projects being undertaken by a medium-size construction firm in Hong Kong were used as a real case study to demonstrate the application of the model to the borrowing decision problems. A compromise monthly borrowing schedule was finally achieved. The results indicate that Small and Medium Enterprise (SME) Loan Guarantee Scheme (SGS) was first identified as the source of external financing. Selection of sources of funding can then be made to avoid the possibility of financial problems in the firm by classifying qualitative factors into external, interactive and internal types and taking additional qualitative factors including sovereignty, credit ability and networking into consideration. Thus a more accurate, objective and reliable borrowing decision can be provided for the decision-maker to analyse the financial options.
Resumo:
The UK government is mandating the use of building information modelling (BIM) in large public projects by 2016. As a result, engineering firms are faced with challenges related to embedding new technologies and associated working practices for the digital delivery of major infrastructure projects. Diffusion of innovations theory is used to investigate how digital innovations diffuse across complex firms. A contextualist approach is employed through an in-depth case study of a large, international engineering project-based firm. The analysis of the empirical data, which was collected over a four-year period of close interaction with the firm, reveals parallel paths of diffusion occurring across the firm, where both the innovation and the firm context were continually changing. The diffusion process is traced over three phases: centralization of technology management, standardization of digital working practices, and globalization of digital resources. The findings describe the diffusion of a digital innovation as multiple and partial within a complex social system during times of change and organizational uncertainty, thereby contributing to diffusion of innovations studies in construction by showing a range of activities and dynamics of a non-linear diffusion process.
Resumo:
Since its popularization in the 1980s, competitiveness has received close attention from practitioners and researchers across a wide range of industries. In the construction sector, many works on competitiveness have also been published. So far, however, there seems to be no comprehensive review to summarize and critique existing research on competitiveness in construction. This research, therefore, reviews the extant literature from four aspects: concept of competitiveness, competitiveness research at the construction industry level, competitiveness research at the firm level, and competitiveness research at the project level. The review presents the state-of-the-art development of competitiveness research in construction, identifies the research gaps, and proposes new directions for further studies. Further research is recommended to validate previous studies in construction practices, identify the mechanisms that encourage mutual enhancement of competitiveness at different levels, and how to achieve its sustainability by embracing new management and/or economics techniques.
Resumo:
This report addresses the extent that managerial practices can be shared between the aerospace and construction sectors. Current recipes for learning from other industries tend to be oversimplistic and often fail to recognise the embedded and contextual nature of managerial knowledge. Knowledge sharing between business sectors is best understood as an essential source of innovation. The process of comparison challenges assumptions and better equips managers to cope with future change. Comparisons between the aerospace and construction sectors are especially useful because they are so different. The two sectors differ hugely in terms of their institutional context, structure and technological intensity. The aerospace sector has experienced extensive consolidation and is dominated by a small number of global companies. Aerospace companies operate within complex networks of global interdependency such that collaborative working is a commercial imperative. In contrast, the construction sector remains highly fragmented and is characterised by a continued reliance on small firms. The vast majority of construction firms compete within localised markets that are too often characterised by opportunistic behaviour. Comparing construction to aerospace highlights the unique characteristics of both sectors and helps explain how managerial practices are mediated by context. Detailed comparisons between the two sectors are made in a range of areas and guidance is provided for the implementation of knowledge sharing strategies within and across organisations. The commonly accepted notion of ‘best practice’ is exposed as a myth. Indeed, universal models of best practice can be detrimental to performance by deflecting from the need to adapt continuously to changing circumstances. Competitiveness in the construction sector too often rests on efficiency in managing contracts, with a particular emphasis on the allocation of risk. Innovation in construction tends to be problem-driven and is rarely shared from project to project. In aerospace, the dominant model of competitiveness means that firms have little choice other than to invest in continuous innovation, despite difficult trading conditions. Research and development (R&D) expenditure in aerospace continues to rise as a percentage of turnovers. A sustained capacity for innovation within the aerospace sector depends crucially upon stability and continuity of work. In the construction sector, the emergence of the ‘hollowed-out’ firm has undermined the industry’s capacity for innovation. Integrated procurement contexts such as prime contracting in construction potentially provide a more supportive climate for an innovation-based model of competitiveness. However, investment in new ways of working depends upon a shift in thinking not only amongst construction contractors, but also amongst the industry’s major clients.
Resumo:
The link between competitiveness and sustained prosperity of a nation, industry or firm, is a well established argument and serves as the basis for making policy decisions and directing strategic change. The importance of construction industry competitiveness is currently receiving considerable attention from countries such as Finland, Sweden and the UK. This paper critically reviews the existing measures of competitiveness, challenges productivity and profitability as the dominant measures of construction industry competitiveness and introduces a more holistic set of measures that addresses the needs of investors, employees, clients and overall society. The research also reports upon the application of this more holistic set of measures for measuring competitiveness and presents results for the Swedish construction industry. The paper principally sets out to present the preliminary findings of an ongoing research project, which will eventually compare the competitiveness of the Swedish construction industry with that of Finland and the UK.
Resumo:
Globalisation has prompted increasing numbers of construction profes-sional services (CPS) firms to internationalise and export their services. The driver has been twofold; firstly to increase turnover/profits and sec-ondly, to minimise the risk of a reliance on working in a single domestic market which has a fluctuating demand. Secondly, where firms have out-grown their domestic market, and in order to expand, they must export overseas. There has been little research into the way CPS firms operate overseas, yet construction represents approximately 10% of global GDP; this means that understanding CPS firms is important. This paper investigates how CPS firms internationalise and the drivers that impact their decisions and operations overseas. A survey was undertaken and interviews conducted that showed CPS firms are project driven, in-vesting heavily in the process of seeking work/bidding for projects, and are very focused on delivering projects with minimum risk. Increasing foreign ownership, changing procurement approaches and more consolidation of CPS firms in the global marketplace present a changing business land-scape. The research develops a framework of tangible and intangible factors, such as competencies, business organisation culture, leadership and reputation in order to better understand how CPS firms export their ser-vices. Whilst all CPS firms share the same framework of factors, the re-sulting synergies are different not only for each firm but also for each pro-ject. The knowledge-intensive and project-based nature of CPS firms presents a challenge in understanding the way they operate in the global service economy.