24 resultados para Concrete Printing
em CentAUR: Central Archive University of Reading - UK
Resumo:
Delayed ettringite formation (DEF) in cementitious materials is widely considered as a harmful chemical reaction that causes extensive damages in hardened concrete. However, preventative measures and possible improvements in general are not extensively studied and require further attention. In this study was presented an investigation into a type of controlled DEF in places of finely dispersed crystallisation nuclei and provide evidence that the process may improve compressive strength of cementitious materials. The Alkali-Silica Reaction (ASR) in hydrated concrete was achieved with the addition of fly ash and was further accelerated with the Duggan’s test. Achieved strengths and monitoring of microstructure development conducted with electronic microscopy revealed that growth of ettringite crystals in the nuclei led to harmless internal compressive stresses, expansion of hydrated concrete and overall strengthening of the concrete matrix.
Resumo:
The successful implementation of just-in-time (JIT) purchasing policy in many industries has prompted many companies that still use the economic order quantity (EOQ) purchasing policy to ponder if they should switch to the JIT purchasing policy. Despite existing studies that directly compare the costs between the EOQ and JIT purchasing systems, this decision is, however, still difficult to be made, especially when price discount has to be considered. JIT purchasing may not always be successful even though plants that adopted JIT operations have experienced or can take advantage of physical space reduction. Hence, the objective of this study is to expand on a classical EOQ with a price discount model to derive the EOQ–JIT cost indifference point. The objective was tested and achieved through a survey and case study conducted in the ready-mixed concrete industry in Singapore.
Resumo:
A model for comparing the inventory costs of purchasing under the economic order quantity (EOQ) system and the just-in-time (JIT) order purchasing system in existing literature concluded that JIT purchasing was virtually always the preferable inventory ordering system especially at high level of annual demand. By expanding the classical EOQ model, this paper shows that it is possible for the EOQ system to be more cost effective than the JIT system once the inventory demand approaches the EOQ-JIT cost indifference point. The case study conducted in the ready-mixed concrete industry in Singapore supported this proposition.
Resumo:
A statistical technique for fault analysis in industrial printing is reported. The method specifically deals with binary data, for which the results of the production process fall into two categories, rejected or accepted. The method is referred to as logistic regression, and is capable of predicting future fault occurrences by the analysis of current measurements from machine parts sensors. Individual analysis of each type of fault can determine which parts of the plant have a significant influence on the occurrence of such faults; it is also possible to infer which measurable process parameters have no significant influence on the generation of these faults. Information derived from the analysis can be helpful in the operator's interpretation of the current state of the plant. Appropriate actions may then be taken to prevent potential faults from occurring. The algorithm is being implemented as part of an applied self-learning expert system.