72 resultados para Case Conference

em CentAUR: Central Archive University of Reading - UK


Relevância:

70.00% 70.00%

Publicador:

Resumo:

This paper describes how the business case can be characterized and used to quickly make an initial and structurally complete goal-responsibility model. This eases the problem of bringing disciplined support to key decision makers in a development project in such a way that it can be instantiated quickly and thereafter support all key decision gateways. This process also greatly improves the understanding shared by the key decision makers and helps to identify and manage load-bearing assumptions.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This paper presents a semi-synchronous pipeline scheme, here referred as single-pulse pipeline, to the problem of mapping pipelined circuits to a Field Programmable Gate Array (FPGA). Area and timing considerations are given for a general case and later applied to a systolic circuit as illustration. The single-pulse pipeline can manage asynchronous worst-case data completion and it is evaluated against two chosen asynchronous pipelining: a four-phase bundle-data pipeline and a doubly-latched asynchronous pipeline. The semi-synchronous pipeline proposal takes less FPGA area and operates faster than the two selected fully-asynchronous schemes for an FPGA case.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The management of a public sector project is analysed using a model developed from systems theory. Linear responsibility analysis is used to identify the primary and key decision structure of the project and to generate quantitative data regarding differentiation and integration of the operating system, the managing system and the client/project team. The environmental context of the project is identified. Conclusions are drawn regarding the project organization structure's ability to cope with the prevailing environmental conditions. It is found that the complexity of the managing system imposed on the project was unable to achieve this and created serious deficiencies in the outcome of the project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Consider the statement "this project should cost X and has risk of Y". Such statements are used daily in industry as the basis for making decisions. The work reported here is part of a study aimed at providing a rational and pragmatic basis for such statements. Of particular interest are predictions made in the requirements and early phases of projects. A preliminary model has been constructed using Bayesian Belief Networks and in support of this, a programme to collect and study data during the execution of various software development projects commenced in May 2002. The data collection programme is undertaken under the constraints of a commercial industrial regime of multiple concurrent small to medium scale software development projects. Guided by pragmatism, the work is predicated on the use of data that can be collected readily by project managers; including expert judgements, effort, elapsed times and metrics collected within each project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dog-in-a-Doublet Bridge Reconstruction Scheme integrates the interdisciplinary design to provide solution for different needs: to provide a crossing to carry the new 40-tonne loading requirement, to improve the visibility of the substandard junction, and within the funding available. The management of the project involves the co-ordination of different authorities, statutory undertakers and other bodies. At certain stages, there were negotiations with RSPB on the restriction of construction period from July to November. After the re-assessment of the environmental impact of the construction on the breeding and wintering birds, the restrict was waived. As the bid for the assessment, strengthening and structural maintenance of bridges in the Cambridgeshire County Council Transport Policies and Programme No. 21 (1995/96) for Dog-in-a-Doublet Bridge Reconstruction Schemes was unsuccessful to attract the Transport Supplement Grant (TSG). A series of temporary measures had to be undertaken until funding is available for its replacement.