29 resultados para Business process re-engineering
em CentAUR: Central Archive University of Reading - UK
Resumo:
The current research agenda for construction process improvement is heavily influenced by the rhetoric of business process re-engineering (BPR). In contrast to the wider literature on BPR, there is little evidence of critical thought within the construction management research community. A postmodernist interpretation is advocated whereby the reality of management practice is defined by the dominant management discourse. The persuasiveness of BPR rhetoric is analysed with particular reference to the way in which it plays on the insecurity of modern managers. Despite the lip service given to ‘empowerment’ and ‘teamwork’, the dominant theme of the re-engineering movement is that of technocratic totalitarianism. From a critical perspective, it is suggested that BPR is imposed on construction organizations to ensure continued control by the industry's dominant power groups. Whilst industry leaders are fond of calling for ‘attitudinal and cultural improvement’, the language of the accepted research agenda continually reinforces the industry's dominant culture of ‘control and command’. Therefore, current research directions in process improvement perpetuate existing attitudes rather than facilitating cultural change. The concept of lean construction is seen to be the latest manifestation of this phenomenon.
Resumo:
It is contended that competitiveness is better understood as a discourse rather than as a characteristic that is supposedly possessed. The discourse of competitiveness derives its legitimacy from the enterprise culture that came to dominance during the 1980s. Current popularized theories of competitiveness are constituent parts of this broader discourse, which has had significant material implications for the UK construction sector. The dominant discourse of competitiveness amongst contracting firms is shaped by the need to achieve structural flexibility to cope with fluctuations in demand. Fashionable espoused improvement recipes such as total quality management, business process re-engineering, and lean construction legitimize and reinforce the material manifestations of the enterprise culture. In consequence, the UK industry is characterized by a plethora of hollowed-out firms that have failed to invest in their human capital. While the adopted model may be rational for individual firms, the systemic effect across the sector as a whole equates to a form of anorexia. However, the discourse of competitiveness is by no means monolithic and continues to be contested locally. There have also been numerous counter-discourses that have been mobilized in response to the undesirable externalities of unbridled enterprise. Currently, important counter-discourses promote the ideas of sustainability and corporate social responsibility.
Resumo:
The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports by Latham (1994, Constructing the Team, HMSO, London) and Egan (1998, Rethinking Construction, HMSO, London). A major problem for construction companies is the lack of project predictability. One method of increasing predictability and delivering increased customer value is through the systematic management of construction processes. However, the industry has no methodological mechanism to assess process capability and prioritise process improvements. Standardized Process Improvement for Construction Enterprises (SPICE) is a research project that is attempting to develop a stepwise process improvement framework for the construction industry, utilizing experience from the software industry, and in particular the Capability Maturity Model (CMM), which has resulted in significant productivity improvements in the software industry. This paper introduces SPICE concepts and presents the results from two case studies conducted on design and build projects. These studies have provided further in-sight into the relevance and accuracy of the framework, as well as its value for the construction sector.
Resumo:
An overtly critical perspective on 're-engineering construction' is presented. It is contended that re-engineering is impossible to define in terms of its substantive content and is best understood as a rhetorical label. In recent years, the language of re-engineering has heavily shaped the construction research agenda. The declared goals are to lower costs and improve value for the customer. The discourse is persuasive because it reflects the ideology of the 'enterprise culture' and the associated rhetoric of customer responsiveness. Re-engineering is especially attractive to the construction industry because it reflects and reinforces the existing dominant way of thinking. The overriding tendency is to reduce organizational complexities to a mechanistic quest for efficiency. Labour is treated as a commodity. Within this context, the objectives of re-engineering become 'common sense'. Knowledge becomes subordinate to the dominant ideology of neo-liberalism. The accepted research agenda for re-engineering construction exacerbates the industry's problems and directly contributes to the casualization of the workforce. The continued adherence to machine metaphors by the construction industry's top management has directly contributed to the 'bad attitudes' and 'adversarial culture' that they repeatedly decry. Supposedly neutral topics such as pre-assembly, partnering, supply chain management and lean thinking serve only to justify the shift towards bogus labour-only subcontracting and the associated reduction of employment rights. The continued casualization of the workforce raises real questions about the industry's future capacity to deliver high-quality construction. In order to appear 'relevant' to the needs of industry, it seems that the research community is doomed to perpetuate this regressive cycle.
Resumo:
Cities may be responsible for up to 70% of global carbon emissions and 75% of global energy consumption and by 2050 it is estimated that 70% of the world's population could live in cities. The critical challenge for contemporary urbanism, therefore, is to understand how to develop the knowledge, capacity and capability for public agencies, the private sector and multiple users in city regions systemically to re-engineer their built environment and urban infrastructure in response to climate change and resource constraints. Re-Engineering the City 2020–2050: Urban Foresight and Transition Management (Retrofit 2050) is a major new interdisciplinary project funded under the Engineering and Physical Science Research Council's (EPSRC) Sustainable Urban Environments Programme which seeks to address this challenge. This briefing describes the background and conceptual framing of Retrofit 2050 project, its aims and objectives and research approach.
Resumo:
Business process modelling can help an organisation better understand and improve its business processes. Most business process modelling methods adopt a task- or activity-based approach to identifying business processes. Within our work, we use activity theory to categorise elements within organisations as being either human beings, activities or artefacts. Due to the direct relationship between these three elements, an artefact-oriented approach to organisation analysis emerges. Organisational semiotics highlights the ontological dependency between affordances within an organisation. We analyse the ontological dependency between organisational elements, and therefore produce the ontology chart for artefact-oriented business process modelling in order to clarify the relationship between the elements of an organisation. Furthermore, we adopt the techniques from semantic analysis and norm analysis, of organisational semiotics, to develop the artefact-oriented method for business process modelling. The proposed method provides a novel perspective for identifying and analysing business processes, as well as agents and artefacts, as the artefact-oriented perspective demonstrates the fundamental flow of an organisation. The modelling results enable an organisation to understand and model its processes from an artefact perspective, viewing an organisation as a network of artefacts. The information and practice captured and stored in artefact can also be shared and reused between organisations that produce similar artefacts.
Resumo:
The complexity of construction projects and the fragmentation of the construction industry undertaking those projects has effectively resulted in linear, uncoordinated and highly variable project processes in the UK construction sector. Research undertaken at the University of Salford resulted in the development of an improved project process, the Process Protocol, which considers the whole lifecycle of a construction project whilst integrating its participants under a common framework. The Process Protocol identifies the various phases of a construction project with particular emphasis on what is described in the manufacturing industry as the ‘fuzzy front end’. The participants in the process are described in terms of the activities that need to be undertaken in order to achieve a successful project and process execution. In addition, the decision-making mechanisms, from a client perspective, are illustrated and the foundations for a learning organization/industry are facilitated within a consistent Process Protocol.
Resumo:
It has been asserted that business reorganisation and new working practices are transforming the nature of demand for business space. Downsizing, delayering, business process reengineering and associated initiatives alter the amount, type and location of space required by firms. The literature has neglected the impact of real estate market structures on the ability of organisations to successfully implement these new organisational forms or contemporary working practices. Drawing from UK research, the paper demonstrates that, while new working practices are widespread, their impact on the corporate real estate portfolio is less dramatic than often supposed. In part, this is attributed to inflexibility in market structures which constrains the supply of appropriate space.
Resumo:
Key Performance Indicators (KPIs) are the main instruments of Business Performance Management. KPIs are the measures that are translated to both the strategy and the business process. These measures are often designed for an industry sector with the assumptions about business processes in organizations. However, the assumptions can be too incomplete to guarantee the required properties of KPIs. This raises the need to validate the properties of KPIs prior to their application to performance measurement. This paper applies the method called EXecutable Requirements Engineering Management and Evolution (EXTREME) for validation of the KPI definitions. EXTREME semantically relates the goal modeling, conceptual modeling and protocol modeling techniques into one methodology. The synchronous composition built into protocol modeling enables raceability of goals in protocol models and constructive definitions of a KPI. The application of the method clarifies the meaning of KPI properties and procedures of their assessment and validation.
Resumo:
This paper describes a case study of an electronic data management system developed in-house by the Facilities Management Directorate (FMD) of an educational institution in the UK. The FMD Maintenance and Business Services department is responsible for the maintenance of the built-estate owned by the university. The department needs to have a clear definition of the type of work undertaken and the administration that enables any maintenance work to be carried out. These include the management of resources, budget, cash flow and workflow of reactive, preventative and planned maintenance of the campus. In order to be more efficient in supporting the business process, the FMD had decided to move from a paper-based information system to an electronic system, WREN, to support the business process of the FMD. Some of the main advantages of WREN are that it is tailor-made to fit the purpose of the users; it is cost effective when it comes to modifications on the system; and the database can also be used as a knowledge management tool. There is a trade-off; as WREN is tailored to the specific requirements of the FMD, it may not be easy to implement within a different institution without extensive modifications. However, WREN is successful in not only allowing the FMD to carry out the tasks of maintaining and looking after the built-estate of the university, but also has achieved its aim to minimise costs and maximise efficiency.
Resumo:
We present a conceptual architecture for a Group Support System (GSS) to facilitate Multi-Organisational Collaborative Groups (MOCGs) initiated by local government and including external organisations of various types. Multi-Organisational Collaborative Groups (MOCGs) consist of individuals from several organisations which have agreed to work together to solve a problem. The expectation is that more can be achieved working in harmony than separately. Work is done interdependently, rather than independently in diverse directions. Local government, faced with solving complex social problems, deploy MOCGs to enable solutions across organisational, functional, professional and juridical boundaries, by involving statutory, voluntary, community, not-for-profit and private organisations. This is not a silver bullet as it introduces new pressures. Each member organisation has its own goals, operating context and particular approaches, which can be expressed as their norms and business processes. Organisations working together must find ways of eliminating differences or mitigating their impact in order to reduce the risks of collaborative inertia and conflict. A GSS is an electronic collaboration system that facilitates group working and can offer assistance to MOCGs. Since many existing GSSs have been primarily developed for single organisation collaborative groups, even though there are some common issues, there are some difficulties peculiar to MOCGs, and others that they experience to a greater extent: a diversity of primary organisational goals among members; different funding models and other pressures; more significant differences in other information systems both technologically and in their use than single organisations; greater variation in acceptable approaches to solve problems. In this paper, we analyse the requirements of MOCGs led by local government agencies, leading to a conceptual architecture for an e-government GSS that captures the relationships between 'goal', 'context', 'norm', and 'business process'. Our models capture the dynamics of the circumstances surrounding each individual representing an organisation in a MOCG along with the dynamics of the MOCG itself as a separate community.
Resumo:
Procurement is one of major business operations in public service sector. The advance of information and communication technology (ICT) pushes this business operation to increase its efficiency and foster collaborations between the organization and its suppliers. This leads to a shift from the traditional procurement transactions to an e-procurement paradigm. Such change impacts on business process, information management and decision making. E-procurement involves various stakeholders who engage in activities based on different social and cultural practices. Therefore, a design of e-procurement system may involve complex situations analysis. This paper describes an approach of using the problem articulation method to support such analysis. This approach is applied to a case study from UAE.
Resumo:
Information systems for business are frequently heavily reliant on software. Two important feedback-related effects of embedding software in a business process are identified. First, the system dynamics of the software maintenance process can become complex, particularly in the number and scope of the feedback loops. Secondly, responsiveness to feedback can have a big effect on the evolvability of the information system. Ways have been explored to provide an effective mechanism for improving the quality of feedback between stakeholders during software maintenance. Understanding can be improved by using representations of information systems that are both service-based and architectural in scope. The conflicting forces that encourage change or stability can be resolved using patterns and pattern languages. A morphology of information systems pattern languages has been described to facilitate the identification and reuse of patterns and pattern languages. The kind of planning process needed to achieve consensus on a system's evolution is also considered.
Resumo:
Current methods and techniques used in designing organisational performance measurement systems do not consider the multiple aspects of business processes or the semantics of data generated during the lifecycle of a product. In this paper, we propose an organisational performance measurement systems design model that is based on the semantics of an organisation, business process and products lifecycle. Organisational performance measurement is examined from academic and practice disciplines. The multi-discipline approach is used as a research tool to explore the weaknesses of current models that are used to design organisational performance measurement systems. This helped in identifying the gaps in research and practice concerning the issues and challenges in designing information systems for measuring the performance of an organisation. The knowledge sources investigated include on-going and completed research project reports; scientific and management literature; and practitioners’ magazines.