Business process modelling can help an organisation better understand and improve its business processes. Most business process modelling methods adopt a task- or activity-based approach to identifying business processes. Within our work, we use activity theory to categorise elements within organisations as being either human beings, activities or artefacts. Due to the direct relationship between these three elements, an artefact-oriented approach to organisation analysis emerges. Organisational semiotics highlights the ontological dependency between affordances within an organisation. We analyse the ontological dependency between organisational elements, and therefore produce the ontology chart for artefact-oriented business process modelling in order to clarify the relationship between the elements of an organisation. Furthermore, we adopt the techniques from semantic analysis and norm analysis, of organisational semiotics, to develop the artefact-oriented method for business process modelling. The proposed method provides a novel perspective for identifying and analysing business processes, as well as agents and artefacts, as the artefact-oriented perspective demonstrates the fundamental flow of an organisation. The modelling results enable an organisation to understand and model its processes from an artefact perspective, viewing an organisation as a network of artefacts. The information and practice captured and stored in artefact can also be shared and reused between organisations that produce similar artefacts.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports by Latham (1994, Constructing the Team, HMSO, London) and Egan (1998, Rethinking Construction, HMSO, London). A major problem for construction companies is the lack of project predictability. One method of increasing predictability and delivering increased customer value is through the systematic management of construction processes. However, the industry has no methodological mechanism to assess process capability and prioritise process improvements. Standardized Process Improvement for Construction Enterprises (SPICE) is a research project that is attempting to develop a stepwise process improvement framework for the construction industry, utilizing experience from the software industry, and in particular the Capability Maturity Model (CMM), which has resulted in significant productivity improvements in the software industry. This paper introduces SPICE concepts and presents the results from two case studies conducted on design and build projects. These studies have provided further in-sight into the relevance and accuracy of the framework, as well as its value for the construction sector.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years, various efforts have been made in air traffic control (ATC) to maintain traffic safety and efficiency in the face of increasing air traffic demands. ATC is a complex process that depends to a large degree on human capabilities, and so understanding how controllers carry out their tasks is an important issue in the design and development of ATC systems. In particular, the human factor is considered to be a serious problem in ATC safety and has been identified as a causal factor in both major and minor incidents. There is, therefore, a need to analyse the mechanisms by which errors occur due to complex factors and to develop systems that can deal with these errors. From the cognitive process perspective, it is essential that system developers have an understanding of the more complex working processes that involve the cooperative work of multiple controllers. Distributed cognition is a methodological framework for analysing cognitive processes that span multiple actors mediated by technology. In this research, we attempt to analyse and model interactions that take place in en route ATC systems based on distributed cognition. We examine the functional problems in an ATC system from a human factors perspective, and conclude by identifying certain measures by which to address these problems. This research focuses on the analysis of air traffic controllers' tasks for en route ATC and modelling controllers' cognitive processes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper reports part of a qualitative study into evolving practice in the implementation of the Dispute Adjudication Board (DAB) construction dispute resolution technique, a variant of the Dispute Review Board (DRB) concept used in the US and Canada. Data was collected through a focus group interview of 20 highly experienced dispute resolution practitioners from engineering and the law. The group was assembled from members of FIDIC-NET with direct experience of project DABs. The part reported here concerns practice and procedure for establishing DABs. The main findings are that: constitution of the DABs is often delayed because of either project owners' ignorance of the DAB process or deterrence by the cost of the DABs; such owners also tend to insist on appointing DAB members from local engineers and lawyers without sufficient understanding of the DAB process; rates of remuneration of DAB members vary widely; the training provision for DAB membership and advocacy skills is inadequate; the process of selecting candidates for DAB membership and negotiating the tripartite agreement between each member and the contractual parties needs to be navigated with great care to avoid raising ethical problems. The research contribution is threefold. First, it highlights the importance of realistic fees for DAB members within a standard framework in achieving timely establishment of a board that works well as a team. Second, it illustrates the use of qualitative focus group interview to study the impact of new contract terms from multiple stakeholder perspectives. Finally, it identifies areas where further research is needed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The paper presents a theory of the use of buzz-words in academic discourse. It uses economic principles to analyse the incentives to innovate new buzz words and to use existing buzz-words promoted by other people. It argues that the lack of a credible dominant intellectual elite in business studies, combined with the rapid growth of academic employment in business schools, has stimulated an inefficient proliferation of buzz-words in management studies. It argues that this proliferatilon of buzz-words is in danger of bringing the field of study into disrepute.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper will introduce the Baltex research programme and summarize associated numerical modelling work which has been undertaken during the last five years. The research has broadly managed to clarify the main mechanisms determining the water and energy cycle in the Baltic region, such as the strong dependence upon the large scale atmospheric circulation. It has further been shown that the Baltic Sea has a positive water balance, albeit with large interannual variations. The focus on the modelling studies has been the use of limited area models at ultra-high resolution driven by boundary conditions from global models or from reanalysis data sets. The programme has further initiated a comprehensive integration of atmospheric, land surface and hydrological modelling incorporating snow, sea ice and special lake models. Other aspects of the programme include process studies such as the role of deep convection, air sea interaction and the handling of land surface moisture. Studies have also been undertaken to investigate synoptic and sub-synoptic events over the Baltic region, thus exploring the role of transient weather systems for the hydrological cycle. A special aspect has been the strong interests and commitments of the meteorological and hydrological services because of the potentially large societal interests of operational applications of the research. As a result of this interests special attention has been put on data-assimilation aspects and the use of new types of data such as SSM/I, GPS-measurements and digital radar. A series of high resolution data sets are being produced. One of those, a 1/6 degree daily precipitation climatology for the years 1996–1999, is such a unique contribution. The specific research achievements to be presented in this volume of Meteorology and Atmospheric Physics is the result of a cooperative venture between 11 European research groups supported under the EU-Framework programmes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The UK government is mandating the use of building information modelling (BIM) in large public projects by 2016. As a result, engineering firms are faced with challenges related to embedding new technologies and associated working practices for the digital delivery of major infrastructure projects. Diffusion of innovations theory is used to investigate how digital innovations diffuse across complex firms. A contextualist approach is employed through an in-depth case study of a large, international engineering project-based firm. The analysis of the empirical data, which was collected over a four-year period of close interaction with the firm, reveals parallel paths of diffusion occurring across the firm, where both the innovation and the firm context were continually changing. The diffusion process is traced over three phases: centralization of technology management, standardization of digital working practices, and globalization of digital resources. The findings describe the diffusion of a digital innovation as multiple and partial within a complex social system during times of change and organizational uncertainty, thereby contributing to diffusion of innovations studies in construction by showing a range of activities and dynamics of a non-linear diffusion process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The current research agenda for construction process improvement is heavily influenced by the rhetoric of business process re-engineering (BPR). In contrast to the wider literature on BPR, there is little evidence of critical thought within the construction management research community. A postmodernist interpretation is advocated whereby the reality of management practice is defined by the dominant management discourse. The persuasiveness of BPR rhetoric is analysed with particular reference to the way in which it plays on the insecurity of modern managers. Despite the lip service given to ‘empowerment’ and ‘teamwork’, the dominant theme of the re-engineering movement is that of technocratic totalitarianism. From a critical perspective, it is suggested that BPR is imposed on construction organizations to ensure continued control by the industry's dominant power groups. Whilst industry leaders are fond of calling for ‘attitudinal and cultural improvement’, the language of the accepted research agenda continually reinforces the industry's dominant culture of ‘control and command’. Therefore, current research directions in process improvement perpetuate existing attitudes rather than facilitating cultural change. The concept of lean construction is seen to be the latest manifestation of this phenomenon.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Organisations typically define and execute their selected strategy by developing and managing a portfolio of projects. The governance of this portfolio has proved to be a major challenge, particularly for large organisations. Executives and managers face even greater pressures when the nature of the strategic landscape is uncertain. This paper explores approaches for dealing with different levels of certainty in business IT projects and provides a contingent governance framework. Historically business IT projects have relied on a structured sequential approach, also referred to as a waterfall method. There is a distinction between the development stages of a solution and the management stages of a project that delivers the solution although these are often integrated in a business IT systems project. Prior research has demonstrated that the level of certainty varies between development projects. There can be uncertainty on what needs to be developed and also on how this solution should be developed. The move to agile development and management reflects a greater level of uncertainty often on both dimensions and this has led the adoption of more iterative approaches. What has been less well researched is the impact of uncertainty on the governance of the change portfolio and the corresponding implications for business executives. This paper poses this research question and proposes a govemance framework to address these aspects. The governance framework has been reviewed in the context of a major anonymous organisation, FinOrg. Findings are reported in this paper with a focus on the need to apply different approaches. In particular, the governance of uncertain business change is contrasted with the management approach for defined IT projects. Practical outputs from the paper include a consideration of some innovative approaches that can be used by executives. It also investigates the role of the business change portfolio group in evaluating and executing the appropriate level of governance. These results lead to recommendations for executives and also proposed further research.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper describes an assessment of the nitrogen and phosphorus dynamics of the River Kennet in the south east of England. The Kennet catchment (1200 km(2)) is a predominantly groundwater fed river impacted by agricultural and sewage sources of nutrient (nitrogen and phosphorus) pollution. The results from a suite of simulation models are integrated to assess the key spatial and temporal variations in the nitrogen (N) and phosphorus (P) chemistry, and the influence of changes in phosphorous inputs from a Sewage Treatment Works on the macrophyte and epiphyte growth patterns. The models used are the Export Co-efficient model, the Integrated Nitrogen in Catchments model, and a new model of in-stream phosphorus and macrophyte dynamics: the 'Kennet' model. The paper concludes with a discussion on the present state of knowledge regarding the water quality functioning, future research needs regarding environmental modelling and the use of models as management tools for large, nutrient impacted riverine systems. (C) 2003 IMACS. Published by Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Standard form contracts are typically developed through a negotiated consensus, unless they are proffered by one specific interest group. Previously published plans of work and other descriptions of the processes in construction projects tend to focus on operational issues, or they tend to be prepared from the point of view of one or other of the dominant interest groups. Legal practice in the UK permits those who draft contracts to define their terms as they choose. There are no definitive rulings from the courts that give an indication as to the detailed responsibilities of project participants. The science of terminology offers useful guidance for discovering and describing terms and their meanings in their practical context, but has never been used for defining terms for responsibilities of participants in the construction project management process. Organizational analysis enables the management task to be deconstructed into its elemental parts in order that effective organizational structures can be developed. Organizational mapping offers a useful technique for reducing text-based descriptions of project management roles and responsibilities to a comparable basis. Research was carried out by means of a desk study, detailed analysis of nine plans of work and focus groups representing all aspects of the construction industry. No published plan of work offers definitive guidance. There is an enormous amount of variety in the way that terms are used for identifying responsibilities of project participants. A catalogue of concepts and terms (a “Terminology”) has been compiled and indexed to enable those who draft contracts to choose the most appropriate titles for project participants. The purpose of this terminology is to enable the selection and justification of appropriate terms in order to help define roles. The terminology brings an unprecedented clarity to the description of roles and responsibilities in construction projects and, as such, will be helpful for anyone seeking to assemble a team and specify roles for project participants.