27 resultados para Buildings -- Repair and reconstruction

em CentAUR: Central Archive University of Reading - UK


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Aircraft Maintenance, Repair and Overhaul (MRO) feedback commonly includes an engineer’s complex text-based inspection report. Capturing and normalizing the content of these textual descriptions is vital to cost and quality benchmarking, and provides information to facilitate continuous improvement of MRO process and analytics. As data analysis and mining tools requires highly normalized data, raw textual data is inadequate. This paper offers a textual-mining solution to efficiently analyse bulk textual feedback data. Despite replacement of the same parts and/or sub-parts, the actual service cost for the same repair is often distinctly different from similar previously jobs. Regular expression algorithms were incorporated with an aircraft MRO glossary dictionary in order to help provide additional information concerning the reason for cost variation. Professional terms and conventions were included within the dictionary to avoid ambiguity and improve the outcome of the result. Testing results show that most descriptive inspection reports can be appropriately interpreted, allowing extraction of highly normalized data. This additional normalized data strongly supports data analysis and data mining, whilst also increasing the accuracy of future quotation costing. This solution has been effectively used by a large aircraft MRO agency with positive results.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main objectives of this paper are to: firstly, identify key issues related to sustainable intelligent buildings (environmental, social, economic and technological factors); develop a conceptual model for the selection of the appropriate KPIs; secondly, test critically stakeholder's perceptions and values of selected KPIs intelligent buildings; and thirdly develop a new model for measuring the level of sustainability for sustainable intelligent buildings. This paper uses a consensus-based model (Sustainable Built Environment Tool- SuBETool), which is analysed using the analytical hierarchical process (AHP) for multi-criteria decision-making. The use of the multi-attribute model for priority setting in the sustainability assessment of intelligent buildings is introduced. The paper commences by reviewing the literature on sustainable intelligent buildings research and presents a pilot-study investigating the problems of complexity and subjectivity. This study is based upon a survey perceptions held by selected stakeholders and the value they attribute to selected KPIs. It is argued that the benefit of the new proposed model (SuBETool) is a ‘tool’ for ‘comparative’ rather than an absolute measurement. It has the potential to provide useful lessons from current sustainability assessment methods for strategic future of sustainable intelligent buildings in order to improve a building's performance and to deliver objective outcomes. Findings of this survey enrich the field of intelligent buildings in two ways. Firstly, it gives a detailed insight into the selection of sustainable building indicators, as well as their degree of importance. Secondly, it tesst critically stakeholder's perceptions and values of selected KPIs intelligent buildings. It is concluded that the priority levels for selected criteria is largely dependent on the integrated design team, which includes the client, architects, engineers and facilities managers.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this article is to review the scientific literature on airflow distribution systems and ventilation effectiveness to identify and assess the most suitable room air distribution methods for various spaces. In this study, different ventilation systems are classified according to specific requirements and assessment procedures. This study shows that eight ventilation methods have been employed in the built environment for different purposes and tasks. The investigation shows that numerous studies have been carried out on ventilation effectiveness but few studies have been done regarding other aspects of air distribution. Amongst existing types of ventilation systems, the performance of each ventilation methods varies from one case to another due to different usages of the ventilation system in a room and the different assessment indices used. This review shows that the assessment of ventilation effectiveness or efficiency should be determined according to each task of the ventilation system, such as removal of heat, removal of pollutant, supply fresh air to the breathing zone or protecting the occupant from cross infection. The analysis results form a basic framework regarding the application of airflow distribution for the benefit of designers, architects, engineers, installers and building owners.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is a lack of knowledge base in relation to experiences gained and lessons learnt from previously executed National Health Service (NHS) infrastructure projects in the UK. This is in part a feature of one-off construction projects, which typify healthcare infrastructure, and in part due to the absence of a suitable method for conveying such information. The complexity of infrastructure delivery process in the NHS makes the construction of healthcare buildings a formidable task. This is particularly the case for the NHS trusts who have little or no experience of construction projects. To facilitate understanding a most important aspect of the delivery process, which is the preparation of a capital investment proposal; steps taken in developing the business case for an NHS healthcare facility are examined. The context for such examination is provided by the planning process of a healthcare project, studied retrospectively. The process is analysed using a social science based method called ‘building stories’, developed at the University of California-Berkeley. By applying this method, stories or narratives are constructed around the data captured on the case study. The findings indicate that the business case process may be used to justify, rather than identify, trusts’ requirements. The study is useful for UK public sector clients as well as consultants and professionals who aim to participate in the delivery of healthcare infrastructure projects in the UK.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to investigate the concepts of intelligent buildings (IBs), and the opportunities offered by the application of computer-aided facilities management (CAFM) systems. Design/methodology/approach – In this paper definitions of IBs are investigated, particularly definitions that are embracing open standards for effective operational change, using a questionnaire survey. The survey further investigated the extension of CAFM to IBs concepts and the opportunities that such integrated systems will provide to facilities management (FM) professionals. Findings – The results showed variation in the understanding of the concept of IBs and the application of CAFM. The survey showed that 46 per cent of respondents use a CAFM system with a majority agreeing on the potential of CAFM in delivery of effective facilities. Research limitations/implications – The questionnaire survey results are limited to the views of the respondents within the context of FM in the UK. Practical implications – Following on the many definitions of an IB does not necessarily lead to technologies of equipment that conform to an open standard. This open standard and documentation of systems produced by vendors is the key to integrating CAFM with other building management systems (BMS) and further harnessing the application of CAFM for IBs. Originality/value – The paper gives experience-based suggestions for both demand and supply sides of the service procurement to gain the feasible benefits and avoid the currently hindering obstacles, as the paper provides insight to the current and future tools for the mobile aspects of FM. The findings are relevant for service providers and operators as well.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Objective: To determine whether attractiveness and success of surgical outcome differ according to the timing of cleft lip repair. Design: Three experiments were conducted: (1) surgeons rated postoperative medical photographs of infants having either neonatal or 3-month lip repair; (2) lay panelists rated the same photographs; (3) lay panelists rated dynamic video displays of the infants made at 12 months. Normal comparison infants were also rated. The order of stimuli was randomized, and panelists were blind to timing of lip repair and the purposes of the study. Setting: Four U.K. regional centers for cleft lip and palate. Participants: Infants with isolated clefts of the lip, with and without palate. Intervention: Early lip repair was conducted at median age 4 days (inter-quartile range [IQR] = 4), and late repair at 104 days (IQR = 57). Main Outcome Measures: Ratings of surgical outcome (Experiment 1 only) and attractiveness (all experiments) on 5-point Likert scales. Results: In Experiment 1 success of surgical outcome was comparable for early and late repair groups (difference = -0.08; 95% confidence interval [CI] = -0.43 to 0.28; p = .66). In all three experiments, attractiveness ratings were comparable for the two groups. Differences were, respectively, 0.10 (95% CI = -2.3 to 0.44, p = .54); -0.11 (95% CI = -0.42 to -0.19, p = .54); and 0.08 (95% CI = -0.11 to 0.28, p =.41). Normal infants were rated more attractive than index infants (difference = 0.38; 95% CI = 0.24 to 0.52; p < .001). Conclusion: Neonatal repair for cleft of the lip confers no advantage over repair at 3 months in terms of perceived infant attractiveness or success of surgical outcome.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Paleosols were exposed in sections through four abandoned pre-Hispanic agricultural terraces surrounding an infilled mire basin in the southern Peruvian Andes. The two paleosols beneath the Tocotoccasa terrace represent the original ‘natural’ solum and a later soil formed after construction of the agricultural terrace, probably during the early Middle Horizon cultural period (615–695 AD). The soil at the current surface developed subsequent to the building up and reconstruction of the terrace, possibly during the late Late Intermediate period (1200–1400 AD). Micromorphology revealed an unexpected abundance of clay coatings within the upper terrace paleosol and surface terrace soil, a phenonemon attributed to the migration and/or accumulation of neoformed clay produced from the weathering of very unstable volcanic clasts, perhaps fuelled by arid/humid climatic oscillations and/or seasonal input of irrigation waters. The paleosols at Tocotoccasa could not be correlated with any degree of confidence with those beneath the other three terraces due to differences in pedosedimentary properties and uncertainties over chronological controls. Thus, it seems likely that either the terraces were (re)constructed and utilised over different cultural periods or that there is significant variation in the extent of weathering of material used for reconstruction of the terraces. Unfortunately, it cannot be ascertained from the data available whether the terraces were abandoned for any significant period of time prior to reconstruction and, if so, whether this was a regional phenomenon related to climate, social, or economic changes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building designs regularly fail to achieve the anticipated levels of in-use energy consumption. The interaction of occupants with building controls is often cited as a key factor behind this discrepancy. This paper examines whether one factor in inadvertent energy consumption might be the appearance of post-completion errors (when an intended action is not taken because a primary goal has already been accomplished) in occupants’ interactions with building controls. Post-completion errors have been widely studied in human-computer interaction but the concept has not previously been applied to the interaction of occupants with building controls. Two experiments were carried out to examine the effect of incorporating two different types of simple prompt to reduce post-completion error in the use of light switches in office meeting rooms. Results showed that the prompts were effective and that occupants switched off lights when leaving the room more often when presented with a normative prompt than with a standard injunction. Additionally, an over reliance on PIR sensors to turn off lights after meetings was observed, which reduced their intended energy savings. We conclude that achieving low carbon buildings in practice is not solely a technological issue and that application of user-models from human-computer interaction will encourage appropriate occupant interaction with building controls and help reduce inadvertent energy consumption.