233 resultados para Building units
em CentAUR: Central Archive University of Reading - UK
Resumo:
Four new antimony sulphides, [T(dien)(2)]Sb6S10 center dot xH(2)O [T = Ni (1), Co (2) x approximate to 0.45], [Co(en)(3)]SbsSI(3) (3) and [Ni(en)(3)]Sb12S19 (4), have been synthesised under solvothermal conditions. In compounds (1) - (3), Sb12S228- secondary building units are connected to form layered structures. In (1) and (2), Sb-6 S-2- layers containing Sb16S16 heterorings are separated by [T(dien]2](2+) cations, whilst in (3), Sb8 S2- layers 10 13 contain [Co(en)3]2+ cations within large Sb22S22 pores. Compound (4) adopts a three-dimensional structure in which [Ni(en)3 12 cations lie within ca. 5 A wide channels. (c) 2007 Elsevier Ltd. All rights reserved.
Resumo:
The structures Of four alkali-metal copper (I) cyanides, KCu2(CN)(3)(H2O)-H-.-II (I), K2Cu3(CN)(5) (II), CsCu3(CN)(4) (III) and KCu3(CN)(4) (IV) are described. Three of these, ((II)-(IV)), with previously unknown ACN:CuCN ratios have new copper-cyanide frameworks, whilst (1) is a new polymorph of KCu2(CN)(3)(H2O)-H-.. These structures are discussed in terms of assembly from the simple building units Cu(CN)(2/2), Cu(CN)(3/2), Cu(CN)(2/2)(CN)(1/1) and Cu(CN)(4/2). Compounds (I), (II) and (III) are layered materials based on (6,3) nets containing (CuCN)(6) rings (I) and (CuCN)(8) rings (II) and (III). In compound (IV), (4,4) nets containing (CuCN)(12) rings link to generate a three-dimensional network. Both (III) and (IV) are examples of interpenetrating solids in which two and four identical networks interweave, respectively. These materials illustrate the structural versatility of copper (I) in cyanide frameworks. (c) 2006 Elsevier SAS. All rights reserved.
Resumo:
Turbulence statistics obtained by direct numerical simulations are analysed to investigate spatial heterogeneity within regular arrays of building-like cubical obstacles. Two different array layouts are studied, staggered and square, both at a packing density of λp=0.25 . The flow statistics analysed are mean streamwise velocity ( u− ), shear stress ( u′w′−−−− ), turbulent kinetic energy (k) and dispersive stress fraction ( u˜w˜ ). The spatial flow patterns and spatial distribution of these statistics in the two arrays are found to be very different. Local regions of high spatial variability are identified. The overall spatial variances of the statistics are shown to be generally very significant in comparison with their spatial averages within the arrays. Above the arrays the spatial variances as well as dispersive stresses decay rapidly to zero. The heterogeneity is explored further by separately considering six different flow regimes identified within the arrays, described here as: channelling region, constricted region, intersection region, building wake region, canyon region and front-recirculation region. It is found that the flow in the first three regions is relatively homogeneous, but that spatial variances in the latter three regions are large, especially in the building wake and canyon regions. The implication is that, in general, the flow immediately behind (and, to a lesser extent, in front of) a building is much more heterogeneous than elsewhere, even in the relatively dense arrays considered here. Most of the dispersive stress is concentrated in these regions. Considering the experimental difficulties of obtaining enough point measurements to form a representative spatial average, the error incurred by degrading the sampling resolution is investigated. It is found that a good estimate for both area and line averages can be obtained using a relatively small number of strategically located sampling points.
Resumo:
The research record on the quantification of sediment transport processes in periglacial mountain environments in Scandimvia dates back to the 1950s. A wide range of measurements is. available, especially from the Karkevagge region of northern Sweden. Within this paper satellite image analysis and tools provided by geographic information systems (GIS) are exploited in order to extend and improve this research and to complement geophysical methods. The processes of interest include mass movements such as solifluction, slope wash, dirty avalanches and rock-and boulder falls. Geomorphic process units have been derived in order to allow quantification via GIS techniques at a catchment scale. Mass movement rates based on existing Field measurements are employed in the budget calculation. In the Karkevagge catch ment. 80% of the area can be identified either as a source area for sediments or as a zone where sediments are deposited. The overall budget for the slopes beneath the rockwalls in the Karkevagge is approximately 680 t a(-1) whilst about 150 : a-1 are transported into the fluvial System.
Resumo:
The foraminiferal-rich pelagic Bateig Limestone forms several varieties of the important building stones quarried at Bateig Hill in southeastern Spain. Three principal ichnofabrics (Bichordites, mottled-Palaeophycus and mottled-Ophiomorpha) are recognized, which are present in at least two (possibly up to four) repeated successions (cycles). Each succession begins with an erosional event. The Bichordites ichnofabric represents a new type of facies, formed as thin turbidity/grain flow, stratiform units derived from sediment slips off a fault into deep water. Each slipped unit became almost completely bioturbated by infaunal echinoids, colonizing by lateral migration. Because of the thinness of the units, successive colonizations tended to truncate the underlying burrows giving rise to a pseudo-stratification. As the Bichordites ichnofabric accumulated on the fault apron, thus reducing the effective height of the fault scarp, the substrate gradually came under the influence of currents traversing the shelf. This led to a change in hydraulic regime, and to the mottled-Palaeophycus and mottled-Ophiomorpha ichnofabrics in sediment deposited under bed load transport, and associated with laminar and cross-stratified beds and local muddy intervals. Reactivation of the fault triggered erosion and channeling and a return to grain flow sedimentation, and to the Bichordites ichnofabric of the succeeding cycle. The highest unit of the Bateig Limestone is formed entirely of cross-stratified calcarenites with occasional Ophiomorpha (Ophiomorpha-primary lamination ichnofabric) and is similar to many shallow marine facies but they still bear a significant content of pelagic foraminifera. The sedimentary setting bears resemblance with that described for the Pleistocene Monte Torre Paleostrait and the modem Strait of Messina (Italy), where the narrow morphology of the depositional area enhanced tidal currents and allowed for high-energy sandy deposition in relatively deep areas. More data on the Miocene paleogeography of the Bateig area should provide further testing for this hypothesis. The ichnofacies and stacking of the Bateig Limestone differ from the classic Seilacherian model in that they reflect changes in hydraulic process and are associated with faulting and subsidence and changes in sediment supply. Recognition of the unusual ichnofabrics and their relationships provides a clear indication of the overall dynamic setting. (c) 2006 Elsevier B.V. All rights reserved.
Resumo:
The delineation of Geomorphic Process Units (GPUs) aims to quantify past, current and future geomorphological processes and the sediment flux associated with them. Five GPUs have been identified for the Okstindan area of northern Norway and these were derived from the combination of Landsat satellite imagery (TM and ETM+) with stereo aerial photographs (used to construct a Digital Elevation Model) and ground survey. The Okstindan study area is sub-arctic and mountainous and is dominated by glacial and periglacial processes. The GPUs exclude the glacial system (some 37% of the study area) and hence they are focussed upon periglacial and colluvial processes. The identified GPUs are: 1. solifluction and rill erosion; 2. talus creep, slope wash and rill erosion; 3. accumulation of debris by rock and boulder fall; 4. rockwalls; and 5. stable ground with dissolved transport. The GPUs have been applied to a ‘test site’ within the study area in order to illustrate their potential for mapping the spatial distribution of geomorphological processes. The test site within the study area is a catchment which is representative of the range of geomorphological processes identified.
Resumo:
This paper uses a Foucauldian governmentality framework to analyse and interrogate the discourses and strategies adopted by the state and sections of the business community in their attempts to shape and influence emerging agendas of governance in post-devolution Scotland. Much of the work on governmentality has examined the ways in which governments have developed particular techniques, rationales and mechanisms to enable the functioning of governance programmes. This paper expands upon such analyses by also looking at the ways in which particular interests may use similar procedures, discourses and practices to promote their own agendas and develop new forms of resistance, contestation and challenge to emerging policy frameworks. Using the example of business interest mobilization in post-devolution Scotland, it is argued that governments may seek to mobilize defined forms of expertise and knowledge, linking them to wider political debates. This, however, creates new opportunities for interests to shape and contest the discourses and practices of government. The governmentalization of politics can, therefore, be seen as more of a dialectical process of definition and contestation than is often apparent in existing Foucault-inspired writing.
Resumo:
The principles of organization theory are applied to the organization of construction projects. This is done by proposing a framework for modelling the whole process of building procurement. This consists of a framework for describing the environments within which construction projects take place. This is followed by the development of a series of hypotheses about the organizational structure of construction projects. Four case studies are undertaken, and the extent to which their organizational structure matches the model is compared to the level of success achieved by each project. To this end there is a systematic method for evaluating the success of building project organizations, because any conclusions about the adequacy of a particular organization must be related to the degree of success achieved by that organization. In order to test these hypotheses, a mapping technique is developed. The technique offered is a development of a technique known as Linear Responsibility Analysis, and is called "3R analysis" as it deals with roles, responsibilities and relationships. The analysis of the case studies shows that they tended to suffer due to inappropriate organizational structure. One of the prevailing problems of public sector organization is that organizational structures are inadequately defined, and too cumbersome to respond to environmental demands on the project. The projects tended to be organized as rigid hierarchies, particularly at decision points, when what was required was a more flexible, dynamic and responsive organization. The study concludes with a series of recommendations; including suggestions for increasing the responsiveness of construction project organizations, and reducing the lead-in times for the inception periods.
Resumo:
There is a clear need for financial protection in the construction industry, both to guarantee satisfactory completion of construction projects and to guard against non-payment. However, the cost of financial protection is often felt to be disproportionately high, with unnecessary overlap between different measures. The Reading Construction Forum has commissioned and steered research which is published in this report in an effort to bring the problem out into the open and to clarify the various options open to the various parties and stakeholders in the construction process. "Financial Protection in the UK Building Industry" is the first definitive report on the subject, offering an accurate and simple guide that all levels within the construction industry can understand. This accessible new guide considers the problem of financial protection and clearly lays out the alternative solutions.It looks by turn at the client, the main contractor, and the sub-contractor, discussing which financial protection options are available to each of them, and considers the pros and cons of each option. The cost of each type of financial protection is weighed against the amount of protection provided and the risks involved. The book concludes with guidance for consultants, emphasising relevant points to consider when advising clients and contractors about which type of financial protection to choose. "Financial Protection in the UK Building Industry" was researched by a literature search, collection of statistical data, and financial data, as well as discussions with clients, contractors, sub-contractors and consultants. This investigation has shown that the direct costs of implementing financial protection measures are marginal, and that wider adoption of payment protection would create a more equitable situation between contracting parties.This guide will enable anyone in the construction industry to consider all the options, and determine what is the best solution for them. "Reading Construction Forum Financial Protection for the UK Building Industry" was complied by the University of Reading, funded by the Reading Construction Forum. The Forum has recently commissioned and steered a number of high-profile reports covering important aspects of the construction industry. Members of the Forum include major companies which are concerned with achieving high quality in the design, construction and use of commercial, retail and industrial buildings. All are committed to change and innovation in the British and European construction industries.
Resumo:
Financial Protection in the UK Building Industry provides comprehensive treatment of a complex aspect of construction management which is increasingly important in modern construction contracts. The term 'Financial Protection' refers to refers to the various mechanisms by which funds are made available to ensure the due performance of a partys contractual obligations. This book is based on material written for a research project funded by the Reading Construction Forum. Financial Protection in the UK Building Industry looks at the legal and economic background to the problem of providing financial protection to clients to guard against poor performance and or the insolvency of contractors, consultants and sub-contractors. The inclusion of practical guidance notes and summaries makes this a valuable guide for the construction professional as well as for the researcher. * provides in-depth analysis of financial protection measures * explores the ways in which financial protection can increase efficiency in the industry * financial protection in construction is beset with problems - this book points toward practical solutions