3 resultados para Budget Planning
em CentAUR: Central Archive University of Reading - UK
Resumo:
One of the most challenging tasks in financial management for large governmental and industrial organizations is Planning and Budgeting (P&B). The processes involved with P&B are cost and time intensive, especially when dealing with uncertainties and budget adjustments during the planning horizon. This work builds on our previous research in which we proposed and evaluated a fuzzy approach that allows optimizing the budget interactively beyond the initial planning stage. In this research we propose an extension that handles financial stress (i.e. drastic budget cuts) occurred during the budget period. This is done by introducing fuzzy stress parameters which are used to re-distribute the budget in order to minimize the negative impact of the financial stress. The benefits and possible issues of this approach are analyzed critically using a real world case study from the Nuremberg Institute of Technology (NIT). Additionally, ongoing and future research directions are presented.
Resumo:
This paper describes the formulation of a new urban scheme, MORUSES (Met Office–Reading Urban Surface Exchange Scheme) for use in the Met Office Unified Model. The implementation of the new scheme ensures that (1) the new scheme offers more flexibility in the parametrization of the building properties, and hence provides a more realistic representation of the fluxes; (2) the bulk outputs are in satisfactory agreement with previous observational studies; and (3) the impact of the new scheme on the energy balance fluxes is similar to the impact of the current urban scheme when set up to mimic it. As well as having a better physical basis, MORUSES also gains in flexibility in applications and adaptations to different urban materials as well as urban planning. The new scheme represents the urban area as a composition of two tiles, a canyon and a roof, using a simple 2D geometry. Sensitivity analysis to canyon geometry and thickness of the roof canopy emphasizes the gain in flexibility captured by the new scheme. Copyright © 2010 Royal Meteorological Society and Crown Copyright