99 resultados para BIM Implementation

em CentAUR: Central Archive University of Reading - UK


Relevância:

40.00% 40.00%

Publicador:

Resumo:

The construction industry is widely being criticised as a fragmented industry. There are mounting calls for the industry to change. The espoused change calls for collaboration as well as embracing innovation in the process of design, construction and across the supply chain. Innovation and the application of emerging technologies are seen as enablers for integrating the processes ‘integrating the team’ such as building information modelling (BIM). A questionnaire survey was conducted to ascertain change in construction with regard to design management, innovation and the application of BIM as cutting edge pathways for collaboration. The respondents to the survey were from an array of designations across the construction industry such as construction managers, designers, engineers, design coordinators, design managers, architects, architectural technologists and surveyors. There was a general agreement by most respondents that the design team was responsible for design management in their organisation. There is a perception that the design manager and the client are the catalyst for advancing innovation. The current state of industry in terms of incorporating BIM technologies is posing a challenge as well as providing an opportunity for accomplishment. BIM technologies provide a new paradigm shift in the way buildings are designed, constructed and maintained. This paradigm shift calls for rethinking the curriculum for educating building professionals, collectively.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Numerous Building Information Modelling (BIM) tools are well established and potentially beneficial in certain uses. However, issues of adoption and implementation persist, particularly for on-site use of BIM tools in the construction phase. We describe an empirical case-study of the implementation of an innovative ‘Site BIM’ system on a major hospital construction project. The main contractor on the project developed BIM-enabled tools to allow site workers using mobile tablet personal computers to access design information and to capture work quality and progress data on-site. Accounts show that ‘Site BIM’, while judged to be successful and actively supporting users, was delivered through an exploratory and emergent development process of informal prototyping. Technical IT skills were adopted into the construction project through personal relationships and arrangements rather than formal processes. Implementation was driven by construction project employees rather than controlled centrally by the corporate IT function.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We give an overview on the development of "horizontal" European Committee for Standardisation (CEN) standards for characterising soils, sludges and biowaste in the context of environmental legislation in the European Union (EU). We discuss the various steps in the development of a horizontal standard (i.e. assessment of the possibility of such a standard, review of existing normative documents, pre-normative testing and validation) and related problems. We also provide a synopsis of European and international standards covered by the so-called Project HORIZONTAL. (C) 2004 Elsevier Ltd. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes the design, implementation and characterisation of a contactless power transfer system for rotating applications. The power transfer system is based upon a zero-voltage-switched, full-bridge, DC-DC converter, but utilises a non-standard transformer. This transformer allows power transfer between its primary and secondary windings while also allowing free rotation between these windings. The aim of this research is to develop a solution that could replace mechanical slip-rings in certain applications where a non-contacting system would be advantageous. Based upon the design method presented in this paper, a 2 kW prototype system is constructed. Results obtained from testing the 2 kW prototype are presented and discussed. This discussion considers how the performance of the transformer varies with rotation and also the overall efficiency of the system

Relevância:

20.00% 20.00%

Publicador:

Resumo:

iLearn is a Web 2.0 tool developed in Blackboard to help students with Personal Development Planning (PDP). This paper describes a case study on how the innovative use of mobile digital technology in iLearn e-Portfolio for developing reflective portfolios for PDP benefits the students. The e-Portfolio tool benefits students as it enables them to create and share portfolios, record achievements and reflections that support future job applications and promotion. Students find it beneficial because they can make use of iLearn e-Portfolio to keep academic records and achievements, activities and interests, work experience, reflective practice, employer information and some other useful resources, and also to tailor their CV and covering letters including evidence to support their CV, transferable skills and selling points. Useful information for preparing for an interview, reflecting after an event and any thoughts and evaluation can be kept in iLearn e-Portfolio. Keeping assessment and feedback records in iLearn e-Portfolio enables students to know their progress, to identify any gaps they need to fill to develop their study practices and areas for development. The key points from the feedback on the assignments and assessments are beneficial for future improvement. The reflections on the assignments and how students make use of the advice are particularly useful to improve their overall performance. In terms of pedagogical benefits, the “Individual Learner Profile” records and reviews evidence in verbal communication, basic and higher academic skills, time management, numeracy skill and IT skills, students become increasingly aware of their own strengths and any weaker areas that may require development. The e-Portfolio also provides opportunity for students to reflect on the experience and skills they have gained whilst participating in activities outside their studies. As the iLearn e-Portfolio is a reflective practice tool, it is consistent with the principle of Schon's reflective practitioner to reframe problems and to explore the consequences of actions. From the students’ feedback, for those who engage regularly in iLearn, they are better able to set agendas for their Personal Tutorial meetings and provide their Personal Tutor with a unique record of their achievements, skills and attributes which help them writing effective references for them. They make the most of their student experience in general. They also enhance their transferable skills and employability overall. The iLearn e-Portfolio prepares for the workplace and life beyond University including continuing professional development. Students are aware of their transferable skills, evidence of the skills and skill level, including award or accreditation, and their personal reflection on their transferable skills. It is beneficial for students to be aware of their transferable skills, to produce evidence of the skills and skills level such as award and accreditation, and to record their personal reflection on their transferable skills. Finally, the innovative use of mobile digital technology in iLearn e-Portfolio for developing reflective portfolios for PDP will improve their employability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Smooth flow of production in construction is hampered by disparity between individual trade teams' goals and the goals of stable production flow for the project as a whole. This is exacerbated by the difficulty of visualizing the flow of work in a construction project. While the addresses some of the issues in Building information modeling provides a powerful platform for visualizing work flow in control systems that also enable pull flow and deeper collaboration between teams on and off site. The requirements for implementation of a BIM-enabled pull flow construction management software system based on the Last Planner System™, called ‘KanBIM’, have been specified, and a set of functional mock-ups of the proposed system has been implemented and evaluated in a series of three focus group workshops. The requirements cover the areas of maintenance of work flow stability, enabling negotiation and commitment between teams, lean production planning with sophisticated pull flow control, and effective communication and visualization of flow. The evaluation results show that the system holds the potential to improve work flow and reduce waste by providing both process and product visualization at the work face.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In a sequential clinical trial, accrual of data on patients often continues after the stopping criterion for the study has been met. This is termed “overrunning.” Overrunning occurs mainly when the primary response from each patient is measured after some extended observation period. The objective of this article is to compare two methods of allowing for overrunning. In particular, simulation studies are reported that assess the two procedures in terms of how well they maintain the intended type I error rate. The effect on power resulting from the incorporation of “overrunning data” using the two procedures is evaluated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bayesian decision procedures have recently been developed for dose escalation in phase I clinical trials concerning pharmacokinetic responses observed in healthy volunteers. This article describes how that general methodology was extended and evaluated for implementation in a specific phase I trial of a novel compound. At the time of writing, the study is ongoing, and it will be some time before the sponsor will wish to put the results into the public domain. This article is an account of how the study was designed in a way that should prove to be safe, accurate, and efficient whatever the true nature of the compound. The study involves the observation of two pharmacokinetic endpoints relating to the plasma concentration of the compound itself and of a metabolite as well as a safety endpoint relating to the occurrence of adverse events. Construction of the design and its evaluation via simulation are presented.