27 resultados para BID

em CentAUR: Central Archive University of Reading - UK


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Research into the topic of liquidity has greatly benefited from the availability of data. Although bid-ask spreads were inaccessible to researchers, Roll (1984) provided a conceptual model that estimated the effective bid-ask prices from regular time series data, recorded on a daily or longer interval. Later data availability improved and researchers were able to address questions regarding the factors that influenced the spreads and the relationship between spreads and risk, return and liquidity. More recently transaction data have been used to measure the effective spread and researchers have been able to refine the concepts of liquidity to include the impact of transactions on price movements (Clayton and McKinnon, 2000) on a trade-by-trade analysis. This paper aims to use techniques that combine elements from all three approaches and, by studying US data over a relatively long time period, to throw light on earlier research as well as to reveal the changes in liquidity over the period controlling for extraneous factors such as market, age and size of REIT. It also reveals some comparable results for the UK market over the same period.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Research on the topic of liquidity has greatly benefited from the improved availability of data. Researchers have addressed questions regarding the factors that influence bid-ask spreads and the relationship between spreads and risk, return and liquidity. Intra-day data have been used to measure the effective spread and researchers have been able to refine the concepts of liquidity to include the price impact of transactions on a trade-by-trade analysis. The growth in the creation of tax-transparent securities has greatly enhanced the visibility of securitized real estate, and has naturally led to the question of whether the increased visibility of real estate has caused market liquidity to change. Although the growth in the public market for securitized real estate has occurred in international markets, it has not been accompanied by universal publication of transaction data. Therefore this paper develops an aggregate daily data-based test for liquidity and applies the test to US data in order to check for consistency with the results of prior intra-day analysis. If the two approaches produce similar results, we can apply the same technique to markets in which less detailed data are available and offer conclusions on the liquidity of a wider set of markets.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Noncompetitive bids have recently become a major concern in both public and private sector construction contract auctions. Consequently, several models have been developed to help identify bidders potentially involved in collusive practices. However, most of these models require complex calculations and extensive information that is difficult to obtain. The aim of this paper is to utilize recent developments for detecting abnormal bids in capped auctions (auctions with an upper bid limit set by the auctioner) and extend them to the more conventional uncapped auctions (where no such limits are set). To accomplish this, a new method is developed for estimating the values of bid distribution supports by using the solution to what has become known as the German Tank problem. The model is then demonstrated and tested on a sample of real construction bid data, and shown to detect cover bids with high accuracy. This paper contributes to an improved understanding of abnormal bid behavior as an aid to detecting and monitoring potential collusive bid practices.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Dog-in-a-Doublet Bridge Reconstruction Scheme integrates the interdisciplinary design to provide solution for different needs: to provide a crossing to carry the new 40-tonne loading requirement, to improve the visibility of the substandard junction, and within the funding available. The management of the project involves the co-ordination of different authorities, statutory undertakers and other bodies. At certain stages, there were negotiations with RSPB on the restriction of construction period from July to November. After the re-assessment of the environmental impact of the construction on the breeding and wintering birds, the restrict was waived. As the bid for the assessment, strengthening and structural maintenance of bridges in the Cambridgeshire County Council Transport Policies and Programme No. 21 (1995/96) for Dog-in-a-Doublet Bridge Reconstruction Schemes was unsuccessful to attract the Transport Supplement Grant (TSG). A series of temporary measures had to be undertaken until funding is available for its replacement.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A new approach is presented that simultaneously deals with Misreporting and Don't Know (DK) responses within a dichotomous-choice contingent valuation framework. Utilising a modification of the standard Bayesian Probit framework, a Gibbs with Metropolis-Hastings algorithm is used to estimate the posterior densities for the parameters of interest. Several model specifications are applied to two contingent valuation datasets: one on wolf management plans, and one on the US Fee Demonstration Program. We find that DKs are more likely to be from people who would be predicted to have positive utility for the bid. Therefore, a DK is more likely to be a YES than a NO. We also find evidence of misreporting, primarily in favour of the NO option. The inclusion of DK responses has an unpredictable impact on willingness-to-pay estimates, since it impacts differently on the results for the two datasets we examine. Copyright (C) 2009 John Wiley & Sons, Ltd.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In the tender process, contractors often rely on subcontract and supply enquiries to calculate their bid prices. However, this integral part of the bidding process is not empirically articulated in the literature. Over 30 published materials on the tendering process of contractors that talk about enquiries were reviewed and found to be based mainly on experiential knowledge rather than systematic evidence. The empirical research here helps to describe the process of enquiries precisely, improve it in practice, and have some basis to support it in theory. Using a live participant observation case study approach, the whole tender process was shadowed in the offices of two of the top 20 UK civil engineering construction firms. This helped to investigate 15 research questions on how contractors enquire and obtain prices from subcontractors and suppliers. Forty-three subcontract enquiries and 18 supply enquiries were made across two different projects with average value of 7m. An average of 15 subcontract packages and seven supply packages was involved. Thus, two or three subcontractors or suppliers were invited to bid in each package. All enquiries were formulated by the estimator, with occasional involvement of three other personnel. Most subcontract prices were received in an average of 14 working days; and supply prices took five days. The findings show 10 main activities involved in processing enquiries and their durations, as well as wasteful practices associated with enquiries. Contractors should limit their enquiry invitations to a maximum of three per package, and optimize the waiting time for quotations in order to improve cost efficiency.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to show the extent to which clients amend standard form contracts in practice, the locus of the amendments, and how contractors respond to the amendments when putting together a bid. Design/methodology/approach – Four live observational case studies were carried out in two of the top 20 UK construction firms. The whole process used to review the proposed terms and conditions of the contract was shadowed using participant observation, interview and documentary analysis. Findings – All four cases showed strong evidence of amendments relating mostly to payment and contractual aspects: 83 amendments in Case Study 1 (CS1), 80 in CS2, 15 in CS3 and 29 in CS4. This comprised clauses that were modified (37 per cent), substituted (23 per cent), deleted (7 per cent) and new additions (33 per cent). Risks inherent in the amendments were mostly addressed through contractual rather than price mechanisms, to reflect commercial imperatives. “Qualifications” and “clarifications” were included in the tender submissions for post-tender negotiations. Thus, the amendments did not necessarily influence price. There was no evidence of a “standard-form contract“ being used as such, although clients may draw on published “standard-form contracts” to derive the forms of contract actually used in practice. Practical implications – Contractors should pay attention to clauses relating to contractual and financial aspects when reviewing tender documents. Clients should draft equitable payment and contractual terms and conditions to reduce risk of dispute. Indeed, it is prudent for clients not to pass on inestimable risks. Originality/value – A better understanding of the extent and locus of amendments in standard form contracts, and how contractors respond, is provided.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Formal and analytical models that contractors can use to assess and price project risk at the tender stage have proliferated in recent years. However, they are rarely used in practice. Introducing more models would, therefore, not necessarily help. A better understanding is needed of how contractors arrive at a bid price in practice, and how, and in what circumstances, risk apportionment actually influences pricing levels. More than 60 proposed risk models for contractors that are published in journals were examined and classified. Then exploratory interviews with five UK contractors and documentary analyses on how contractors price work generally and risk specifically were carried out to help in comparing the propositions from the literature to what contractors actually do. No comprehensive literature on the real bidding processes used in practice was found, and there is no evidence that pricing is systematic. Hence, systematic risk and pricing models for contractors may have no justifiable basis. Contractors process their bids through certain tendering gateways. They acknowledge the risk that they should price. However, the final settlement depends on a set of complex, micro-economic factors. Hence, risk accountability may be smaller than its true cost to the contractor. Risk apportionment occurs at three stages of the whole bid-pricing process. However, analytical approaches tend not to incorporate this, although they could.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The term commercial management has been used for some time, similarly the job title commercial manager. However, as of yet, little emphasis has been placed on defining. This paper presents the findings from a two-year research initiative that has compared and contrasted the role of commercial managers from a range of organisations and across industry sectors, as a first step in developing a body of knowledge for commercial. It is argued that there are compelling arguments for considering commercial management, not solely as atask undertaken by commercial managers, but as a discipline in itself: a discipline that, arguably, bridges traditional project management and organisational theories. While the study has established differences in approach and application both between and within industry sectors, it has established sufficient similarity and synergy in practice to identify a specific role of commercial management in project-based organisations. These similarities encompass contract management and dispute resolution; the divergences include a greater involvement in financial and value management in construction and in bid management in defence/aerospace.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Diet therapy utilizing probiotics and prebiotics may help treat many common gastrointestinal complaints. From birth to about 2 years of age the human digestive tract changes from sterile to a complex ecosystem with at least 500 bacterial species, most of these are benign and even necessary, however, pathogenic species also colonize the digestive tract. The idea is that prebiotics and probiotics can be used to displace and neutralise these pathogens.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The process of how contractors take account of risk when calculating their bids for construction work is investigated based on preliminary investigations and case studies in Ghana and UK. Ghana and UK were chosen, more or less arbitrarily, for the purpose of case studies, and to test the idea that there are systematic differences between the approaches in different places. Clear differences were found in the risk pricing approaches of contractors in the two countries. The difference appeared to emanate from the professional knowledge and competence of the bid team members, company policy, corporate accountability and the business environments in which the contractors operate. Both groups of contractors take account of risk in estimates. However, risk accountability was found to be higher on the agenda in the tender process of UK contractors, documented more systematically, and assessed and managed more rigorously with input from the whole bid team. Risk accountability takes place at three levels of the tender process and is dictated strongly by market forces and company circumstances.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Income segregation across Melbourne’s residential communities is widening, and at a pace faster than in some other Australian cities. The widening gap between Melbourne’s rich and poor communities raises fears about concentrations of poverty and social exclusion, particularly if the geography of these communities is such that they and their residents are increasingly isolated from urban services and employment centres. Social exclusion in our metropolitan areas and the government responses to it are commonly thought to be the proper domain of social and economic policy. The role of urban planning is typically neglected, yet it helps shape the economic opportunities available to communities in its attempts to influence the geographical location of urban services, infrastructure and jobs. Under the current metropolitan strategy ‘Melbourne 2030’ urban services and transport infrastructure are to be concentrated within Principal Activity Centres spread throughout the metropolitan area and it is the intention that lower-income households should have ready access to these activity centres. However, the Victorian state government has few housing policy instruments to achieve this goal and there are fears that community mix may suffer as house prices and rents are bid up in the vicinity of Principal Activity Centres, and lower-income households are displaced. But are these fears justified by the changing geography of house prices in the metropolitan region? This is the key research question addressed in this paper which examines whether the Victorian practice of placing reliance on the market to deliver affordable housing, while intervening to promote a more compact pattern of urban settlement, is effective.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper examines the realities of community involvement in urban design in the context of a study of the West Itchen Neighbourhood of Southampton, a diverse inner city area accommodating some 7,000 households and 18,000 people. The findings are based on a literature review of community involvement in urban design and case study research into three government supported regeneration projects all located within the study area: a Neighbourhood Renewal Area - designated in 1994; an Estate Action Scheme - implemented between 1993 and 1996; and a Single Regeneration Budget programme - following a successful bid in 1995. The research was undertaken by Helen Gregory in 1997/8 as the basis of a dissertation, supervised by Alan Rowley, submitted for the award of an MPhil in Environmental Planning and Development from The University of Reading.