3 resultados para BIC
em CentAUR: Central Archive University of Reading - UK
Resumo:
The Bahrain International Circuit (BIC) is considered its one of the best international racing car track in terms of technical aspects and architectural quality. Two Formula 1 races have been hosted in the Kingdom of Bahrain, in 2004 and 2005, at BIC. The BIC had recently won the award of the best international racing car circuit. This paper highlights on the elements that contributed to the success of such project starting from the architectural aspects, construction, challenges, tendering process, risk management, the workforce, speed of the construction method, and future prospects for harnessing solar and wind energy for sustainable electrification and production of water for the circuit, i.e. making BIC green and environment-friendly international circuit.
Resumo:
Two unique large buildings in the Kingdom of Bahrain were selected for make-over to sustainable buildings. These are the Almoayyed Tower (the first sky scraper) and the Bahrain International Circuit, BIC (The best world Formula 1 Circuit). The amount of electricity extracted from using renewable energy resource (solar and wind), integrated to the buildings-has been studied thoroughly. For the first building, the total solar electricity from the PV installed at the roof and the 4 vertical facades was found 3 017 500 kWh annually (3 million kWh), i.e. daily energy of 8219 kWh (enough to Supply electricity for 171 houses, each is rated as 2 kW house-in Europe the standard is 1.2 kW). This means that the annual solar electricity produced will be nearly 3 million kWh. This correspond to annual CO, reduction of 3000 t (assuming each kWh of energy from natural gas lead to emission of 1 kg of CO2). For the second building (BIC) the solar electricity from PV panels installed at the roof top, fixed at tilt angle of 26 degrees facing south, will provide annual solar electricity of is 2.8 x 10(6) kWh. The solar electricity from PV panels installed on the windows (12,000 m(2)) will be 45.3 x 10(6) kWh. This means that the total annual electrical power from PV panels (windows and roofs) will be nearly 12 MW (32 kW per day). The CO2 reduction will be 48,000 t. Under the carbon trading or CDM scheme the revenue (or the reward) would be (sic)480,000 million annually (the reward is (sic)10 per tonnes of CO2). The BIC circuit can have diversified electricity supply, i.e. from solar radiation (PV), from solar heat (CSP) and from wind (wind turbines), assuring its sustainability as well as reducing the CO2 emission.
Resumo:
The Bahrain International Circuit (BIC) and complex, at latitude 26.00N and longitude 51.54E, was built in 483 days and cost 150 million US$. The circuit consists of six different individual tracks with a 3.66 km outer track (involving 10 turns) and a 2.55 km inner track (having six turns). The complex has been designed to host a variety of other sporting activities. Fifty thousand spectators, including 10,500 in the main grandstand, can be accommodated simultaneously. State-of-the art on-site media and broadcast facilities are available. The noise level emitted from vehicles on the circuit during the Formula-1 event, on April 4th 2004, was acceptable and caused no physical disturbance to the fans in the VIP lounges or to scholars studying at the University of Bahrain's Shakeir Campus, which is only 1.5 km away from the circuit. The sound-intensity level (SIL) recorded on the balcony of the VIP lounge was 128 dB(A) and was 80 dB(A) inside the lounge. The calculated SIL immediately outside the lecture halls of the University of Bahrain was 70 dB(A) and 65 dB(A) within them. Thus racing at BIC can proceed without significantly disturbing the academic-learning process. The purchased electricity demand by the BIC complex peaked (at 4.5 MW) during the first Formula-1 event on April 4th 2004. The reverse-osmosis (RO) plant at the BIC provides 1000 m(3) of desalinated water per day for landscape irrigation. Renewable-energy inputs, (i.e., via solar and wind power), at the BIC could be harnessed to generate electricity for water desalination, air conditioning, lighting as well as for irrigation. If the covering of the BIC complex was covered by adhesively fixed modern photovoltaic cells, then similar to 1.2 MW of solar electricity could be generated. If two horizontal-axis, at 150 m height above the ground, three 75m bladed, wind turbines were to be installed at the BIC, then the output could reach 4 MW. Furthermore, if 10,000 Jojoba trees (a species renowned for having a low demand for water, needing only five irrigations per year in Bahrain and which remain green throughout the year) are planted near the circuit, then the local micro-climate would be improved with respect to human comfort as well as the local environment becoming cleaner.