5 resultados para Alarms

em CentAUR: Central Archive University of Reading - UK


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Investigations of memory deficits in older individuals have concentrated on their increased likelihood of forgetting events or details of events that were actually encountered (errors of omission). However mounting evidence demonstrates that normal cognitive aging also is associated with an increased propensity for errors of commission-shown in false alarms or false recognition. The present study examined the origins of this age difference. Older and younger adults each performed three types of memory tasks in which details of encountered items might influence performance. Although older adults showed greater false recognition of related lures on a standard (identical) old/new episodic recognition task, older and younger adults showed parallel effects of detail on repetition priming and meaning-based episodic recognition (decreased priming and decreased meaning-based recognition for different relative to same exemplars). The results suggest that the older adults encoded details but used them less effectively than the younger adults in the recognition context requiring their deliberate, controlled use.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents a video surveillance framework that robustly and efficiently detects abandoned objects in surveillance scenes. The framework is based on a novel threat assessment algorithm which combines the concept of ownership with automatic understanding of social relations in order to infer abandonment of objects. Implementation is achieved through development of a logic-based inference engine based on Prolog. Threat detection performance is conducted by testing against a range of datasets describing realistic situations and demonstrates a reduction in the number of false alarms generated. The proposed system represents the approach employed in the EU SUBITO project (Surveillance of Unattended Baggage and the Identification and Tracking of the Owner).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The quality control, validation and verification of the European Flood Alert System (EFAS) are described. EFAS is designed as a flood early warning system at pan-European scale, to complement national systems and provide flood warnings more than 2 days before a flood. On average 20–30 alerts per year are sent out to the EFAS partner network which consists of 24 National hydrological authorities responsible for transnational river basins. Quality control of the system includes the evaluation of the hits, misses and false alarms, showing that EFAS has more than 50% of the time hits. Furthermore, the skills of both the meteorological as well as the hydrological forecasts are evaluated, and are included here for a 10-year period. Next, end-user needs and feedback are systematically analysed. Suggested improvements, such as real-time river discharge updating, are currently implemented.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The incorporation of numerical weather predictions (NWP) into a flood forecasting system can increase forecast lead times from a few hours to a few days. A single NWP forecast from a single forecast centre, however, is insufficient as it involves considerable non-predictable uncertainties and lead to a high number of false alarms. The availability of global ensemble numerical weather prediction systems through the THORPEX Interactive Grand Global Ensemble' (TIGGE) offers a new opportunity for flood forecast. The Grid-Xinanjiang distributed hydrological model, which is based on the Xinanjiang model theory and the topographical information of each grid cell extracted from the Digital Elevation Model (DEM), is coupled with ensemble weather predictions based on the TIGGE database (CMC, CMA, ECWMF, UKMO, NCEP) for flood forecast. This paper presents a case study using the coupled flood forecasting model on the Xixian catchment (a drainage area of 8826 km2) located in Henan province, China. A probabilistic discharge is provided as the end product of flood forecast. Results show that the association of the Grid-Xinanjiang model and the TIGGE database gives a promising tool for an early warning of flood events several days ahead.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Following trends in operational weather forecasting, where ensemble prediction systems (EPS) are now increasingly the norm, flood forecasters are beginning to experiment with using similar ensemble methods. Most of the effort to date has focused on the substantial technical challenges of developing coupled rainfall-runoff systems to represent the full cascade of uncertainties involved in predicting future flooding. As a consequence much less attention has been given to the communication and eventual use of EPS flood forecasts. Drawing on interviews and other research with operational flood forecasters from across Europe, this paper highlights a number of challenges to communicating and using ensemble flood forecasts operationally. It is shown that operational flood forecasters understand the skill, operational limitations, and informational value of EPS products in a variety of different and sometimes contradictory ways. Despite the efforts of forecasting agencies to design effective ways to communicate EPS forecasts to non-experts, operational flood forecasters were often skeptical about the ability of forecast recipients to understand or use them appropriately. It is argued that better training and closer contacts between operational flood forecasters and EPS system designers can help ensure the uncertainty represented by EPS forecasts is represented in ways that are most appropriate and meaningful for their intended consumers, but some fundamental political and institutional challenges to using ensembles, such as differing attitudes to false alarms and to responsibility for management of blame in the event of poor or mistaken forecasts are also highlighted. Copyright © 2010 Royal Meteorological Society.