19 resultados para AGREEMENTS
em CentAUR: Central Archive University of Reading - UK
Resumo:
Traditional resource management has had as its main objective the optimisation of throughput, based on parameters such as CPU, memory, and network bandwidth. With the appearance of Grid Markets, new variables that determine economic expenditure, benefit and opportunity must be taken into account. The SORMA project aims to allow resource owners and consumers to exploit market mechanisms to sell and buy resources across the Grid. SORMA’s motivation is to achieve efficient resource utilisation by maximising revenue for resource providers, and minimising the cost of resource consumption within a market environment. An overriding factor in Grid markets is the need to ensure that desired Quality of Service levels meet the expectations of market participants. This paper explains the proposed use of an Economically Enhanced Resource Manager (EERM) for resource provisioning based on economic models. In particular, this paper describes techniques used by the EERM to support revenue maximisation across multiple Service Level Agreements.
Resumo:
Traditional resource management has had as its main objective the optimisation of throughput, based on pa- rameters such as CPU, memory, and network bandwidth. With the appearance of Grid Markets, new variables that determine economic expenditure, benefit and opportunity must be taken into account. The SORMA project aims to allow resource owners and consumers to exploit market mechanisms to sell and buy resources across the Grid. SORMA’s motivation is to achieve efficient resource utilisation by maximising revenue for resource providers, and minimising the cost of resource consumption within a market environment. An overriding factor in Grid markets is the need to ensure that desired Quality of Service levels meet the expectations of market participants. This paper explains the proposed use of an Economically Enhanced Resource Manager (EERM) for resource provisioning based on economic models. In particular, this paper describes techniques used by the EERM to support revenue maximisation across multiple Service Level Agreements.
Resumo:
Governing climate change is arguably one of the most complex problems, environmental or otherwise, that the global community has had to contend with. This chapter highlights the innovations in governance that have characterized the global climate change regime as it sought to respond to and manage these complexities, political imperatives and competing interests. We suggest that the key contestations and innovations within climate governance can be understood in terms of four themes/questions all of which relate to issues of justice and equity.
Resumo:
This paper aims at two different contributions to the literature on international environmental agreements. First, we model environmental agreements as a generic situation, characterized as a Hawk-Dove game with multiple asymmetric equilibria. Second, the article applies the theory on non-cooperative games with confirmed proposals, based on an alternating proposals bargaining protocol, as a way of overcoming the usual problems of coordination and bargaining failures in environmental agreement games, due to payoff asymmetry and equilibrium multiplicity.
Resumo:
The context of construction management (CM) reveals that this method of procurement is as much a management philosophy as a contract structure. It is important to consider legal and contractual issues in this context. The interplay between management and law is complex and often misunderstood. Before considering specific issues, the use of contractual remedies in business agreements is discussed. In addition, the extent to which standardising a form of contract detracts or contributes to the success of projects is also considered. The dearth of judicial decisions, and the lack of a standard form, render it difficult to be specific about legal issues. Therefore, the main discussion of legal issues is centred around a recently completed research project which involved eliciting the views of a cross-section of experienced construction management clients, consultants and trade contractors. These interviews are used as the basis for highlighting some of the most important legal points to consider when setting up CM projects. The interviews revealed that the advantage of CM is the proximity of the client to the trade contractors and the disadvantage is that it depends on a high degree of professionalism and experience; qualities which are unfortunately difficult to find in the UK construction industry.
Resumo:
A full assessment of para-virtualization is important, because without knowledge about the various overheads, users can not understand whether using virtualization is a good idea or not. In this paper we are very interested in assessing the overheads of running various benchmarks on bare-‐metal, as well as on para-‐virtualization. The idea is to see what the overheads of para-‐ virtualization are, as well as looking at the overheads of turning on monitoring and logging. The knowledge from assessing various benchmarks on these different systems will help a range of users understand the use of virtualization systems. In this paper we assess the overheads of using Xen, VMware, KVM and Citrix, see Table 1. These different virtualization systems are used extensively by cloud-‐users. We are using various Netlib1 benchmarks, which have been developed by the University of Tennessee at Knoxville (UTK), and Oak Ridge National Laboratory (ORNL). In order to assess these virtualization systems, we run the benchmarks on bare-‐metal, then on the para-‐virtualization, and finally we turn on monitoring and logging. The later is important as users are interested in Service Level Agreements (SLAs) used by the Cloud providers, and the use of logging is a means of assessing the services bought and used from commercial providers. In this paper we assess the virtualization systems on three different systems. We use the Thamesblue supercomputer, the Hactar cluster and IBM JS20 blade server (see Table 2), which are all servers available at the University of Reading. A functional virtualization system is multi-‐layered and is driven by the privileged components. Virtualization systems can host multiple guest operating systems, which run on its own domain, and the system schedules virtual CPUs and memory within each Virtual Machines (VM) to make the best use of the available resources. The guest-‐operating system schedules each application accordingly. You can deploy virtualization as full virtualization or para-‐virtualization. Full virtualization provides a total abstraction of the underlying physical system and creates a new virtual system, where the guest operating systems can run. No modifications are needed in the guest OS or application, e.g. the guest OS or application is not aware of the virtualized environment and runs normally. Para-‐virualization requires user modification of the guest operating systems, which runs on the virtual machines, e.g. these guest operating systems are aware that they are running on a virtual machine, and provide near-‐native performance. You can deploy both para-‐virtualization and full virtualization across various virtualized systems. Para-‐virtualization is an OS-‐assisted virtualization; where some modifications are made in the guest operating system to enable better performance. In this kind of virtualization, the guest operating system is aware of the fact that it is running on the virtualized hardware and not on the bare hardware. In para-‐virtualization, the device drivers in the guest operating system coordinate the device drivers of host operating system and reduce the performance overheads. The use of para-‐virtualization [0] is intended to avoid the bottleneck associated with slow hardware interrupts that exist when full virtualization is employed. It has revealed [0] that para-‐ virtualization does not impose significant performance overhead in high performance computing, and this in turn this has implications for the use of cloud computing for hosting HPC applications. The “apparent” improvement in virtualization has led us to formulate the hypothesis that certain classes of HPC applications should be able to execute in a cloud environment, with minimal performance degradation. In order to support this hypothesis, first it is necessary to define exactly what is meant by a “class” of application, and secondly it will be necessary to observe application performance, both within a virtual machine and when executing on bare hardware. A further potential complication is associated with the need for Cloud service providers to support Service Level Agreements (SLA), so that system utilisation can be audited.
Resumo:
Export subsidies on processed foods are an important trade policy instrument for the European Union. GATT Article XVI legitimised the use of export subsidies on primary agricultural products, under certain circumstances, but forbade the use of export subsidies on non-primary products. However it was never satisfactorily resolved whether export subsidies could be paid on the primary agricultural products incorporated into processed products, such as pasta. The Uruguay Round Agreements, and particularly the Agreement on Agriculture (the URAA), apparently legitimised the EU’s practice of paying export subsidies on incorporated agricultural products, at least while the Peace Clause was in force. With the demise of the Peace Clause the question arises whether GATT Article XVI has any residual force, given that the range of primary agricultural products exempted by Article XVI from the ban on export subsidies is narrower than the list of agricultural products covered by the URAA.
Resumo:
Current recipes for learning across business sectors too often fail to recognize the embedded and contextual nature of management practice. The existing literature gives little emphasis to the symbiotic relationship between supply chain management and the broader dynamics of context. The aerospace and construction sectors are selected for comparison on the basis that they are so different. The UK aerospace sector has undergone extensive consolidation as a result of the imperatives of global competitive pressures. In contrast, the construction industry has experienced decades of fragmentation and remains highly localized. An increasing proportion of output in the aerospace sector occurs within a small number of large, globally orientated firms. In contrast, construction output is dominated by a plethora of small firms with high levels of subcontracting and a widespread reliance on self-employment. These differences have fundamental implications for the way that supply chain management is understood and implemented in the two sectors. Semi-structured interviews with practitioners from both sectors support the contention that supply chain management is more established in aerospace than construction. The introduction of prime contracting and the increasing use of framework agreements within the construction sector potentially provide a much more supportive climate for supply chain management than has traditionally prevailed. However, progress depends upon an improved continuity of workload under such arrangements.
Resumo:
Traditional resource management has had as its main objective the optimization of throughput, based on parameters such as CPU, memory, and network bandwidth. With the appearance of Grid markets, new variables that determine economic expenditure, benefit and opportunity must be taken into account. The Self-organizing ICT Resource Management (SORMA) project aims at allowing resource owners and consumers to exploit market mechanisms to sell and buy resources across the Grid. SORMA's motivation is to achieve efficient resource utilization by maximizing revenue for resource providers and minimizing the cost of resource consumption within a market environment. An overriding factor in Grid markets is the need to ensure that the desired quality of service levels meet the expectations of market participants. This paper explains the proposed use of an economically enhanced resource manager (EERM) for resource provisioning based on economic models. In particular, this paper describes techniques used by the EERM to support revenue maximization across multiple service level agreements and provides an application scenario to demonstrate its usefulness and effectiveness. Copyright © 2008 John Wiley & Sons, Ltd.