185 resultados para Project 2002-062-A : Ethical Construction Procurement


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Ten projects constructed in Ghana between 2003 and 2010 are examined and analysed to ascertain the reliability of estimated costs provided for the projects. Cost estimates for five of the projects were calculated by consultants and cost estimates for the five remaining projects were calculated by contractors. Cost estimates prepared by contractors seemed to be closer to actual costs than estimates calculated by consultants. Projects estimated by consultants experienced an average cost overrun of 40% and time overrun of 62% whereas projects priced by contractors experienced an average cost overrun of 6% and time overrun of 41%. It seemed that contractors had a better understanding of the actual construction processes and a clearer expectation of the needs of the client hence an ability to calculate estimates that were closer to reality. Construction clients in Ghana should rely on contractors for more realistic cost estimates as estimates by consultants may be inaccurate. Where consultants are employed, an allowance of up 40% should be added to the estimated costs as a margin for inaccuracy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A review of current risk pricing practices in the financial, insurance and construction sectors is conducted through a comprehensive literature review. The purpose was to inform a study on risk and price in the tendering processes of contractors: specifically, how contractors take account of risk when they are calculating their bids for construction work. The reference to mainstream literature was in view of construction management research as a field of application rather than a fundamental academic discipline. Analytical models are used for risk pricing in the financial sector. Certain mathematical laws and principles of insurance are used to price risk in the insurance sector. construction contractors and practitioners are described to traditionally price allowances for project risk using mechanisms such as intuition and experience. Project risk analysis models have proliferated in recent years. However, they are rarely used because of problems practitioners face when confronted with them. A discussion of practices across the three sectors shows that the construction industry does not approach risk according to the sophisticated mechanisms of the two other sectors. This is not a poor situation in itself. However, knowledge transfer from finance and insurance can help construction practitioners. But also, formal risk models for contractors should be informed by the commercial exigencies and unique characteristics of the construction sector.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

One of the aims of a broad ethnographic study into how the apportionment of risk influences pricing levels of contactors was to ascertain the significant risks affecting contractors in Ghana, and their impact on prices. To do this, in the context of contractors, the difference between expected and realized return on a project is the key dependent variable examined using documentary analyses and semi-structured interviews. Most work in this has focused on identifying and prioritising risks using relative importance indices generated from the analysis of questionnaire survey responses. However, this approach may be argued to constitute perceptions rather than direct measures of the project risk. Here, instead, project risk is investigated by examining two measures of the same quantity; one ‘before’ and one ‘after’ construction of a project has taken place. Risks events are identified by ascertaining the independent variables causing deviations between expected and actual rates of return. Risk impact is then measured by ascertaining additions or reductions to expected costs due to the occurrence of risk events. So far, data from eight substantially complete building projects indicates that consultants’ inefficiency, payment delays, subcontractor-related problems and changes in macroeconomic factors are significant risks affecting contractors in Ghana.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Little attention has been focussed on a precise definition and evaluation mechanism for project management risk specifically related to contractors. When bidding, contractors traditionally price risks using unsystematic approaches. The high business failure rate our industry records may indicate that the current unsystematic mechanisms contractors use for building up contingencies may be inadequate. The reluctance of some contractors to include a price for risk in their tenders when bidding for work competitively may also not be a useful approach. Here, instead, we first define the meaning of contractor contingency, and then we develop a facile quantitative technique that contractors can use to estimate a price for project risk. This model will help contractors analyse their exposure to project risks; and help them express the risk in monetary terms for management action. When bidding for work, they can decide how to allocate contingencies strategically in a way that balances risk and reward.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A major infrastructure project is used to investigate the role of digital objects in the coordination of engineering design work. From a practice-based perspective, research emphasizes objects as important in enabling cooperative knowledge work and knowledge sharing. The term ‘boundary object’ has become used in the analysis of mutual and reciprocal knowledge sharing around physical and digital objects. The aim is to extend this work by analysing the introduction of an extranet into the public–private partnership project used to construct a new motorway. Multiple categories of digital objects are mobilized in coordination across heterogeneous, cross-organizational groups. The main findings are that digital objects provide mechanisms for accountability and control, as well as for mutual and reciprocal knowledge sharing; and that different types of objects are nested, forming a digital infrastructure for project delivery. Reconceptualizing boundary objects as a digital infrastructure for delivery has practical implications for management practices on large projects and for the use of digital tools, such as building information models, in construction. It provides a starting point for future research into the changing nature of digitally enabled coordination in project-based work.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The North Atlantic Marine Boundary Layer Experiment (NAMBLEX), involving over 50 scientists from 12 institutions, took place at Mace Head, Ireland (53.32° N, 9.90° W), between 23 July and 4 September 2002. A wide range of state-of-the-art instrumentation enabled detailed measurements of the boundary layer structure and atmospheric composition in the gas and aerosol phase to be made, providing one of the most comprehensive in situ studies of the marine boundary layer to date. This overview paper describes the aims of the NAMBLEX project in the context of previous field campaigns in the Marine Boundary Layer (MBL), the overall layout of the site, a summary of the instrumentation deployed, the temporal coverage of the measurement data, and the numerical models used to interpret the field data. Measurements of some trace species were made for the first time during the campaign, which was characterised by predominantly clean air of marine origin, but more polluted air with higher levels of NOx originating from continental regions was also experienced. This paper provides a summary of the meteorological measurements and Planetary Boundary Layer (PBL) structure measurements, presents time series of some of the longer-lived trace species (O3, CO, H2, DMS, CH4, NMHC, NOx, NOy, PAN) and summarises measurements of other species that are described in more detail in other papers within this special issue, namely oxygenated VOCs, HCHO, peroxides, organo-halogenated species, a range of shorter lived halogen species (I2, OIO, IO, BrO), NO3 radicals, photolysis frequencies, the free radicals OH, HO2 and (HO2+Σ RO2), as well as a summary of the aerosol measurements. NAMBLEX was supported by measurements made in the vicinity of Mace Head using the NERC Dornier-228 aircraft. Using ECMWF wind-fields, calculations were made of the air-mass trajectories arriving at Mace Head during NAMBLEX, and were analysed together with both meteorological and trace-gas measurements. In this paper a chemical climatology for the duration of the campaign is presented to interpret the distribution of air-mass origins and emission sources, and to provide a convenient framework of air-mass classification that is used by other papers in this issue for the interpretation of observed variability in levels of trace gases and aerosols.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the emerging digital economy, the management of information in aerospace and construction organisations is facing a particular challenge due to the ever-increasing volume of information and the extensive use of information and communication technologies (ICTs). This paper addresses the problems of information overload and the value of information in both industries by providing some cross-disciplinary insights. In particular it identifies major issues and challenges in the current information evaluation practice in these two industries. Interviews were conducted to get a spectrum of industrial perspectives (director/strategic, project management and ICT/document management) on these issues in particular to information storage and retrieval strategies and the contrasting approaches to knowledge and information management of personalisation and codification. Industry feedback was collected by a follow-up workshop to strengthen the findings of the research. An information-handling agenda is outlined for the development of a future Information Evaluation Methodology (IEM) which could facilitate the practice of the codification of high-value information in order to support through-life knowledge and information management (K&IM) practice.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The method of entropy has been useful in evaluating inconsistency on human judgments. This paper illustrates an entropy-based decision support system called e-FDSS to the solution of multicriterion risk and decision analysis in projects of construction small and medium enterprises (SMEs). It is optimized and solved by fuzzy logic, entropy, and genetic algorithms. A case study demonstrated the use of entropy in e-FDSS on analyzing multiple risk criteria in the predevelopment stage of SME projects. Survey data studying the degree of impact of selected project risk criteria on different projects were input into the system in order to evaluate the preidentified project risks in an impartial environment. Without taking into account the amount of uncertainty embedded in the evaluation process; the results showed that all decision vectors are indeed full of bias and the deviations of decisions are finally quantified providing a more objective decision and risk assessment profile to the stakeholders of projects in order to search and screen the most profitable projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports by Latham (1994, Constructing the Team, HMSO, London) and Egan (1998, Rethinking Construction, HMSO, London). A major problem for construction companies is the lack of project predictability. One method of increasing predictability and delivering increased customer value is through the systematic management of construction processes. However, the industry has no methodological mechanism to assess process capability and prioritise process improvements. Standardized Process Improvement for Construction Enterprises (SPICE) is a research project that is attempting to develop a stepwise process improvement framework for the construction industry, utilizing experience from the software industry, and in particular the Capability Maturity Model (CMM), which has resulted in significant productivity improvements in the software industry. This paper introduces SPICE concepts and presents the results from two case studies conducted on design and build projects. These studies have provided further in-sight into the relevance and accuracy of the framework, as well as its value for the construction sector.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There are a number of challenges associated with managing knowledge and information in construction organizations delivering major capital assets. These include the ever-increasing volumes of information, losing people because of retirement or competitors, the continuously changing nature of information, lack of methods on eliciting useful knowledge, development of new information technologies and changes in management and innovation practices. Existing tools and methodologies for valuing intangible assets in fields such as engineering, project management and financial, accounting, do not address fully the issues associated with the valuation of information and knowledge. Information is rarely recorded in a way that a document can be valued, when either produced or subsequently retrieved and re-used. In addition there is a wealth of tacit personal knowledge which, if codified into documentary information, may prove to be very valuable to operators of the finished asset or future designers. This paper addresses the problem of information overload and identifies the differences between data, information and knowledge. An exploratory study was conducted with a leading construction consultant examining three perspectives (business, project management and document management) by structured interviews and specifically how to value information in practical terms. Major challenges in information management are identified. An through-life Information Evaluation methodology (IEM) is presented to reduce information overload and to make the information more valuable in the future.