209 resultados para Kauffman, Stuart A
Resumo:
The current research agenda for construction process improvement is heavily influenced by the rhetoric of business process re-engineering (BPR). In contrast to the wider literature on BPR, there is little evidence of critical thought within the construction management research community. A postmodernist interpretation is advocated whereby the reality of management practice is defined by the dominant management discourse. The persuasiveness of BPR rhetoric is analysed with particular reference to the way in which it plays on the insecurity of modern managers. Despite the lip service given to ‘empowerment’ and ‘teamwork’, the dominant theme of the re-engineering movement is that of technocratic totalitarianism. From a critical perspective, it is suggested that BPR is imposed on construction organizations to ensure continued control by the industry's dominant power groups. Whilst industry leaders are fond of calling for ‘attitudinal and cultural improvement’, the language of the accepted research agenda continually reinforces the industry's dominant culture of ‘control and command’. Therefore, current research directions in process improvement perpetuate existing attitudes rather than facilitating cultural change. The concept of lean construction is seen to be the latest manifestation of this phenomenon.
Resumo:
This paper considers the relationship between value management and facilities management. The findings are particularly relevant to large client organisations which procure new buildings on a regular basis. It is argued that the maximum effectiveness of value management can only be achieved if it is used in conjunction with an ongoing commitment to post-occupancy evaluation. SMART value management is seen to provide the means of ensuring that an individual building design is in alignment with the client’s strategic property needs. However, it is also necessary to recognise that an organisation’s strategic property needs will continually be in a state of change. Consequentially, economic and functional under-performance can only be avoided by a regular performance audit of existing property stock in accordance with changing requirements. Such a policy will ensure ongoing competitiveness through organisational learning. While post-occupancy evaluation represents an obvious additional service to be provided by value management consultants, it is vital that the necessary additional skills are acquired. Process management skills and social science research techniques are clearly important. However, there is also a need to improve mechanisms for data manipulation. Success can only be achieved if equal attention is given to issues of process, structure and content.
Resumo:
This paper reports on a survey of 17 value management exercises recently carried out within the UK construction industry. Twelve leading value management practitioners were asked to describe an example of a value management study which ‘worked well’ and one which ‘did not work well’. They were further asked to explain the underlying factors which they considered had influenced the eventual outcome of the value management study. The subsequent analysis of the interview transcripts reveals six recurring themes which were held to have had a significant influence: expectations, implementation, participation, power, time constraint and uncertainty. Whilst caution is necessary in extracting the themes from their individual contexts, they do provide a valuable insight into the factors which influence the outcome of value management studies.
Resumo:
This paper reviews and critiques the current practice of classifying building clients according to their 'type'. An alternative approach to understanding organisations is developed in accordance with the principles of naturalistic inquiry. It is contended that the complex pluralistic clients of the 1990s can only really be understood 'from the inside'. The concept of organisational metaphors is introduced as the basis for a more sophisticated way of thinking about organisations. The various strands of organisational theory are also analyzed in terms of their underlying metaphors. Different theories are seen to bring different insights. The implicit metaphors adopted by practitioners are held to be important in that they tend to dictate the adopted approach to client briefing. This contention is illustrated by analyzing three different characterisations of the briefing process in terms of their underlying metaphors. Finally, the discussion is placed in a contemporary UK context by comparing the dominant paradigm of practice during the 1980s to that of the 1990s.
Resumo:
There have been various techniques published for optimizing the net present value of tenders by use of discounted cash flow theory and linear programming. These approaches to tendering appear to have been largely ignored by the industry. This paper utilises six case studies of tendering practice in order to establish the reasons for this apparent disregard. Tendering is demonstrated to be a market orientated function with many subjective judgements being made regarding a firm's environment. Detailed consideration of 'internal' factors such as cash flow are therefore judged to be unjustified. Systems theory is then drawn upon and applied to the separate processes of estimating and tendering. Estimating is seen as taking place in a relatively sheltered environment and as such operates as a relatively closed system. Tendering, however, takes place in a changing and dynamic environment and as such must operate as a relatively open system. The use of sophisticated methods to optimize the value of tenders is then identified as being dependent upon the assumption of rationality, which is justified in the case of a relatively closed system (i.e. estimating), but not for a relatively open system (i.e. tendering).
Resumo:
Considers the application of value management during the briefing and outline design stages of building developments.