171 resultados para Construction management and engineering - China
Resumo:
In the global construction context, the best value or most economically advantageous tender is becoming a widespread approach for contractor selection, as an alternative to other traditional awarding criteria such as the lowest price. In these multi-attribute tenders, the owner or auctioneer solicits proposals containing both a price bid and additional technical features. Once the proposals are received, each bidder’s price bid is given an economic score according to a scoring rule, generally called an economic scoring formula (ESF) and a technical score according to pre-specified criteria. Eventually, the contract is awarded to the bidder with the highest weighted overall score (economic + technical). However, economic scoring formula selection by auctioneers is invariably and paradoxically a highly intuitive process in practice, involving few theoretical or empirical considerations, despite having been considered traditionally and mistakenly as objective, due to its mathematical nature. This paper provides a taxonomic classification of a wide variety of ESFs and abnormally low bids criteria (ALBC) gathered in several countries with different tendering approaches. Practical implications concern the optimal design of price scoring rules in construction contract tenders, as well as future analyses of the effects of the ESF and ALBC on competitive bidding behaviour.
Resumo:
Learning Objects offer flexibility and adaptability for users to request personalised information for learning. There are standards to guide the development of learning objects. However, individual developers may customise these standards for serving different purposes when defining, describing, managing and providing learning objects, which are normally stored in heterogeneous repositories. Barriers to interoperability hinder sharing of learning services and subsequently affect quality of instructional design as learners expect to be able to receive their personalised learning content. All these impose difficulties to the users in getting the right information from the right sources. This paper investigates the interoperability issues in eLearning services management and provision and presents an approach to resolve interoperability at three levels.
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an extension to existing buildings to provide a warehouse, services block and packing line. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of building provision can be viewed as systems and subsystems which are differentiated from each other at decision points. Further to this, the subsystems can be viewed as the interaction of managing system and operating system. Using Walker's model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficacy of the organizational structure used. The causes of the client's dissatisfaction with the outcome of the project were lack of integration and complexity of the managing system. However, there was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's propositions.
Resumo:
Soil forms the outer skin of the earth's land surface. Often less than a metre in depth, it is essential to sustain natural terrestrial ecosystems and human life. Soils result from the interactions over time between climate, parent material, topography, vegetation, and biota. They vary from place to place. Mineral soils are composed of mineral matter, organic matter, and gas- or liquid-filled pores in varying proportions. Soils perform a wide range of functions and provide many ecosystem or environmental services; with the climate problem, the soil is increasingly being recognised as a potential sink for carbon from the atmosphere. In part because of humankind's (over)use of soils and in part because of natural and human-induced environmental change, there is a widespread decline in soil quality and an increasing number of threats to soil, which jeopardise both the soil's natural functions and its use by humans. As a limited resource, soils must be used sustainably. Soil protection strategies have been indirectly embodied in a number of United Nations conventions, and there are now national and supranational developments towards specific regulations and legislation to protect soils and their functions.
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an engineering factory and offices. A multi-disciplinary professional practice was used to manage and design the project. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of buildings provision can be viewed as systems and sub-systems which are differentiated form each other at decision points. Further to this, the sub-systematic analysis of the relationship between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. There was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's proposition. However, the project was subject to string environmental forces which the project organization was not capable of entirely overcoming.
Resumo:
A systematic technique for identifying the environments of construction projects is described. It provides a method for isolating the major variables surrounding construction projects, and is briefly applied to the industries of Britain and Jamaica to illustrate its application. From this, it is inferred that the environment of a Jamaican construction project in systems terms is broadly similar to the environment of a construction project in Britain.
Resumo:
Planning is a vital element of project management but it is still not recognized as a process variable. Its objective should be to outperform the initially defined processes, and foresee and overcome possible undesirable events. Detailed task-level master planning is unrealistic since one cannot accurately predict all the requirements and obstacles before work has even started. The process planning methodology (PPM) has thus been developed in order to overcome common problems of the overwhelming project complexity. The essential elements of the PPM are the process planning group (PPG), including a control team that dynamically links the production/site and management, and the planning algorithm embodied within two continuous-improvement loops. The methodology was tested on a factory project in Slovenia and in four successive projects of a similar nature. In addition to a number of improvement ideas and enhanced communication, the applied PPM resulted in 32% higher total productivity, 6% total savings and created a synergistic project environment.
Resumo:
In many river floodplains in the UK, there has been a long history of flood defence, land reclamation and water regime management for farming. In recent years, however, changing European and national policies with respect to farming, environment and flood management are encouraging a re-appraisal of land use in rural areas. In particular, there is scope to develop, through the use of appropriate promotional mechanisms, washland areas, which will simultaneously accommodate winter inundation, support extensive farming methods, deliver environmental benefits, and do this in a way which can underpin the rural economy. This paper explores the likely economic impacts of the development of flood storage and washland creation. In doing so, consideration is given to feasibility of this type of development, the environmental implications for a variety of habitats and species, and the financial and institutional mechanisms required to achieve implementation. (C) 2007 Elsevier Ltd. All rights reserved.