126 resultados para Built environment
Resumo:
Income segregation across Melbourne’s residential communities is widening, and at a pace faster than in some other Australian cities. The widening gap between Melbourne’s rich and poor communities raises fears about concentrations of poverty and social exclusion, particularly if the geography of these communities is such that they and their residents are increasingly isolated from urban services and employment centres. Social exclusion in our metropolitan areas and the government responses to it are commonly thought to be the proper domain of social and economic policy. The role of urban planning is typically neglected, yet it helps shape the economic opportunities available to communities in its attempts to influence the geographical location of urban services, infrastructure and jobs. Under the current metropolitan strategy ‘Melbourne 2030’ urban services and transport infrastructure are to be concentrated within Principal Activity Centres spread throughout the metropolitan area and it is the intention that lower-income households should have ready access to these activity centres. However, the Victorian state government has few housing policy instruments to achieve this goal and there are fears that community mix may suffer as house prices and rents are bid up in the vicinity of Principal Activity Centres, and lower-income households are displaced. But are these fears justified by the changing geography of house prices in the metropolitan region? This is the key research question addressed in this paper which examines whether the Victorian practice of placing reliance on the market to deliver affordable housing, while intervening to promote a more compact pattern of urban settlement, is effective.
Resumo:
Electricity consumption in Ghana is estimated to be increasing by 10% per annum due to the demand from the growing population. However, current sources of production (hydro and thermal facilities) generate only 66% of the current demand. Considering current trends, it is difficult to substantiate these basic facts, because of the lack of information. As a result, research into the existing sources of generating electricity, electricity consumption and prospective projects has been performed. This was achieved using three key techniques; review of literature, empirical studies and modelling. The results presented suggest that, current annual installed capacity of energy generation (i.e. 1960 MW) must be increased to 9,405.59 MW, assuming 85% plant availability. This is then capable to coop with the growing demand and it would give access to the entire population as well as support commercial and industrial activities for the growth of the economy. The prospect of performing this research is with the expectation to present an academic research agenda for further exploration into the subject area, without which the growth of the country would be stagnant.
Resumo:
Unsurprisingly, a great deal of attention has been paid to the economic consequences of the credit crunch. However, this paper shows that the credit crunch was preceded by a strong build-up of mortgage debt internationally, which, in the long run, could turn out to be more significant than the credit crunch itself. Indeed, the debt build-up suggests that the credit crunch is more likely to reoccur, because highly-indebted households have weaker buffers to withstand unexpected shocks to their incomes or to interest rates. The paper presents a model that can explain the debt build-up and changes to the distribution of debt between existing owners and first-time buyers, which hinders access to home-ownership for the latter, even amongst those households who would be considered as credit-worthy.
Resumo:
Purpose – Expectations of future market conditions are acknowledged to be crucial for the development decision and hence for shaping the built environment. The purpose of this paper is to study the central London office market from 1987 to 2009 and test for evidence of rational, adaptive and naive expectations. Design/methodology/approach – Two parallel approaches are applied to test for either rational or adaptive/naive expectations: vector auto-regressive (VAR) approach with Granger causality tests and recursive OLS regression with one-step forecasts. Findings – Applying VAR models and a recursive OLS regression with one-step forecasts, the authors do not find evidence of adaptive and naïve expectations of developers. Although the magnitude of the errors and the length of time lags between market signal and construction starts vary over time and development cycles, the results confirm that developer decisions are explained, to a large extent, by contemporaneous and historic conditions in both the City and the West End, but this is more likely to stem from the lengthy design, financing and planning permission processes rather than adaptive or naive expectations. Research limitations/implications – More generally, the results of this study suggest that real estate cycles are largely generated endogenously rather than being the result of large demand shocks and/or irrational behaviour. Practical implications – Developers may be able to generate excess profits by exploiting market inefficiencies but this may be hindered in practice by the long periods necessary for planning and construction of the asset. Originality/value – This paper focuses the scholarly debate of real estate cycles on the role of expectations. It is also one of very few spatially disaggregate studies of the subject matter.
Resumo:
Lean construction is considered from a human resource management (HRM) perspective. It is contended that the UK construction sector is characterised by an institutionalised regressive approach to HRM. In the face of rapidly declining recruitment rates for built environment courses, the dominant HRM philosophy of utilitarian instrumentalism does little to attract the intelligent and creative young people that the industry so badly needs. Given this broader context, there is a danger that an uncritical acceptance of lean construction will exacerbate the industry's reputation for unrewarding jobs. Construction academics have strangely ignored the extensive literature that equates lean production to a HRM regime of control, exploitation and surveillance. The emphasis of lean thinking on eliminating waste and improving efficiency makes it easy to absorb into the best practice agenda because it conforms to the existing dominant way of thinking. 'Best practice' is seemingly judged by the extent to which it serves the interests of the industry's technocratic elite. Hence it acts as a conservative force in favour of maintaining the status quo. In this respect, lean construction is the latest manifestation of a long established trend. In common with countless other improvement initiatives, the rhetoric is heavy in the machine metaphor whilst exhorting others to be more efficient. If current trends in lean construction are extrapolated into the future the ultimate destination may be uncomfortably close to Aldous Huxley's apocalyptic vision of a Brave New World. In the face of these trends, the lean construction research community pleads neutrality whilst confining its attention to the rational high ground. The future of lean construction is not yet predetermined. Many choices remain to be made. The challenge for the research community is to improve practice whilst avoiding the dehumanising tendencies of high utilitarianism.
Resumo:
In the winter of 2007, Doug Aitken’s moving image installation, sleepwalkers, was projected onto the exterior walls of the Museum of Modern Art in New York. The project was a collaboration between Aitken, the museum and Creative Time, a New York-based organisation that commissions public art projects. A site-specific version of the installation has been commissioned by the Miami Art Museum for the opening of its new facility, designed by Swiss architects Herzog and de Meuron, in 2013: “sleepwalkers (Miami) will expand the work’s landscape and characters in a manner that reflects the diverse social fabric of Miami.” This essay examines sleepwalkers as an example of the emerging form of film as public art. There are three strands to my argument: first, an examination of the role of film in the redefinition of public art, shifting away from spatial practices concerned with fixed and permanent notions of space, community and art and towards transient and experimental spatial and artistic practices; second,a discussion of the relationship between projection and the built environment and the ways that the qualities of luminescence, transparency, movement and connectivity are transferred from projected images to the surfaces on which they are projected and the spaces around them; and third, an examination of the ways that sleepwalkers uses only certain aspects of narrativity, those concerned with movement and change, and avoids hermeneutic absorption in order to keep the spectators moving (transposing the idea of sleepwalking from characters to spectators). Transience and transparency are key ideas in the conceptualisation of the work, and these are deployed with significant differences in relation to the distinctive characteristics of each city and each museum.
Resumo:
This article arises from a research project funded by the Subject Centre for Sociology, Anthropology and Politics and a literature review on ‘interdisciplinarity’ commissioned by the Subject Centre for Languages, Linguistics and Area Studies (Chettiparamb, 2007). It attempts to unpack how disciplinarity and interdisciplinarity are created through pedagogy in higher education at the module level while teaching an interdisciplinary subject such as ‘urban studies’. In particular, comparisons are made between the teaching aims and methods in two disciplines: planning and sociology. Comparisons are also made between the approach of two types of universities – a pre-1992 university and a post-1992 university. The article argues that the differences between the universities are more profound than the differences between the disciplines. The research reveals two key findings. In the pre-1992 university case study, even though the ‘contributing’ subject domains of the disciplines are similar, the disciplinary identities are maintained and accomplished in subtle ways. In contrast, in the post-1992 university, disciplinary boundaries are not so purposefully maintained, resulting in the realisation of a different construction of interdisciplinarity.
Resumo:
The assessment of building energy efficiency is one of the most effective measures for reducing building energy consumption. This paper proposes a holistic method (HMEEB) for assessing and certifying building energy efficiency based on the D-S (Dempster-Shafer) theory of evidence and the Evidential Reasoning (ER) approach. HMEEB has three main features: (i) it provides both a method to assess and certify building energy efficiency, and exists as an analytical tool to identify improvement opportunities; (ii) it combines a wealth of information on building energy efficiency assessment, including identification of indicators and a weighting mechanism; and (iii) it provides a method to identify and deal with inherent uncertainties within the assessment procedure. This paper demonstrates the robustness, flexibility and effectiveness of the proposed method, using two examples to assess the energy efficiency of two residential buildings, both located in the ‘Hot Summer and Cold Winter’ zone in China. The proposed certification method provides detailed recommendations for policymakers in the context of carbon emission reduction targets and promoting energy efficiency in the built environment. The method is transferable to other countries and regions, using an indicator weighting system to modify local climatic, economic and social factors.
Resumo:
Rapid urbanisation in China has resulted in great demands for energy, resources and pressure on the environment. The progress in China's development is considered in the context of energy efficiency in the built environment, including policy, technology and implementation. The key research challenges and opportunities are identified for delivering a low carbon built environment. The barriers include the existing traditional sequential design process, the lack of integrated approaches, and insufficient socio-technical knowledge. A proposed conceptual systemic model of an integrated approach identifies research opportunities. The organisation of research activities should be initiated, operated, and managed in a collaborative way among policy makers, professionals, researchers and stakeholders. More emphasis is needed on integrating social, economic and environmental impacts in the short, medium and long terms. An ideal opportunity exists for China to develop its own expertise, not merely in a technical sense but in terms of vision and intellectual leadership in order to flourish in global collaborations.
Resumo:
Expectations of future market conditions are generally acknowledged to be crucial for the development decision and hence for shaping the built environment. This empirical study of the Central London office market from 1987 to 2009 tests for evidence of adaptive and naive expectations. Applying VAR models and a recursive OLS regression with one-step forecasts, we find evidence of adaptive and naïve, rather than rational expectations of developers. Although the magnitude of the errors and the length of time lags vary over time and development cycles, the results confirm that developers’ decisions are explained to a large extent by contemporaneous and past conditions in both London submarkets. The corollary of this finding is that developers may be able to generate excess profits by exploiting market inefficiencies but this may be hindered in practice by the long periods necessary for planning and construction of the asset. More generally, the results of this study suggest that real estate cycles are largely generated endogenously rather than being the result of unexpected exogenous shocks.
Resumo:
The paper conceptualises and explores the links between cities, commerce, urbanism and cultural planning by drawing on Temple Bar in Dublin as an example of how, by linking these concepts to practice in real concrete situations urban life or urban culture can be created and/or revitalised. Temple Bar is Dublin's emerging cultural quarter, an experiment in urban revitalisation which is deliberately focused on culture and urbanism as ways of rediscovering the good city. It has attracted considerable interest from across Europe, and has secured EC funding to kick-start the process of renewal. The author was appointed by the Irish Government to prepare the area management and development strategy for Temple Bar in 1990. Wary of the dangers of property led regeneration, of the destructive impacts of sudden or cataclysmic change, the agencies in Temple Bar have deliberately adopted a strategic management approach to the area. This is referred to as 'urban stewardship', a process of looking after and respecting a place, and helping it to help itself. The paper explores whether there is a 'culture of cities' and whether it is possible to recreate an urban culture. Following Raymond Williams, an anthropological definition of culture is employed, "... a particular way of life, which expresses certain meaning and values not only in art and learning but also in institutional and ordinary behaviour". Rather than being simply an add-on to the serious concerns of economic development and the built environment, culture has both helped shape, and continues to develop in, the streets, spaces and buildings of the city.
Resumo:
The construction industry has become a truly global network of interconnected stakeholders making demands which require the involvement of skilled workforces from all over the world. Construction Management Strategies sets the foundations for understanding and managing construction’s inherent complexity and uniqueness. It establishes clear definitions of commonly accepted terms like built environment, construction, civil engineering, etc. which are often given confusing and conflicting interpretations. It cuts through the plethora of overlapping role titles currently used in the construction sector that make it difficult to establish how projects are actually managed.