95 resultados para interdependence within project and construction


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this document is to provide a single source of reference for every paper published in the journals directly related to research in Construction Management. It is indexed by author and keyword and contains the titles, authors, abstracts and keywords of every article from the following journals: • Building Research and Information (BRI) • Construction Management and Economics (CME) • Engineering, Construction and Architectural Management (ECAM) • Journal of Construction Procurement (JCP) • Journal of Construction Research (JCR) • Journal of Financial Management in Property and Construction (JFM) • RICS Research Papers (RICS) The index entries give short forms of the bibliographical citations, rather than page numbers, to enable annual updates to the abstracts. Each annual update will carry cumulative indexes, so that only one index needs to be consulted.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The European research project TIDE (Tidal Inlets Dynamics and Environment) is developing and validating coupled models describing the morphological, biological and ecological evolution of tidal environments. The interactions between the physical and biological processes occurring in these regions requires that the system be studied as a whole rather than as separate parts. Extensive use of remote sensing including LiDAR is being made to provide validation data for the modelling. This paper describes the different uses of LiDAR within the project and their relevance to the TIDE science objectives. LiDAR data have been acquired from three different environments, the Venice Lagoon in Italy, Morecambe Bay in England, and the Eden estuary in Scotland. LiDAR accuracy at each site has been evaluated using ground reference data acquired with differential GPS. A semi-automatic technique has been developed to extract tidal channel networks from LiDAR data either used alone or fused with aerial photography. While the resulting networks may require some correction, the procedure does allow network extraction over large areas using objective criteria and reduces fieldwork requirements. The networks extracted may subsequently be used in geomorphological analyses, for example to describe the drainage patterns induced by networks and to examine the rate of change of networks. Estimation of the heights of the low and sparse vegetation on marshes is being investigated by analysis of the statistical distribution of the measured LiDAR heights. Species having different mean heights may be separated using the first-order moments of the height distribution.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis is aimed to initiate implementing sustainable building construction in the kingdom of Bahrain, i.e. Building-Integration PhotoVoltaic (BIPV) or Wind Energy (BIWE). It highlights the main constrains that discourage such modern concept in building and construction. Three groups have been questioned using a questionnaire. These are the policy and decision makers, the leading consultants and the contractors. The main constrains of the dissemination of BIVP and BIWE, according to the policy and decision makers, are: lack of knowledge and awareness of the public in sustainable technology, low cost of electricity, low cost of gas and oil and difficulty in applying local environmental taxes. The consultants had attributed the constrains to ignorance of life cycle cost of PV and Wind turbines systems, lack of education and knowledge in sustainable design, political system, shortage of markets importing sustainable technologies and client worries in profitability and pay-back period. The contractors are found to be very enthusiastic and ready to take over any sustainable building project and prefer to have a construction manger to coordinate between the design and contracting team. Design and Build is found the favorable procurement method in Bahrain for conducting BIPV or BIWE projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Change within the construction sector has been a central concern of governments and a select few private-sector clients for a considerable time. The discourse of change emanating from organizations concerned with reform in the construction sector reflects these ongoing concerns for change in the sector. The underlying assumptions of the content of change and appropriate change mechanisms in the UK are critically examined and challenged. In particular, the limitations of measurement and best practice are explored. The allegiance to approaches based on measurement and best practice is acontextual, unreflective and insufficient in providing wholly reliable explanations for the relationship between practice and performance. Claims for the use of measurement and best practice by the reform movement must therefore be understood to have limitations and their use approached with caution. The emphasis on best practice is also understood to direct attention away from understanding the legitimacy of current practice and change within the UK construction sector. An agenda for change in the UK construction sector will need to engage with and be more reflective of current managerial practice and past change initiatives. Contextual approaches such as structuration theory offer a way in which to underpin a research framework that could support the reform movement in setting such an agenda.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Because of the importance and potential usefulness of construction market statistics to firms and government, consistency between different sources of data is examined with a view to building a predictive model of construction output using construction data alone. However, a comparison of Department of Trade and Industry (DTI) and Office for National Statistics (ONS) series shows that the correlation coefcient (used as a measure of consistency) of the DTI output and DTI orders data and the correlation coefficient of the DTI output and ONS output data are low. It is not possible to derive a predictive model of DTI output based on DTI orders data alone. The question arises whether or not an alternative independent source of data may be used to predict DTI output data. Independent data produced by Emap Glenigan (EG), based on planning applications, potentially offers such a source of information. The EG data records the value of planning applications and their planned start and finish dates. However, as this data is ex ante and is not correlated with DTI output it is not possible to use this data to describe the volume of actual construction output. Nor is it possible to use the EG planning data to predict DTI construc-tion orders data. Further consideration of the issues raised reveal that it is not practically possible to develop a consistent predictive model of construction output using construction statistics gathered at different stages in the development process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building services are worth about 2% GDP and are essential for the effective and efficient operations of the building. It is increasingly recognised that the value of a building is related to the way it supports the client organisation’s ongoing business operations. Building services are central to the functional performance of buildings and provide the necessary conditions for health, well-being, safety and security of the occupants. They frequently comprise several technologically distinct sub-systems and their design and construction requires the involvement of numerous disciplines and trades. Designers and contractors working on the same project are frequently employed by different companies. Materials and equipment is supplied by a diverse range of manufacturers. Facilities managers are responsible for operation of the building service in use. The coordination between these participants is crucially important to achieve optimum performance, but too often is neglected. This leaves room for serious faults. The need for effective integration is important. Modern technology offers increasing opportunities for integrated personal-control systems for lighting, ventilation and security as well as interoperability between systems. Opportunities for a new mode of systems integration are provided by the emergence of PFI/PPP procurements frameworks. This paper attempts to establish how systems integration can be achieved in the process of designing, constructing and operating building services. The essence of the paper therefore is to envisage the emergent organisational responses to the realisation of building services as an interactive systems network.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article considers how visual practices are used to manage knowledge in project-based work. It compares project-based work in a capital goods manufacturer and an architectural firm. Visual representations are used extensively in both cases, but the nature of visual practice differs significantly between the two. The research explores the kinds of knowledge that are (and aren't) developed and made visible in strategizing and planning activities. For example, whereas the emphasis of project-based work in the former firm is on exploitation of knowledge and it visualizes its project context largely in commercial and processual terms, the emphasis in the latter is on exploration and it uses a wide range of visual materials to understand physical interdependencies across the project boundary. We contend particular kinds of visual tools can help project teams step between exploration and exploitation within a project, and articulate the types of representations, foci of attention and patterns of interaction involved. The findings suggest that business managers can make more deliberate choices about how knowledge is made visible, and can change visual practice to align the project with exploring and exploiting opportunities. It raises the question: What don't you see within your organization? The work contributes to academic debates about managing through projects, strategising and organizing, while the focus on visual representation disrupts the tacit-codified dichotomy in the broad debate on knowledge and learning, and highlights the craft skills central to strategizing and organizing.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research examines dynamics associated with new representational technologies in complex organizations through a study of the use of a Single Model Environment, prototyping and simulation tools in the mega-project to construct Terminal 5 at Heathrow Airport, London. The ambition of the client, BAA. was to change industrial practices reducing project costs and time to delivery through new contractual arrangements and new digitally-enabled collaborative ways of working. The research highlights changes over time and addresses two areas of 'turbulence' in the use of: 1) technologies, where there is a dynamic tension between desires to constantly improve, change and update digital technologies and the need to standardise practices, maintaining and defending the overall integrity of the system; and 2) representations, where dynamics result from the responsibilities and liabilities associated with sharing of digital representations and a lack of trust in the validity of data from other firms. These dynamics are tracked across three stages of this well-managed and innovative project and indicate the generic need to treat digital infrastructure as an ongoing strategic issue.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Individuals with Williams syndrome (WS) display poor visuo-spatial cognition relative to verbal abilities. Furthermore, whilst perceptual abilities are delayed, visuo-spatial construction abilities are comparatively even weaker, and are characterised by a local bias. We investigated whether his differentiation in visuo-spatial abilities can be explained by a deficit in coding spatial location in WS. This can be measured by assessing participants' understanding of the spatial relations between objects within a visual scene. Coordinate and categorical spatial relations were investigated independently in four participant groups: 21 individuals with WS; 21 typically developing (TD) children matched for non-verbal ability; 20 typically developing controls of a lower non-verbal ability; and 21 adults. A third task measured understanding of visual colour relations. Results indicated first, that the comprehension of categorical and coordinate spatial relations is equally poor in WS. Second, that the comprehension of visual relations is also at an equivalent level to spatial relational understanding in this population. These results can explain the difference in performance on visuo-spatial perception and construction tasks in WS. In addition, both the WS and control groups displayed response biases in the spatial tasks. However, the direction of bias differed across the groups. This finding is explored in relation to current theories of spatial location coding. (c) 2005 Elsevier Inc. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A large and complex IT project may involve multiple organizations and be constrained within a temporal period. An organization is a system comprising of people, activities, processes, information, resources and goals. Understanding and modelling such a project and its interrelationship with relevant organizations are essential for organizational project planning. This paper introduces the problem articulation method (PAM) as a semiotic method for organizational infrastructure modelling. PAM offers a suite of techniques, which enables the articulation of the business, technical and organizational requirements, delivering an infrastructural framework to support the organization. It works by eliciting and formalizing (e. g. processes, activities, relationships, responsibilities, communications, resources, agents, dependencies and constraints) and mapping these abstractions to represent the manifestation of the "actual" organization. Many analysts forgo organizational modelling methods and use localized ad hoc and point solutions, but this is not amenable for organizational infrastructures modelling. A case study of the infrared atmospheric sounding interferometer (IASI) will be used to demonstrate the applicability of PAM, and to examine its relevancy and significance in dealing with the innovation and changes in the organizations.