73 resultados para construction innovation
Resumo:
The themes of awareness and influence within the innovation diffusion process are addressed. The innovation diffusion process is typically represented as stages, yet awareness and influence are somewhat under-represented in the literature. Awareness and influence are situated within the contextual setting of individual actors but also within the broader institutional forces. Understanding how actors become aware of an innovation and then how their opinion is influenced is important for creating a more innovation-active UK construction sector. Social network analysis is proposed as one technique for mapping how awareness and influence occur and what they look like as a network. Empirical data are gathered using two modes of enquiry. This is done through a pilot study consisting of chartered professionals and then through a case study organization as it attempted to diffuse an innovation. The analysis demonstrates significant variations across actors’ awareness and influence networks. It is argued that social network analysis can complement other research methods in order to present a richer picture of how actors become aware of innovations and where they draw their influences regarding adopting innovations. In summarizing the findings, a framework for understanding awareness and influence associated with innovation within the UK construction sector is presented. Finally, with the UK construction sector continually being encouraged to be innovative, understanding and managing an actor’s awareness and influence network will be beneficial. The overarching conclusion thus describes the need not only to build research capacity in this area but also to push the boundaries related to the research methods employed.
Resumo:
This paper provides evidence for the claim made in Baetens Beardsmore (1971) that the grammatical collocation "chercher après" «to look for», which is very frequent in Brussels French, is the result of transfer from the contact language, Brussels Dutch. A detailed quantitative analysis of this construction in different varieties of French which have more or less contact with a Germanic language was made to investigate the likelihood of influence from the Germanic substrate. The differences between the meaning of "chercher" and "chercher après" are also analysed in some depth, to find out whether or not the particle is redundant. According to Trudgill (2004) redundant constructions are more often found in contact situations involving long-term, stable contact and child bilingualism. The particle "après" was found to add a particular shade of meaning to "chercher", and is thus not redundant. Therefore no evidence could be obtained from the current data for Trudgill’s (2004) claim.
Resumo:
Numerous Building Information Modelling (BIM) tools are well established and potentially beneficial in certain uses. However, issues of adoption and implementation persist, particularly for on-site use of BIM tools in the construction phase. We describe an empirical case-study of the implementation of an innovative ‘Site BIM’ system on a major hospital construction project. The main contractor on the project developed BIM-enabled tools to allow site workers using mobile tablet personal computers to access design information and to capture work quality and progress data on-site. Accounts show that ‘Site BIM’, while judged to be successful and actively supporting users, was delivered through an exploratory and emergent development process of informal prototyping. Technical IT skills were adopted into the construction project through personal relationships and arrangements rather than formal processes. Implementation was driven by construction project employees rather than controlled centrally by the corporate IT function.
Resumo:
The construction industry is widely being criticised as a fragmented industry. There are mounting calls for the industry to change. The espoused change calls for collaboration as well as embracing innovation in the process of design, construction and across the supply chain. Innovation and the application of emerging technologies are seen as enablers for integrating the processes ‘integrating the team’ such as building information modelling (BIM). A questionnaire survey was conducted to ascertain change in construction with regard to design management, innovation and the application of BIM as cutting edge pathways for collaboration. The respondents to the survey were from an array of designations across the construction industry such as construction managers, designers, engineers, design coordinators, design managers, architects, architectural technologists and surveyors. There was a general agreement by most respondents that the design team was responsible for design management in their organisation. There is a perception that the design manager and the client are the catalyst for advancing innovation. The current state of industry in terms of incorporating BIM technologies is posing a challenge as well as providing an opportunity for accomplishment. BIM technologies provide a new paradigm shift in the way buildings are designed, constructed and maintained. This paradigm shift calls for rethinking the curriculum for educating building professionals, collectively.
Resumo:
The Code for Sustainable Homes (the Code) will require new homes in the United Kingdom to be ‘zero carbon’ from 2016. Drawing upon an evolutionary innovation perspective, this paper contributes to a gap in the literature by investigating which low and zero carbon technologies are actually being used by house builders, rather than the prevailing emphasis on the potentiality of these technologies. Using the results from a questionnaire three empirical contributions are made. First, house builders are selecting a narrow range of technologies. Second, these choices are made to minimise the disruption to their standard design and production templates (SDPTs). Finally, the coalescence around a small group of technologies is expected to intensify with solar-based technologies predicted to become more important. This paper challenges the dominant technical rationality in the literature that technical efficiency and cost benefits are the primary drivers for technology selection. These drivers play an important role but one which is mediated by the logic of maintaining the SDPTs of the house builders. This emphasises the need for construction diffusion of innovation theory to be problematized and developed within the context of business and market regimes constrained and reproduced by resilient technological trajectories.
Resumo:
Construction procurement is complex and there is a very wide range of options available to procurers. Inappropriate choices about how to procure may limit practical opportunities for innovation. In particular, traditional approaches to construction procurement set up many obstacles for technology suppliers to provide innovative solutions. This is because they are often employed as sub-contractors simply to provide and install equipment to specifications developed before the point at which they become involved in a project. A research team at the University of Reading has developed a procurement framework that comprehensively defines the various options open to procurers in a more fine-grained way than has been known in the past. This enables informed decisions that can establish tailor-made procurement approaches that take into account the needs of specific clients. It enables risk and reward structures to be aligned so that contracts and payment mechanisms are aligned precisely with what a client seeks to achieve. This is not a “one-size-fits-all” approach. Rather, it is an approach that enables informed decisions about how to organize individual procurements that are appropriate to particular circumstances, acknowledging that they differ for each client and for each procurement exercise. Within this context, performance-based contracting (PBC) is explored in terms of the different ways in which technology suppliers within constructed facilities might be encouraged and rewarded for the kinds of innovation sought by the ultimate clients. Examples from various industry sectors are presented, from public sector and from private sector, with a commentary about what they sought to achieve and the extent to which they were successful. The lessons from these examples are presented in terms of feasibility in relation to financial issues, governance, economics, strategic issues, contractual issues and cash flow issues for clients and for contractors. Further background documents and more detailed readings are provided in an appendix for those who wish to find out more.
Resumo:
Innovative, low carbon technologies are already available for use in the construction of buildings, but the impact of their specification on construction projects is unclear. This exploratory research identifies issues which arise following the specification of BIPV in non-residential construction projects. Rather than treating the inclusion of a new technology as a technical problem, the research explores the issue from a socio-technical perspective to understand the accommodations which the project team makes and their effect on the building and the technology. The paper is part of a larger research project which uses a Social Construction of Technology Approach (SCOT) to explore the accommodations made to working practices and design when Building Integrated PhotoVoltaic (BIPV) technology is introduced. The approach explores how the requirements of the technology from different groups of actors (Relevant Social Groups or RSG's) give rise to problems and create solutions. As such it rejects the notion of a rational linear view of innovation diffusion; instead it suggests that the variety and composition of the Relevant Social Groups set the agenda for problem solving and solutions as the project progresses. The research explores the experiences of three people who have extensive histories of involvement with BIPV in construction, looks at how SCOT can inform our understanding of the issues involved and identifies themes and issues in the specification of BIPV on construction projects. A key finding concerns the alignment of inflection points at which interviewees have found themselves changing from one RSG to another as new problems and solutions are identified. The points at which they change RSG often occurred at points which mirror conventional construction categories (in terms of project specification, tender, design and construction).
Resumo:
Attention to epistemology, theory use and citation practices are all issues which distinguish academic disciplines from other ways of knowing. Examples from construction research are used to outline and reflect on these issues. In doing so, the discussion provides an introduction to some key issues in social research as well as a reflection on the current state of construction research as a field. More specifically, differences between positivist and interpretivist epistemologies, the role of theory in each and their use by construction researchers are discussed. Philosophical differences are illustrated by appeal to two published construction research articles by Reichstein et al. and Harty on innovation (Reichstein, Salter and Gann, 2005; Harty, 2008). An analysis of citations for each highlights different cumulativity strategies. The potential contribution of mixed research programmes, combining positivist and interpretivist research, is evaluated. The paper should be of interest to early researchers and to scholars concerned with the ongoing development of construction research as an academic field.