74 resultados para Evaluating and Selecting a Property Management System
Resumo:
Past research has documented a substitution effect between real earnings management (RM) and accrual-based earnings management (AM), depending on relative costs. This study contributes to this research by examining whether levels of (and changes in) financial leverage have an impact on this empirically documented trade-off. We hypothesise that in the presence of high leverage, firms that engage in earnings manipulation tactics will exhibit a preference for RM due to a lower possibility—and subsequent costs—of getting caught. We show that leverage levels and increases positively and significantly affect upward RM, with no significant effect on income-increasing AM, while our findings point towards a complementarity effect between unexpected levels of RM and AM for firms with very high leverage levels and changes. This is interpreted as an indication that high leverage could attract heavy outsider scrutiny, making it necessary for firms to use both forms of earnings management in order to achieve earnings targets. Furthermore, we document that equity investors exhibit a significantly stronger penalising reaction to AM vs. RM, indicating that leverage-induced RM is not as easily detectable by market participants as debt-induced AM, despite the fact that the former could imply deviation from optimal business practices.
Resumo:
Planning a project with proper considerations of all necessary factors and managing a project to ensure its successful implementation will face a lot of challenges. Initial stage in planning a project for bidding a project is costly, time consuming and usually with poor accuracy on cost and effort predictions. On the other hand, detailed information for previous projects may be buried in piles of archived documents which can be increasingly difficult to learn from the previous experiences. Project portfolio has been brought into this field aiming to improve the information sharing and management among different projects. However, the amount of information that could be shared is still limited to generic information. This paper, we report a recently developed software system COBRA to automatically generate a project plan with effort estimation of time and cost based on data collected from previous completed projects. To maximise the data sharing and management among different projects, we proposed a method of using product based planning from PRINCE2 methodology. (Automated Project Information Sharing and Management System -�COBRA) Keywords: project management, product based planning, best practice, PRINCE2
Resumo:
The shamba system involves farmers tending tree saplings on state-owned forest land in return for being permitted to intercrop perennial food crops until canopy closure. At one time the system was used throughout all state-owned forest lands in Kenya, accounting for a large proportion of some 160,000 ha. The system should theoretically be mutually beneficial to both local people and the government. However the system has had a chequered past in Kenya due to widespread malpractice and associated environmental degradation. It was last banned in 2003 but in early 2008 field trials were initiated for its reintroduction. This study aimed to: assess the benefits and limitations of the shamba system in Kenya; assess the main influences on the extent to which the limitations and benefits are realised and; consider the management and policy requirements for the system's successful and sustainable operation. Information was obtained from 133 questionnaires using mainly open ended questions and six participatory workshops carried out in forest-adjacent communities on the western slopes of Mount Kenya in Nyeri district. In addition interviews were conducted with key informants from communities and organisations. There was strong desire amongst local people for the system's reintroduction given that it had provided significant food, income and employment. Local perceptions of the failings of the system included firstly mismanagement by government or forest authorities and secondly abuse of the system by shamba farmers and outsiders. Improvements local people considered necessary for the shamba system to work included more accountability and transparency in administration and better rules with respect to plot allocation and stewardship. Ninety-seven percent of respondents said they would like to be more involved in management of the forest and 80% that they were willing to pay for the use of a plot. The study concludes that the structural framework laid down by the 2005 Forests Act, which includes provision for the reimplementation of the shamba system under the new plantation establishment and livelihood improvement scheme (PELIS) [It should be noted that whilst the shamba system was re-branded in 2008 under the acronym PELIS, for the sake of simplicity the authors continue to refer to the 'shamba system' and 'shamba farmers' throughout this paper.], is weakened because insufficient power is likely to be devolved to local people, casting them merely as 'forest users' and the shamba system as a 'forest user right'. In so doing the system's potential to both facilitate and embody the participation of local people in forest management is limited and the long-term sustainability of the new system is questionable. Suggested instruments to address this include some degree of sharing of profits from forest timber, performance related guarantees for farmers to gain a new plot and use of joint committees consisting of local people and the forest authorities for long term management of forests.
Resumo:
Heritage tourism depends on a physical resource based primarily on listed buildings and scheduled monuments. Visiting or staying in a historic building provides a rich tourism experience, but historic environments date from eras when access for disabled people was not a consideration. Current UK Government policy now promotes social inclusion via an array of equal opportunities, widening participation and anti-discrimination policies. Historic environments enjoy considerable legislative protection from adverse change, but now need to balance conservation with public access for all. This paper discusses the basis of research being undertaken by The College of Estate Management funded by the Mercers Company of London and the Harold Samuel Trust. It assesses how the 1995 Disability Discrimination Act has changed the legal obligations of owners/operators in managing access to listed buildings in tourism use. It also examines the key stakeholders and power structures in the management of historic buildings and distinguishes other important players in the management process.
Resumo:
A semi-distributed model, INCA, has been developed to determine the fate and distribution of nutrients in terrestrial and aquatic systems. The model simulates nitrogen and phosphorus processes in soils, groundwaters and river systems and can be applied in a semi-distributed manner at a range of scales. In this study, the model has been applied at field to sub-catchment to whole catchment scale to evaluate the behaviour of biosolid-derived losses of P in agricultural systems. It is shown that process-based models such as INCA, applied at a wide range of scales, reproduce field and catchment behaviour satisfactorily. The INCA model can also be used to generate generic information for risk assessment. By adjusting three key variables: biosolid application rates, the hydrological connectivity of the catchment and the initial P-status of the soils within the model, a matrix of P loss rates can be generated to evaluate the behaviour of the model and, hence, of the catchment system. The results, which indicate the sensitivity of the catchment to flow paths, to application rates and to initial soil conditions, have been incorporated into a Nutrient Export Risk Matrix (NERM).
Resumo:
The purpose of this document is to provide a single source of reference for every paper published in the journals directly related to research in Construction Management. It is indexed by author and keyword and contains the titles, authors, abstracts and keywords of every article from the following journals: • Building Research and Information (BRI) • Construction Management and Economics (CME) • Engineering, Construction and Architectural Management (ECAM) • Journal of Construction Procurement (JCP) • Journal of Construction Research (JCR) • Journal of Financial Management in Property and Construction (JFM) • RICS Research Papers (RICS) The index entries give short forms of the bibliographical citations, rather than page numbers, to enable annual updates to the abstracts. Each annual update will carry cumulative indexes, so that only one index needs to be consulted.
Resumo:
A field experiment was conducted in the low country of Sri Lanka, during the period 1994–1995 to investigate the severity of weed infestation and tea growth in relation to weed management methods in newly established tea (Camellia sinensis[L.] Kuntze). Manual weeding (hand and slash weeding) at various intervals was compared with various herbicides, with or without mulching. Weed control with herbicides was superior to that of hand weeding at 6-week intervals or more. Weed control with oxyfluorfen at 0.29 kg ai ha−1 + paraquat at 0.17 kg ai ha−1 or glyphosate at 0.99 kg ai ha−1 + kaolin at 3.42 kg ha−1 were superior. Plots unweeded for 12 weeks or more produced significantly greater (P < 0.05) weed biomass than plots unweeded for 6 weeks. Although the least weed dry weight (P < 0.05) and the greatest number of weed species were recorded with hand weeding at 2 week intervals, there was no particular benefit on tea growth when compared with hand weeding at 6 and 12 week intervals. Inter row mulching in chemically treated plots was more favorable for tea growth than no mulching, while living weed cover in unmulched slash weeded plots suppressed tea growth. A combination of mulching and herbicides, particularly oxyfluorfen and paraquat, followed by hand weeding at least every 6–8 weeks was considered the most appropriate weed management system for young tea.
Resumo:
Modern buildings are designed to enhance the match between environment, spaces and the people carrying out work, so that the well-being and the performance of the occupants are all in harmony. Building services are systems that facilitate a healthy working environment within which workers productivity can be optimised in the buildings. However, the maintenance of these services is fraught with problems that may contribute to up to 50% of the total life cycle cost of the building. Maintenance support is one area which is not usually designed into the system as this is not common practice in the services industry. The other areas of shortfall for future designs are; client requirements, commissioning, facilities management data and post occupancy evaluation feedback which needs to be adequately planned to capture and document this information for use in future designs. At the University of Reading an integrated approach has been developed to assemble the multitude of aspects inherent in this field. The means records required and measured achievements for the benefit of both building owners and practitioners. This integrated approach can be represented in a Through Life Business Model (TLBM) format using the concept of Integrated Logistic Support (ILS). The prototype TLBM developed utilises the tailored tools and techniques of ILS for building services. This TLBM approach will facilitate the successful development of a databank that would be invaluable in capturing essential data (e.g. reliability of components) for enhancing future building services designs, life cycle costing and decision making by practitioners, in particular facilities managers.
Resumo:
One of the most vexing issues for analysts and managers of property companies across Europe has been the existence and persistence of deviations of Net Asset Values of property companies from their market capitalisation. The issue has clear links to similar discounts and premiums in closed-end funds. The closed end fund puzzle is regarded as an important unsolved problem in financial economics undermining theories of market efficiency and the Law of One Price. Consequently, it has generated a huge body of research. Although it can be tempting to focus on the particular inefficiencies of real estate markets in attempting to explain deviations from NAV, the closed end fund discount puzzle indicates that divergences between underlying asset values and market capitalisation are not a ‘pure’ real estate phenomenon. When examining potential explanations, two recurring factors stand out in the closed end fund literature as often undermining the economic rationale for a discount – the existence of premiums and cross-sectional and periodic fluctuations in the level of discount/premium. These need to be borne in mind when considering potential explanations for real estate markets. There are two approaches to investigating the discount to net asset value in closed-end funds: the ‘rational’ approach and the ‘noise trader’ or ‘sentiment’ approach. The ‘rational’ approach hypothesizes the discount to net asset value as being the result of company specific factors relating to such factors as management quality, tax liability and the type of stocks held by the fund. Despite the intuitive appeal of the ‘rational’ approach to closed-end fund discounts the studies have not successfully explained the variance in closed-end fund discounts or why the discount to net asset value in closed-end funds varies so much over time. The variation over time in the average sector discount is not only a feature of closed-end funds but also property companies. This paper analyses changes in the deviations from NAV for UK property companies between 2000 and 2003. The paper present a new way to study the phenomenon ‘cleaning’ the gearing effect by introducing a new way of calculating the discount itself. We call it “ungeared discount”. It is calculated by assuming that a firm issues new equity to repurchase outstanding debt without any variation on asset side. In this way discount does not depend on an accounting effect and the analysis should better explain the effect of other independent variables.
Resumo:
This paper explores the relationship between political ideology and planning in Britain and Sweden, with particular emphasis on the by-passing of the planning system. The prevailing ideology in each country over the last ten years is outlined and the impact on planning identified. The argument is then given in greater depth through case studies of two major projects. For Britain, this involves setting out the main features of Thatcherism and the way that this has changed the purposes underlying planning and created a diversified planning system. This is followed by a case study of Canary Wharf. For Sweden, the consensus culture and the emphasis on participation and decentralisation are discussed. The new planning legislation of 1987 is outlined. These aspects are then contrasted with the fiscal crisis and the development of 'negotiation planning'. These themes are illustrated by a case study of the Globe in Stockholm.
Resumo:
Project management (PM) is a globally recognized discipline and has been widely adopted within the construction industry. Despite advancements in the PM discipline, the ineffective traditional management system, typical of the non-executive PM structure, is still widely used in the Nigerian construction industry. The aim of this paper is thus to explore the challenges facing the adoption of the executive PM structure in Nigeria. The paper first assesses the level of growth of PM in Nigeria using UK best practices as a benchmark and identifies the key PM characteristics in the two countries. Focus group interviews were used to collect the primary data for the study and content analysis was used to present the results in a thematic format. The study revealed the key barriers to the adoption of an executive PM structure in Nigeria as a lack of proper awareness, unfavorable policies, skill shortages, the traditional culture of stakeholders and the absence of a regulatory body. It is recommended that the government, as a major player/client in the Nigerian construction industry, should lead the campaign to change the traditional industry approach to project management. This is necessary if construction stakeholders in Nigeria are to be educated and encouraged towards adopting and putting into practice effective PM.
Resumo:
A flood warning system incorporates telemetered rainfall and flow/water level data measured at various locations in the catchment area. Real-time accurate data collection is required for this use, and sensor networks improve the system capabilities. However, existing sensor nodes struggle to satisfy the hydrological requirements in terms of autonomy, sensor hardware compatibility, reliability and long-range communication. We describe the design and development of a real-time measurement system for flood monitoring, and its deployment in a flash-flood prone 650 km2 semiarid watershed in Southern Spain. A developed low-power and long-range communication device, so-called DatalogV1, provides automatic data gathering and reliable transmission. DatalogV1 incorporates self-monitoring for adapting measurement schedules for consumption management and to capture events of interest. Two tests are used to assess the success of the development. The results show an autonomous and robust monitoring system for long-term collection of water level data in many sparse locations during flood events.
Resumo:
Bacterial transformation of phosphorus (P) compounds in soil is largely dependent on soil microbial community function, and is therefore sensitive to anthropogenic disturbances such as fertilization or cropping systems. However, the effect of soil management on the transcription of bacterial genes that encode phosphatases, such as phoD, is largely unknown. This greenhouse study examined the effect of long-term management and P amendment on potential alkaline phosphatase (ALP) activity and phoD gene (DNA) and transcript (RNA) abundance. Soil samples (0–15 cm) were collected from the Glenlea Long-term Rotation near Winnipeg, Manitoba, to compare organic, conventional and prairie management systems. In the greenhouse, pots of soil from each management system were amended with P as either soluble mineral fertilizer or cattle manure and then planted with Italian ryegrass (Lolium multiforum). Soils from each pot were sampled for analysis immediately and after 30 and 106 days. Significant differences among the soil/P treatments were detected for inorganic P, but not the organic P in NaHCO3-extracts. At day 0, ALP activity was similar among the soil/P treatments, but was higher after 30 days for all P amendments in soil from organically managed plots. In contrast, ALP activity in soils under conventional and prairie management responded to increasing rates of manure only, with significant effects from medium and high manure application rates at 30 and 106 days. Differences in ALP activity at 30 days corresponded to the abundance of bacterial phoD genes, which were also significantly higher in soils under organic management. However, this correlation was not significant for transcript abundance. Next-generation sequencing allowed the identification of 199 unique phoD operational taxonomic units (OTUs) from the metagenome (soil DNA) and 35 unique OTUs from the metatranscriptome (soil RNA), indicating that a subset of phoD genes was being transcribed in all soils.