114 resultados para research capacity building


Relevância:

30.00% 30.00%

Publicador:

Resumo:

According to the Chinese State Council's "Building Energy Efficiency Management Ordinance", a large-scale investigation of energy efficiency (EE) in buildings in contemporary China has been carried out in 22 provincial capitals and major cities in China. The aim of this project is to provide reliable information for drawing up the "Decision on reinforcing building energy efficiency" by the Ministry of Construction of China. The surveyed organizations include government departments, research institutions, property developers, design institutions, construction companies, construction consultancy services companies, facility management departments, financial institutions and those which relate to the business of building energy efficiency. In addition, representatives of the media and residents were also involved. A detailed analysis of the results of the investigation concerning aspects of the cur-rent situation and trends in building energy consumption, energy efficiency strategy and the implementation of energy efficiency measures has been conducted. The investigation supplies essential information to formulate the market entrance policy for new buildings and the refurbishment policy for existing buildings to encourage the development of energy efficient technology.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The application of prediction theories has been widely practised for many years in many industries such as manufacturing, defence and aerospace. Although these theories are not new, their application has not been widely used within the building services industry. Collectively, the building services industry should take a deeper look at these approaches in comparison with the traditional deterministic approaches currently being practised. By extending the application into this industry, this paper seeks to provide the industry with an overview of how simplified stochastic modelling coupled with availability and reliability predictions using historical data compiled from various sources could enhance the quality of building services systems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Mathematical models devoted to different aspects of building studies and brought about a significant shift in the way we view buildings. From this background a new definition of building has emerged known as intelligent building that requires integration of a variety of computer-based complex systems. Research relevant to intelligent continues to grow at a much faster pace. This paper is a review of different mathematical models described in literature, which make use of different mathematical methodologies, and are intended for intelligent building studies without complex mathematical details. Models are discussed under a wide classification. Mathematical abstract level of the applied models is detailed and integrated with its literature. The goal of this paper is to present a comprehensive account of the achievements and status of mathematical models in intelligent building research. and to suggest future directions in models.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this research is to show that reliability analysis and its implementation will lead to an improved whole life performance of the building systems, and hence their life cycle costs (LCC). Design/methodology/approach – This paper analyses reliability impacts on the whole life cycle of building systems, and reviews the up-to-date approaches adopted in UK construction, based on questionnaires designed to investigate the use of reliability within the industry. Findings – Approaches to reliability design and maintainability design have been introduced from the operating environment level, system structural level and component level, and a scheduled maintenance logic tree is modified based on the model developed by Pride. Different stages of the whole life cycle of building services systems, reliability-associated factors should be considered to ensure the system's whole life performance. It is suggested that data analysis should be applied in reliability design, maintainability design, and maintenance policy development. Originality/value – The paper presents important factors in different stages of the whole life cycle of the systems, and reliability and maintainability design approaches which can be helpful for building services system designers. The survey from the questionnaires provides the designers with understanding of key impacting factors.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper identifies the indicators of energy efficiency assessment in residential building in China through a wide literature review. Indicators are derived from three main sources: 1) The existing building assessment methods; 2)The existing Chinese standards and technology codes in building energy efficiency; 3)Academia research. As a result, we proposed an indicator list by refining the indicators in the above sources. Identified indicators are weighted by the group analytic hierarchy process (AHP) method. Group AHP method is implemented following key steps: Step 1: Experienced experts are selected to form a group; Step 2: A survey is implemented to collect the individual judgments on the importance of indicators in the group; Step 3: Members’ judgments are synthesized to the group judgments; Step 4: Indicators are weighted by AHP on the group judgments; Step 5: Investigation of consistency estimation shows that the consistency of the judgment matrix is accepted. We believe that the weighted indicators in this paper will provide important references to building energy efficiency assessment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The People's Republic of China and its 1.3 billion people have experienced a rapid economic growth in the past two decades. China's urbanisation ratio rose from around 20% in the early 1980s to 45% in 2007 [China Urban Research Committee. Green building. Beijing: Chinese Construction Industrial Publish House; 2008. ISBN 978-7-112-09925-2.]. The large volume and rapid speed of building construction rarely have been seen in global development and cause substantial pressure on resources and the environment. Government policy makers and building professionals, including architects, building engineers, project managers and property developers, should play an important role in enhancing the planning, design, construction, operation and maintenance of the building energy efficiency process in forming the sustainable urban development. This paper addresses the emerging issues relating to building energy consumption and building energy efficiency due to the fast urbanisation development in China.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper introduces an international collaboration of EU and Asia in education, training and research in the field of sustainable built environment, which attempts to develop a network of practical and intellectual knowledge and training exchange between Chinese and European Universities in the field of sustainable building design and construction. The projects funded by the European Commission Asia Link program, UK Foreign & Commonwealth Office, British Council and the UK Engineering Physical Sciences Council (EPSRC) have been introduced. The projects have significant impacts on promoting sustainable development in built environment in China. The aim of this paper is to share the experiences with those who are interested and searching the ways to collaborate with China in education and research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Multi-agent systems have been adopted to build intelligent environment in recent years. It was claimed that energy efficiency and occupants' comfort were the most important factors for evaluating the performance of modem work environment, and multi-agent systems presented a viable solution to handling the complexity of dynamic building environment. While previous research has made significant advance in some aspects, the proposed systems or models were often not applicable in a "shared environment". This paper introduces an ongoing project on multi-agent for building control, which aims to achieve both energy efficiency and occupants' comfort in a shared environment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper investigates whether and to what extent a wide range of actors in the UK are adapting to climate change, and whether this is evidence of a social transition. We document evidence of over 300 examples of early adopters of adaptation practice to climate change in the UK. These examples span a range of activities from small adjustments (or coping) to building adaptive capacity, implementing actions and creating deeper systemic change in public and private organisations in a range of sectors. We find that adaptation in the UK has been dominated by government initiatives and has principally occurred in the form of research into climate change impacts. These actions within government stimulate a further set of actions at other scales in public agencies, regulatory agencies and regional government (or in the devolved administrations), though with little real evidence of climate change adaptation initiatives trickling down to local government level. The water supply and flood defence sectors, requiring significant investment in large scale infrastructure such as reservoirs and coastal defences, have invested more heavily in identifying potential impacts and adaptations. Economic sectors that are not dependent on large scale infrastructure appear to be investing far less effort and resources in preparing for climate change. We conclude that while the government-driven top-down targeted adaptation approach has generated anticipatory action at low cost, it may also have created enough niche activities to allow for diffusion of new adaptation practices in response to real or perceived climate change. These results have significant implications for how climate policy can be developed to support autonomous adaptors in the UK and other countries.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper assesses the potential for using building integrated photovoltaic (BIPV) roof shingles made from triple-junction amorphous silicon (3a-Si) for electrification and as a roofing material in tropical countries, such as Accra, Ghana. A model roof was constructed using triple-junction amorphous (3a-Si) PV on one section and conventional roofing tiles on the other. The performance of the PV module and tiles were measured, over a range of ambient temperatures and solar irradiance. PVSyst (a computer design software) was used to determine the most appropriate angle of tilt. It was observed that 3a-Si performs well in conditions such as Accra, because it is insensitive to high temperatures. Building integration gives security benefits, and reduces construction costs and embodied energy, compared to freestanding PV systems. Again, it serves as a means of protection from salt spray from the oceans and works well even when shaded. However, compared to conventional roofing materials, 3a-Si would increase the indoor temperature by 1-2 °C depending on the surface area of the roof covered with the PV modules. The results presented in this research enhance the understanding of varying factors involved in the selection of an appropriate method of PV installation to offset the short falls of the conventional roofing material in Ghana.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

IPLV overall coefficient, presented by Air-Conditioning and Refrigeration Institute (ARI) of America, shows running/operation status of air-conditioning system host only. For overall operation coefficient, logical solution has not been developed, to reflect the whole air-conditioning system under part load. In this research undertaking, the running time proportions of air-conditioning systems under part load have been obtained through analysis on energy consumption data during practical operation in all public buildings in Chongqing. This was achieved by using analysis methods, based on the statistical energy consumption data distribution of public buildings month-by-month. Comparing with the weight number of IPLV, part load operation coefficient of air-conditioning system, based on this research, does not only show the status of system refrigerating host, but also reflects and calculate energy efficiency of the whole air-conditioning system. The coefficient results from the processing and analyzing of practical running data, shows the practical running status of area and building type (actual and objective) – not clear. The method is different from model analysis which gets IPLV weight number, in the sense that this method of coefficient results in both four equal proportions and also part load operation coefficient of air-conditioning system under any load rate as necessary.