66 resultados para 0914 Resources Engineering and Extractive Metallurgy
Resumo:
Evolutionary meta-algorithms for pulse shaping of broadband femtosecond duration laser pulses are proposed. The genetic algorithm searching the evolutionary landscape for desired pulse shapes consists of a population of waveforms (genes), each made from two concatenated vectors, specifying phases and magnitudes, respectively, over a range of frequencies. Frequency domain operators such as mutation, two-point crossover average crossover, polynomial phase mutation, creep and three-point smoothing as well as a time-domain crossover are combined to produce fitter offsprings at each iteration step. The algorithm applies roulette wheel selection; elitists and linear fitness scaling to the gene population. A differential evolution (DE) operator that provides a source of directed mutation and new wavelet operators are proposed. Using properly tuned parameters for DE, the meta-algorithm is used to solve a waveform matching problem. Tuning allows either a greedy directed search near the best known solution or a robust search across the entire parameter space.
Resumo:
This study puts forward a method to model and simulate the complex system of hospital on the basis of multi-agent technology. The formation of the agents of hospitals with intelligent and coordinative characteristics was designed, the message object was defined, and the model operating mechanism of autonomous activities and coordination mechanism was also designed. In addition, the Ontology library and Norm library etc. were introduced using semiotic method and theory, to enlarge the method of system modelling. Swarm was used to develop the multi-agent based simulation system, which is favorable for making guidelines for hospital's improving it's organization and management, optimizing the working procedure, improving the quality of medical care as well as reducing medical charge costs.
Resumo:
The construction industry is widely being criticised as a fragmented industry. There are mounting calls for the industry to change. The espoused change calls for collaboration as well as embracing innovation in the process of design, construction and across the supply chain. Innovation and the application of emerging technologies are seen as enablers for integrating the processes ‘integrating the team’ such as building information modelling (BIM). A questionnaire survey was conducted to ascertain change in construction with regard to design management, innovation and the application of BIM as cutting edge pathways for collaboration. The respondents to the survey were from an array of designations across the construction industry such as construction managers, designers, engineers, design coordinators, design managers, architects, architectural technologists and surveyors. There was a general agreement by most respondents that the design team was responsible for design management in their organisation. There is a perception that the design manager and the client are the catalyst for advancing innovation. The current state of industry in terms of incorporating BIM technologies is posing a challenge as well as providing an opportunity for accomplishment. BIM technologies provide a new paradigm shift in the way buildings are designed, constructed and maintained. This paradigm shift calls for rethinking the curriculum for educating building professionals, collectively.
Resumo:
Agro-hydrological models have widely been used for optimizing resources use and minimizing environmental consequences in agriculture. SMCRN is a recently developed sophisticated model which simulates crop response to nitrogen fertilizer for a wide range of crops, and the associated leaching of nitrate from arable soils. In this paper, we describe the improvements of this model by replacing the existing approximate hydrological cascade algorithm with a new simple and explicit algorithm for the basic soil water flow equation, which not only enhanced the model performance in hydrological simulation, but also was essential to extend the model application to the situations where the capillary flow is important. As a result, the updated SMCRN model could be used for more accurate study of water dynamics in the soil-crop system. The success of the model update was demonstrated by the simulated results that the updated model consistently out-performed the original model in drainage simulations and in predicting time course soil water content in different layers in the soil-wheat system. Tests of the updated SMCRN model against data from 4 field crop experiments showed that crop nitrogen offtakes and soil mineral nitrogen in the top 90 cm were in a good agreement with the measured values, indicating that the model could make more reliable predictions of nitrogen fate in the crop-soil system, and thus provides a useful platform to assess the impacts of nitrogen fertilizer on crop yield and nitrogen leaching from different production systems. (C) 2010 Elsevier B.V. All rights reserved.
Resumo:
The development of versatile bioactive surfaces able to emulate in vivo conditions is of enormous importance to the future of cell and tissue therapy. Tuning cell behaviour on two-dimensional surfaces so that the cells perform as if they were in a natural three-dimensional tissue represents a significant challenge, but one that must be met if the early promise of cell and tissue therapy is to be fully realised. Due to the inherent complexities involved in the manufacture of biomimetic three-dimensional substrates, the scaling up of engineered tissue-based therapies may be simpler if based upon proven two-dimensional culture systems. In this work, we developed new coating materials composed of the self-assembling peptide amphiphiles (PAs) C16G3RGD (RGD) and C16G3RGDS (RGDS) shown to control cell adhesion and tissue architecture while avoiding the use of serum. When mixed with the C16ETTES diluent PA at 13 : 87 (mol mol-1) ratio at 1.25 times 10-3 M, the bioactive {PAs} were shown to support optimal adhesion, maximal proliferation, and prolonged viability of human corneal stromal fibroblasts ({hCSFs)}, while improving the cell phenotype. These {PAs} also provided stable adhesive coatings on highly-hydrophobic surfaces composed of striated polytetrafluoroethylene ({PTFE)}, significantly enhancing proliferation of aligned cells and increasing the complexity of the produced tissue. The thickness and structure of this highly-organised tissue were similar to those observed in vivo, comprising aligned newly-deposited extracellular matrix. As such, the developed coatings can constitute a versatile biomaterial for applications in cell biology, tissue engineering, and regenerative medicine requiring serum-free conditions.
Resumo:
This paper reports part of a qualitative study into evolving practice in the implementation of the Dispute Adjudication Board (DAB) construction dispute resolution technique, a variant of the Dispute Review Board (DRB) concept used in the US and Canada. Data was collected through a focus group interview of 20 highly experienced dispute resolution practitioners from engineering and the law. The group was assembled from members of FIDIC-NET with direct experience of project DABs. The part reported here concerns practice and procedure for establishing DABs. The main findings are that: constitution of the DABs is often delayed because of either project owners' ignorance of the DAB process or deterrence by the cost of the DABs; such owners also tend to insist on appointing DAB members from local engineers and lawyers without sufficient understanding of the DAB process; rates of remuneration of DAB members vary widely; the training provision for DAB membership and advocacy skills is inadequate; the process of selecting candidates for DAB membership and negotiating the tripartite agreement between each member and the contractual parties needs to be navigated with great care to avoid raising ethical problems. The research contribution is threefold. First, it highlights the importance of realistic fees for DAB members within a standard framework in achieving timely establishment of a board that works well as a team. Second, it illustrates the use of qualitative focus group interview to study the impact of new contract terms from multiple stakeholder perspectives. Finally, it identifies areas where further research is needed.
Resumo:
Project management (PM) is a globally recognized discipline and has been widely adopted within the construction industry. Despite advancements in the PM discipline, the ineffective traditional management system, typical of the non-executive PM structure, is still widely used in the Nigerian construction industry. The aim of this paper is thus to explore the challenges facing the adoption of the executive PM structure in Nigeria. The paper first assesses the level of growth of PM in Nigeria using UK best practices as a benchmark and identifies the key PM characteristics in the two countries. Focus group interviews were used to collect the primary data for the study and content analysis was used to present the results in a thematic format. The study revealed the key barriers to the adoption of an executive PM structure in Nigeria as a lack of proper awareness, unfavorable policies, skill shortages, the traditional culture of stakeholders and the absence of a regulatory body. It is recommended that the government, as a major player/client in the Nigerian construction industry, should lead the campaign to change the traditional industry approach to project management. This is necessary if construction stakeholders in Nigeria are to be educated and encouraged towards adopting and putting into practice effective PM.
Resumo:
Dispersion in the near-field region of localised releases in urban areas is difficult to predict because of the strong influence of individual buildings. Effects include upstream dispersion, trapping of material into building wakes and enhanced concentration fluctuations. As a result, concentration patterns are highly variable in time and mean profiles in the near field are strongly non-Gaussian. These aspects of near-field dispersion are documented by analysing data from direct numerical simulations in arrays of building-like obstacles and are related to the underlying flow structure. The mean flow structure around the buildings is found to exert a strong influence over the dispersion of material in the near field. Diverging streamlines around buildings enhance lateral dispersion. Entrainment of material into building wakes in the very near field gives rise to secondary sources, which then affect the subsequent dispersion pattern. High levels of concentration fluctuations are also found in this very near field; the fluctuation intensity is of order 2 to 5.
Resumo:
In this study, dual-hop channel state information-assisted amplify-and-forward (AF) cooperative systems in the presence of in-phase and quadrature-phase (I/Q) imbalance, which refers to the mismatch between components in the I and Q branches, are investigated. First, the authors analyse the performance of the considered AF cooperative protocol without compensation for the I/Q imbalance as the benchmark. Then, a compensation algorithm for the I/Q imbalance is proposed, which makes use of the received signals at the destination, from the source and the relay nodes, together with their conjugations to detect the transmitted signal. Moreover, the authors study the considered AF cooperative system implemented with the opportunistic relay selection and the proposed compensation mechanism for the I/Q imbalance. The performance of the AF cooperative system under study is evaluated in terms of average symbol error probability, which is derived by considering transmission in a Rayleigh fading environment. Numerical results are provided and show that the proposed compensation algorithm can efficiently mitigate the effect of the I/Q imbalance. On the other hand, it is observed that the AF cooperative system with opportunistic relay selection acquires a performance gain beyond that without relay selection.
Resumo:
We analyze the migration behavior of graduates from UK universities with a focus on the salary benefits they receive from the migration process. We focus on sequential interregional migration and specifically examine the case of Science, Technology, Engineering and Mathematics (STEM) and Creative subject graduates. Our analysis differs from previous studies in that it accounts explicitly for migrant selectivity through propensity score matching, and it also classifies graduates into different migration behavior categories. Graduates were classified according to their sequential migration behavior first from their pre-university domicile to university and then from university to first job post-graduation. Our results show that ‘repeat migration’, as expected, is associated with the highest wage premium (around 15%). Other migration behaviors are also advantageous although this varies across different types of graduates. Creative graduates, for instance, do not benefit much from migration behaviors other than repeat migration. STEM graduates, on the contrary, benefit from both late migration and staying in the university area to work.
Resumo:
he construction market around the world has witnessed the growing eminence of construction professional services (CPSs), such as urban planning, architecture, engineering, and consultancy, while the traditional contracting sector remains strong. Nowadays, it is not uncommon to see a design firm taking over the work of a traditional main contractor, or vice versa, of overseeing the delivery of a project. Although the two sectors of contracting and CPS share the same purpose of materializing the built environment, they are as different as they are interrelated. Much has been mentioned about the nexus between the two but little has been done to articulate it using empirical evidence. This study examined the nexus between contracting and CPS businesses by offering and testing lead-lag effects between the two sectors in the international market. A longitudinal panel data composed of 23 top international contractors and CPS firms was adopted. Surprisingly, results of the panel data analyses show that CPS business does not have a significant positive causal effect on contracting as a downstream business, and vice versa. CPS and contracting subsidiaries, although within the same company, do not necessarily form a consortium to undertake the same project; rather, they often collaborate with other CPS or contracting counterparts to undertake projects. This paper provides valuable insights into the sophisticated nexus between contracting and CPS in the international construction market. It will support business executives’ rational decision making for selecting proper contracting or CPS allies, or a proper mergers and acquisitions strategy in the international market. The paper also provides a fresh perspective through which researchers can better investigate the diversification strategies adopted by international contracting and CPS firms.
Resumo:
The set of transreal numbers is a superset of the real numbers. It totalises real arithmetic by defining division by zero in terms of three def- inite, non-finite numbers: positive infinity, negative infinity and nullity. Elsewhere, in this proceedings, we extended continuity and limits from the real domain to the transreal domain, here we extended the real derivative to the transreal derivative. This continues to demonstrate that transreal analysis contains real analysis and operates at singularities where real analysis fails. Hence computer programs that rely on computing deriva- tives { such as those used in scientific, engineering and financial applica- tions { are extended to operate at singularities where they currently fail. This promises to make software, that computes derivatives, both more competent and more reliable. We also extended the integration of absolutely convergent functions from the real domain to the transreal domain.
Resumo:
The IEEE 754 standard for oating-point arithmetic is widely used in computing. It is based on real arithmetic and is made total by adding both a positive and a negative infinity, a negative zero, and many Not-a-Number (NaN) states. The IEEE infinities are said to have the behaviour of limits. Transreal arithmetic is total. It also has a positive and a negative infinity but no negative zero, and it has a single, unordered number, nullity. We elucidate the transreal tangent and extend real limits to transreal limits. Arguing from this firm foundation, we maintain that there are three category errors in the IEEE 754 standard. Firstly the claim that IEEE infinities are limits of real arithmetic confuses limiting processes with arithmetic. Secondly a defence of IEEE negative zero confuses the limit of a function with the value of a function. Thirdly the definition of IEEE NaNs confuses undefined with unordered. Furthermore we prove that the tangent function, with the infinities given by geometrical con- struction, has a period of an entire rotation, not half a rotation as is commonly understood. This illustrates a category error, confusing the limit with the value of a function, in an important area of applied mathe- matics { trigonometry. We brie y consider the wider implications of this category error. Another paper proposes transreal arithmetic as a basis for floating- point arithmetic; here we take the profound step of proposing transreal arithmetic as a replacement for real arithmetic to remove the possibility of certain category errors in mathematics. Thus we propose both theo- retical and practical advantages of transmathematics. In particular we argue that implementing transreal analysis in trans- floating-point arith- metic would extend the coverage, accuracy and reliability of almost all computer programs that exploit real analysis { essentially all programs in science and engineering and many in finance, medicine and other socially beneficial applications.
Resumo:
Understanding how and why the capability of one set of business resources, its structural arrangements and mechanisms compared to another works can provide competitive advantage in terms of new business processes and product and service development. However, most business models of capability are descriptive and lack formal modelling language to qualitatively and quantifiably compare capabilities, Gibson’s theory of affordance, the potential for action, provides a formal basis for a more robust and quantitative model, but most formal affordance models are complex and abstract and lack support for real-world applications. We aim to understand the ‘how’ and ‘why’ of business capability, by developing a quantitative and qualitative model that underpins earlier work on Capability-Affordance Modelling – CAM. This paper integrates an affordance based capability model and the formalism of Coloured Petri Nets to develop a simulation model. Using the model, we show how capability depends on the space time path of interacting resources, the mechanism of transition and specific critical affordance factors relating to the values of the variables for resources, people and physical objects. We show how the model can identify the capabilities of resources to enable the capability to inject a drug and anaesthetise a patient.
Resumo:
Accident and Emergency (A&E) units provide a route for patients requiring urgent admission to acute hospitals. Public concern over long waiting times for admissions motivated this study, whose aim is to explore the factors which contribute to such delays. The paper discusses the formulation and calibration of a system dynamics model of the interaction of demand pattern, A&E resource deployment, other hospital processes and bed numbers; and the outputs of policy analysis runs of the model which vary a number of the key parameters. Two significant findings have policy implications. One is that while some delays to patients are unavoidable, reductions can be achieved by selective augmentation of resources within, and relating to, the A&E unit. The second is that reductions in bed numbers do not increase waiting times for emergency admissions, their effect instead being to increase sharply the number of cancellations of admissions for elective surgery. This suggests that basing A&E policy solely on any single criterion will merely succeed in transferring the effects of a resource deficit to a different patient group.